... Technical specification+ Section 5.1: Concrete of Specifications + Section 5.2: Reinforcement of Specifications + Section 5.4: Prestressed ConcreteConstruction ScheduleConstruction Schedule shall ... the stability of project quality and ensure the realization ofAll elements of quality objectives are under control.Construction Process Quality Control Before the start of construction, according ... commencement of construction or manufacture of the particular structure on which he intends to use such admixtures f) Concrete Mix The concrete mix is tested under the supervision of a supervisory consultant...
Ngày tải lên: 16/09/2024, 10:22
... concrete Trang 149 CONSTRUCTION METHOD9.1 Casting schedule: The casting concrete of Slab On Grade will be divided into two zones: - Zone 1 : This zone enclosed by the perimeter ground beams of ... depend on the thickness of the slabs b Construction joints: The construction joints will be located at the same location of controls joints so they will be treated by cutting in the same way of control ... (approximate 8400 m2) In this zone, the slab is 300 mm thk., and finished level is mostly GL +0.00m Most of concrete work of Slab on Grade is in this zone To ensure the quality of concrete work and finishing,...
Ngày tải lên: 20/10/2016, 15:05
Method Statement of RC suspended slab
... DIRECTION OF WORK 10 8 PREPARATION WORKS 12 9 CONSTRUCTION METHOD 13 9.1 Installation scaffolding & support: 13 9.2 Installation of formwork 14 9.3 Installation of steel bars 16 9.4 Concrete ... for carrying out the construction worksfor RC slab of building factory No.1 This method statement will be applied for first floor (level +7.250m).Construction work of this slab will be repeatedly ... directly on columns Secondary beams: supported on main beams 7 FLOW CHART AND DIRECTION OF WORK SMC-Factory No.1/MS-RC 1FL slab Page 11 Trang 12The work sequence of construction the RC 1FL slab is...
Ngày tải lên: 20/10/2016, 15:08
Method Statement of Foundation
... CHART AND DIRECTION OF WORKThe work sequence of construction the RC footings is shown at the following flow chart Excavation foundation Lean concrete Pile head treatment Installation of form work ... INTRODUCTION1.1 PURPOSE The purpose of this Method Statement is to set the policy for construction procedures and qualityaccording to Contract Specifications To outline the work instruction by which ... Compacting the base of foundation and testing, if required - Installation of form work + Completing lean concrete + Setting out and marking the gridlines and dimensions of footings on lean concrete surface.+...
Ngày tải lên: 20/10/2016, 14:48
Method statement of Tiling work
... waterproofed, a special care of protection to waterproof layers shall be taken by Subcontractor Material for installation of level pegs shall be screed mortar - Screed the mortar onto the slab then ... half width of their original dimensions They will also be set so that the center of any fitting such as floor drain, faucet will be right on the intersection of the joints 9 CONSTRUCTION METHOD 9.1 ... ACSC- CONG TY CO PHAN XAY LAP THUONG MAI 2 Ref No: SMC-ACS-MS-01-TLW-001 Trang 2Revision HistoryRevision Date of issue Purpose of issue (approved/ revision) Submitted by ACSC Prepared by Lê Long...
Ngày tải lên: 20/10/2016, 15:17
4. Method Statement of Bored Pile - Vie
... 12Restoring bentonite mud from bored holeProviding bentonite into the bored hole 2 Bored hole Dimension 6x2.3x2.2 1 Pump 4 Water tank Pump Mixer Bom Pump 3 Pump Mixer 4 Dimension 6x2.3x2.2 Dimension 6x2.3x2.2 ... hỏng ống sonic hoặc tắc nghẽn trong ốngsonic.) Tiết diện ống sonic trên cao độ cắt cọc sẽ phải được giữ bằng khung thép tạmthời để giữ khoảng cách giữa các ống sonic không ... dung dịch bentonite sẽ được kiểm tra trong quá trình khoan cọc và các vậtliệu trong bể như cát hoặc bùn sẽ được di dời thích hợp Nước được sử dụng để trộn bentonite là nước...
Ngày tải lên: 08/02/2018, 10:19
2.Method Statement of Bored Pile - Eng
... submitted separately Construction and Measurement of Bored PilesBored Piles – Determination of identify of concrete –Pulsed ultrasonic method Bored Piles – Method of detection of defects by lowstrain ... manual Trang 3Method Statement of Bored Pile Construction1 General This method statement describes the procedure and the quantity control for construction of boredpile d=1.2m The drilling method will ... Organization Chart 0 | P a g e Trang 2Method Statement of Bored Pile ConstructionAppendix 2: Equipment and manpower Appendix 3: Plan of drawing construction method of bored pile Appendix 4: Sequence of...
