... construction of column will be start from stump columns or ground beams (with Ground FloorColumns) and from 1st floor to the roof Column construction will resume at least one day aftercasting of concrete ... GFL+7.250 to the bottom of rafter).Hereafter is the list of columns from 1st floor to the roof: Trang 137 FLOW CHART AND DIRECTION OF WORKThe work sequence of construction the RC Columns is shown at ... (from top of ground beams/stump columns to thebottom of 1st floor beams GFL+ 6.15) Hereafter is the list of columns from ground floor to 1st floor: Trang 12- On 1st floor, there are 92 RC columns...
Ngày tải lên: 20/10/2016, 14:57
... This method statement will be applied for first floor (level +7.250m).Construction work of this slab will be repeatedly carried out after s underneath columns completed Theconstructions of columns ... 25Unloading reinforcement from trailer by a suitable crane for lifting up reinforcement bundles.Prior to fabrication of reinforcement, samples shall be taken from each batch of each size of each delivery ... directly on columns Secondary beams: supported on main beams 7 FLOW CHART AND DIRECTION OF WORK SMC-Factory No.1/MS-RC 1FL slab Page 11 Trang 12The work sequence of construction the RC 1FL slab...
Ngày tải lên: 20/10/2016, 15:08
... describes the procedures and method for carrying out the construction works for Slab onGrade of building factory No.1 This method statement will be applied after completion of the RCstructures such as ... process of Trang 22The rails are made from D20 steel pipes placed on top of the adjusting support D10 The rails are placed alongsides of each cast area at interval 3.7m to suit with length of screeding ... surface of formwork must be clean of dirt, loose concrete and to be applied the release agent, if needed Unloading reinforcement from trailer by a suitable crane for lifting up reinforcement...
Ngày tải lên: 20/10/2016, 15:05
4. Method Statement of Bored Pile - Vie
... thẳng đứng và luôncó công nhân để kiểm tra độ thẳng đứng của cần khoan Trang 14kelly barCasing Bottom EL Supplying betonite liquid Bentonite liquid Nhà thầu sẽ sử dụng máy khoan mùn ... tácvệ sinh lỗ khoan Casing Bentonite liquid Submerged pump Discharge used bentonite liquid to circulation tank Replace Bentonite Liquid 3.4 Lắp đặt lồng thép vào lỗ khoan Gia công lồng thép ... cao độcủa đáy lỗ khoan Bottom EL Casing Bentonite liquid Equipment to take bentonite at bottom of bored hole ...
Ngày tải lên: 08/02/2018, 10:19
2.Method Statement of Bored Pile - Eng
... P a g e Trang 2Method Statement of Bored Pile ConstructionAppendix 2: Equipment and manpower Appendix 3: Plan of drawing construction method of bored pile Appendix 4: Sequence of construction ... This method statement describes the procedure and the quantity control for construction of boredpile d=1.2m The drilling method will be apply the earth drilling method The method consist ofthe ... separately Construction and Measurement of Bored PilesBored Piles – Determination of identify of concrete –Pulsed ultrasonic method Bored Piles – Method of detection of defects by lowstrain dynamic test...
Ngày tải lên: 08/02/2018, 10:23
Construction method statement of steel stucture
... before move on roofing Installation - Roof panel will roll on the ground, then crane will lift on the roof for installing - Making the roof panel with full length of one side roof Trang 8- By this ... water roofing.- Cleaning up the roof and finish work for steel structure part - Wall panels will rolled on the direct ground Purlin Steel column Safety belt Safety belt Trang 9II Method of safety, ... the columns - After all works, using the scaffolds for workers remove the crane out of the columns Trang 4 Step 2: Bracer and beam installation: - Bracers and beams are parallel installing to column...
Ngày tải lên: 28/05/2018, 01:15
Biện pháp thi công thang máng cáp method statement of ladder
... installation of Cable Ladders, Cable Tray & cable Trunking Để miêu tả những việc liên quan đến việc lắp đặt thang đỡ cáp, khay cáp & máng cáp. 2.0 SCOPE OF WORKS: PHẠM VI CÔNG VIỆC This method statement ... nối thích đáng để phù hợp với ranh giới của những điểm nối. When there are areas of tee-offs, bends, and offsets, standard fittings shall be used Khi có những khu vực của ngã ba, chổ uốn ... Lắp đặt các dây đồng nối đất để đảm bảo tính liên tục về điện When there are areas of tee-offs, bends, and offsets, standard fittings shall be used Khi có những khu vực của ngã ba, chổ uốn...
Ngày tải lên: 21/03/2021, 15:09
Construction method statement of erection of super t girder
... Assembling, installation of gantry crane on site Transportation of Super T girder Erection of Super T girder Disassembling and Moving of gantry crane to next span Installation of transversal beam ... installation of gantry crane on site 7 3.3 Bearing installation and grouting 8 3.4 Installation of transversal beam on pier 9 3.5 Installation of gantry crane on pier 12 3.6 Transportation of Super ... checking and inspection with attention of theEngineer - Installation of bearing Trang 10Sketch 1: Installing of bearing seat for elastomeric bearing3.3.2 Installing of Pot bearings - Install working...
Ngày tải lên: 04/09/2021, 02:25
VA2 OM MS ME ES 001 method statement of electrical system rev 0
... sufficient number of health and safety supervisors relative to the total workforce of subcontractors These supervisors play a crucial role in assisting the health and safety officer and enforcing the ... architect drawing for make detail installation of lightning pole, cable and test box - Determine actual type of material as per location need to install flow to approval drawing - The Safety Officer ... HSE Manager, along with an adequate number of Superintendents, Supervisors, and Officers The quantity of these personnel must correspond to the number of direct work employees and the various work...
Ngày tải lên: 15/05/2022, 15:01
VA2 OM MS ME WS 004 method statement of water system rev 0
... regulation on rules of classification and grading of Civil and industrial buildings and urban infrastructures promulgated with circular No.12/2012/ TT-BXD dated 28/12/2012 of the ministry of construction ... installation of the system - Conduct the system pressure test * Detail installation of corridor horizontal pipe follow in approved shop drawing : Horizontal distance of pipe hanger Vertical distance of ... the contractor conducts aligning throats of the equipment according to specifications of equipment with ruler and leveling 5.1.2 Construction method of outdoor pipe system installation: a Preparation...
Ngày tải lên: 15/05/2022, 15:04
VA2 OM MS ME EL 002 method statement of extra low voltage system rev 0
... number of H&S supervisors are present on-site, relative to the total workforce of subcontractors These supervisors are essential for supporting the H&S officer and ensuring proper enforcement of ... EIA/TIA-568 Commercial Building Wiring Standard (superceded by TIA/EIA-11 TIA/EIA-568-A Commercial Building Wiring Standard (superceded by TIA/EIA-Additional Horizontal Cabling Practices for Open Offices ... and procedures 6.2.3 Responsibilities of H&S Officers (Engineers & staffs) - The H&S officers shall assist the H&S Manager by ensuring that the provisions of the H&S plan and other H&S related...
Ngày tải lên: 15/05/2022, 15:05
Method statement of jet grouting Biện pháp thi công bơm phụt vữa
... đào The Method Jet Grouting is selected to be the solution to reinforcement and waterproof treatment for defects of the diaphragm wall panel PN1-15 at the project of "COMPLEX BUILDING OF HOTEL, ... HOTEL, SHOPPING MALLS AND OFFICES FOR RENT" Purpose of this method is to create soilcement piles with a diameter of 1000mm to surround the outside of defect positions of the diaphragm wall to ... GROUTINGMETHOD STATEMENT OF JET GROUTING Trang 2MỤC LỤC / CONTENT1 GIỚI THIỆU CHUNG / INTRODUCTION 3 1.1 Tổng quan / General 3 1.2 Mục tiêu công việc / Works 4 1.3 Phạm vi công việc / Scope of work...
Ngày tải lên: 12/07/2022, 10:22
Thuyết minh biện pháp bê tông khối lớn dự án METHOD STATEMENT OF MASS FOUNDATION
... khác Basic of the established methods statement Construction method statements are established according to the below: - Drawings of construction technique design - Specification of Landmark81 ... sơ thiết kế bản vẽ thi công kết cấu đài móng của dự án “ andmark 81” Profile of construction drawing design of pile cap of the Project Landmark 81 - Chỉ dẫn kỹ thuật của dự án “ andmark81” do ... kiểm tra theo từng lô Reinforcing steel is fabricated on site to ensure appropriate level of mechanical quantities corresponding to the processing of steel Reinforcing steel is cut, bent in accordance...