Ngày tải lên: 08/02/2018, 10:23
Construction method statement of steel stucture
... To appoint officers in charge of labor safety supervision of occupational safety at the site - Construction camp medicine cabinet at PMU of VINACONEX EC Company Application of sanctions for management ... construction" - Scope of application: Applies to all officials and employees of the construction, VINACONEX EC when engaged in the field Guiding people to participate in construction of the ... must be tested at least 3 months 1 times on the phenomenon of touch, cool on the cover, on protection status of the grounding wire Trang 10- In the case of construction during the night: the system...
Ngày tải lên: 28/05/2018, 01:15
Biện pháp thi công thang máng cáp method statement of ladder
... VIỆC This method statement covers works relating to areas having cables supported on cable ladders, cable trays & cable trunkings only Works are carried out basing on construction schedule and ... duyệt. After confirming the layout of the cable ladder, tray & trunking routing, also the location of DBs & control panel use a line marker to mark out the intended routes on the wall ... standard manufacturer’s galvanized structural steel sections & with all standard accessories The pitch of cross bar at 300mm along straight portion Thang đỡ cáp điện phải theo tiêu chuẩn cấu trúc...
Ngày tải lên: 21/03/2021, 15:09
Construction method statement of erection of super t girder
... installation and grouting Construction of Diaphragm and Desk slab Preparation and survey Assembling, installation of gantry crane on site Transportation of Super T girder Erection of Super T girder Disassembling ... Cross-section: 3 1.2.3 Weight of girder: 3 II CONSTRUCTION MATERIAL AND EQUIPMENT 4 2.1 Construction Material: 4 2.2 Construction equipment: 5 III ERECTION WORKS 6 3.1 Erection Procedure Chart of Super-T ... Erection of Super-T girder Table 3: Auxilary materials to be used for Erection of Super-T girder Trang 62.2 Construction equipment: Main construction equipments to be used for erection of Super-T...
Ngày tải lên: 04/09/2021, 02:25
VA2 OM MS ME ES 001 method statement of electrical system rev 0
... Regulations 1 National technical regulation on fire safety for houses and buildings 2 National technical regulation on energy efficient construction works 3 National technical regulation on electrical ... installation: • Check quality of installed Cable ladder and tray on site • Check position, leveling, rating and condition of Cable ladder and tray • Check correct components of Cable ladder,tray and connection ... connection Electrical conduit installation- Describe electrical works relate with installating of electrical conduits for protection of power cabling Works are execute base on construction schedule...
Ngày tải lên: 15/05/2022, 15:01
VA2 OM MS ME WS 004 method statement of water system rev 0
... intersections, position of valve connecting fittings - Check and review the installation of pipes and fittings - Conduct the acceptance and installation of the system Picture 5.1-7 : Installation of ... construction to return the wall surface, the contractor conducts aligning throats of the equipment according to specifications of equipment with ruler and leveling 5.1.2 Construction method of ... intersections, position of valve connecting fittings - Check and review the installation of pipes and fittings - Conduct the acceptance and installation of the system Picture 5.1-7 : Installation of...
Ngày tải lên: 15/05/2022, 15:04
VA2 OM MS ME EL 002 method statement of extra low voltage system rev 0
... trunking and connection ELV PVC conduit installation- Describe construction works relate with installating of ELV conduits for protection of ELV cabling Works are execute base on construction schedule ... arise on the construction site.In the absence of the site manager, fulfill all assigned tasks and responsibilities to effectively oversee construction site operations on their behalf. Department of ... Regulations 1 QCVN 32:2011/BTTTT National technical regulation on lightning protection for telecommunication stations and outside cable network 2 QCVN 09:2016/BTTTT National technical regulation on...
Ngày tải lên: 15/05/2022, 15:05
Method statement of jet grouting Biện pháp thi công bơm phụt vữa
... BUILDING OF HOTEL, SHOPPING MALLS AND OFFICES FOR RENT" Purpose of this method is to create soilcement piles with a diameter of 1000mm to surround the outside of defect positions of the diaphragm ... trên máy bơm cao áp On the construction site, cement mixture must be continuously mixed by mixer throughout the grouting process Cement mixture consumption is calculated based on the grout flow ... GROUTINGMETHOD STATEMENT OF JET GROUTING Trang 2MỤC LỤC / CONTENT1 GIỚI THIỆU CHUNG / INTRODUCTION 3 1.1 Tổng quan / General 3 1.2 Mục tiêu công việc / Works 4 1.3 Phạm vi công việc / Scope of work...