Ngày tải lên: 15/04/2024, 17:04
Method statement of precasting I Beam ( Biện pháp thi công đúc sẵn dầm I )
... 1980-2019DESCRIPTION OF WORKSScope of WorksThis is Method Statement for production of prestressed concrete I-girders (PC-I Girders) for superstructure Summary table of PC-I Girder: No Type of I girder ... production of PC I-girder. b) Fabrication of reinforcing steel bar Material test of rebar shall be carried out in accordance with Tecnical Specification of Project. Reinforcing Bars shall be kept off ... of reinforcement for payment.Lap splices in reinforced concrete structures require specific dimensions for tensile and compressive reinforcement Tensile reinforcement must have a lap length of...
Ngày tải lên: 16/09/2024, 10:22
Method Statement of Brickwork
... method statement Most of brickwork are for walls of Utilities Building and will be applied from the ground to 1st floor of building All walls will close the spaces between concrete structures of column ... for testing Determination of pH of water Determination of organic contaminants in water Determination of total dissolved salt content in water Method for determination of concrete strength Assembled ... Dimensions: x 20 (cm), reinforced with main bar of 2D12 and stirrup of D6@200 For double skin: Dimensions: 18 x 20 (cm), reinforced with main bar of 4D12 and stirrup of D6@200 Concrete for R.C...
Ngày tải lên: 20/10/2016, 14:37
Method Statement of Foundation
... XÂY LẮP THƯƠNG MẠI Architects & Construction Service Corporation METHOD STATEMENT FOR RC FOOTINGS Contents SMC-Factory No.1/MS-Footings Page CÔNG TY CỔ PHẦN XÂY LẮP THƯƠNG MẠI Architects & Construction ... volume of concrete of footings and stump columns occupied in excavation The volume of excavated soil, volume occupied with concrete and remaining stock soils are shown in table below: VOLUME OF EXCAVATED ... TRIỂU CÔNG TY CỔ PHẦN XÂY LẮP THƯƠNG MẠI Architects & Construction Service Corporation FLOW CHART AND DIRECTION OF WORK The work sequence of construction the RC footings is shown at the following...
Ngày tải lên: 20/10/2016, 14:48
Method Statement of Painting work
... system (Interior and Exterior): • • • • bags of putty of 20kg /bag cans of sealer of litres /can cans of AEP paint of litres /can painted sample panels of size A4 with all proposed coats i Materials ... made of the works at the following times: Materials Delivery to Site Completion of surface preparation After application of prime or seal coats After application of undercoat After application of ... XÂY LẮP THƯƠNG MẠI Architects & Construction Service Corporation INTRODUCTION 1.1 GENERAL This method statement describes the methodology for Emulsion Painting on surface of concrete and plaster...
Ngày tải lên: 20/10/2016, 14:55
modeling of frp-jacketed rc columns subject to combined axial and lateral loads
... Summary of Ultimate State Predictions on the 14 × 14 Columns 242 Table 6.6: Summary of Load-Displacement Analyses of 14 × 14 Columns 244 Table 6.7: Influence of Number of CFRP Wraps on Column ... reinforcement” on RC columns was developed by researchers from UCSD and elsewhere The concept of the FRP overlay technique was originally developed by UCSD for the seismic retrofits of reinforced ... strengthening of existing concrete columns in last decades For the seismic retrofit of RC columns, the function of the FRP composite overlay is to provide additional shear capacity to columns to...
Ngày tải lên: 13/11/2014, 10:03
Numerical modeling of RC and ECC encased RC columns subjected to close in explosion
... 174 Table of Contents 7.2 Elastic Analysis of Standalone Cantilever RC Column 175 7.2.1 SDOF Analysis using Direct Integration Method 175 7.2.1.1 Derivation of Equivalent SDOF Method – ... of quarter scale RC column Figure 4.4 Side view of RC column (a) Minor axis view (b) Major axis view Figure 4.5 Direct tensile stress-strain curve of ECC of fc=55MPa Figure 4.6 Construction of ... responses of SDOF analysis of the cantilever RC column subjected to triangular blast pressure Figure 7.25 Inelastic peak SDOF lateral displacements plotted against tD/T ratio of the cantilever RC column...
Ngày tải lên: 11/09/2015, 10:14
Principles of Accounting- Preparing the Statement of Cash Flows
... Discussion on the Statement of Cash Flows Two items usually shown on the statement of cash flow in the indirect method: Profits or losses from sales of fixed assets (investing) Profits or losses ... Preparing the Statement of Cash Flows Indirect Method In addition to the direct method of calculating cash flows from operations, the indirect method is also used The indirect method proves to ... Sources and Uses Bo Ho Company The statement of cash sources and uses is the precursor of the statement of cash flows; it looks like a “random collection” of plus and minus signs (changes in...
Ngày tải lên: 26/10/2013, 17:15