Ngày tải lên: 12/07/2022, 10:22
Thuyết minh biện pháp bê tông khối lớn dự án METHOD STATEMENT OF MASS FOUNDATION
... khác Basic of the established methods statement Construction method statements are established according to the below: - Drawings of construction technique design - Specification of Landmark81 ... Specification of Landmark81 project - Base on actual construction conditions, site of construction and schedule - Base on the capacity of the Contractor - Other regulations 1.2.Căn cứ pháp lý và căn cứ ... BS EN 206-1:2000 Concrete components are designed on the basis of the supplier’s material and selected base on requirements of the concrete mix and by the technical conditions and BS EN 206-1:2000...
Ngày tải lên: 15/04/2024, 17:04
Tài liệu DESIGN AND DETAILING OF FLAT SLAB ESE SOEDARSONO HS 27 FEBRUARY 2002 pptx
... optimum design in conventional of beam and slab systems Design Considerations Design Considerations DEFLECTION CHECK • necessary to include checking of the slab deflection for all load cases ... CONTENT • • • • • • Introduction Benefits Design Considerations Design Methodology Analysis of Flat Slab Detailing INTRODUCTION What is a flat slab? • a reinforced concrete slab supported ... the slab to enhance shear capacity at the edges of walls and columns Design Considerations Design Considerations PUNCHING SHEAR Shear Studs Design Considerations Design Considerations CONSTRUCTION...
Ngày tải lên: 12/12/2013, 14:15
Part 4: Code of practice for design of composite slabs with profiled steel sheeting ppt
... Department of the Environment (Construction Directorate) Department of Transport Federation of Civil Engineering Contractors Institution of Civil Engineers Institution of Structural Engineers National ... Association of Consulting Engineers British Cement Association British Constructional Steelwork Association Ltd British Masonry Society Building Employers Confederation Department of the Environment ... Arrangement of construction loads © BSI 12-1998 Section BS 5950-4:1994 2.2.3 Construction loads 2.2.3.1 Basic construction loads Construction loads should be considered in addition to the weight of the...
Ngày tải lên: 08/07/2014, 22:20
Homotopy theory of suspended lie groups and decomposition of loop spaces
... groups of the spheres, which seem to be the most fundamental one And the question of computing πn+k (S n ) turns to be one of the central question in algebraic topology Let X be a n-connect topology ... Hence the homotopy of ΣSO(3) might be interesting to study And a decomposition of ΩΣSO(3) can be given by Hopf construction In section 3, we study the homotopy decomposition of Σ(SO(3) ∧ SO(3)), ... restriction of f on the second factor: f |(∗∨∗)∨S : S → P (2) ∨ S is homotopic to the attaching map of the 5-cell of ΣRP ∧ RP By computing the mod Serre spectral sequence of the fibration F → P...
Ngày tải lên: 09/09/2015, 18:49
Effects of the composition of suspended particles in water on the photosynthetically usable radiation and remote sensing reflectance
... SUMMARY OF STATISTICAL ANALYSES OF SOCKET REACTIONS CORONAL MOMENTS DUE TO CORONAL PLANE ANGULATIONS - SUBJECT 166 TABLE 5-35: SUMMARY OF STATISTICAL ANALYSES OF SOCKET REACTIONS CORONAL ... ON CORONAL PLANE SOCKET REACTIONS 158 5.1.1 5.4.1 Review of hypothesis 158 5.4.2 Results of socket reactions ML shear force (Fy) 158 5.4.3 Results of socket reactions coronal ... MEASUREMENT OF SOCKET REACTIONS OF A TRANSFEMORAL AMPUTEE 18 FIGURE 2-7: SUPERPOSITIONING OF EACH SOCKET REACTION COMPONENT OVER 62 GAIT CYCLES DURING LEVEL WALKING IN A STRAIGHT LINE FOR ONLY ONE...
Ngày tải lên: 05/10/2015, 19:01
Effect of suspended sediment on turbulent velocity profiles in open channel flows
... Sediment concentration effect on the von Karman constant in main flow region 50 Figure 4.6 Sediment concentration effect on the integration constant 52 Figure 4.7 Sediment concentration effect on the ... equations for these regions and tests these two concentration profile equations Chapter Conclusions the thesis concludes with the contributions of proposed logarithmic matching equations and ... integration constant a a reference of flow depth B another integration constant C1, C2 integration constants in logarithmic law C mass concentration (g/l) C average sediment concentration Ca a...
Ngày tải lên: 05/10/2015, 19:04
Bạn có muốn tìm thêm với từ khóa: