1. Trang chủ
  2. » Kinh Tế - Quản Lý

Lecture Project management in practice - Chapter 14: Project risk management

22 57 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 22
Dung lượng 901,95 KB

Các công cụ chuyển đổi và chỉnh sửa cho tài liệu này

Nội dung

Lecture Project management in practice - Chapter 14: Project risk management, this chapter presents the following content: Risk event graph, risk management process, contingency funds and risk, risk monitoring and review,...

Trang 1

CHAPTER 14

Project Risk Management

Trang 2

Risk Event Graph

Trang 3

Risk Management Process

Trang 4

Risk Management

Process (cont.)

• Step 1: Establishing the risk context

• Step 2: Risk identification

• Step 3: Risk analysis

• Step 4: Risk evaluation

• Step 5: Risk treatment

Trang 5

Step 1: Establishing the

• Do you use the ‘As Low As

Reasonably Possible’ (ALARP)

approach?

Trang 6

Step 2: Risk Identification

Trang 7

Step 2: Risk Identification (cont.)

The Risk Breakdown Structure (RBS) 

Trang 8

Step3: Risk Analysis

• Probability refers to the

probability of the event (This is

otherwise known as the likelihood

of the risk occurring.)

• Impact refers to the impact of the event (This is otherwise known

as the consequence of the risk if the event occurs.)

Trang 9

Step 3: Risk Analysis

Simple ‘inherent’ risk analysis

Trang 10

Step 3: Risk Analysis (cont.)

I mpact considered over multiple criteria

Trang 11

Step 3: Risk Analysis (cont.)

Decision tree analysis

Trang 12

Step 4: Risk Evaluation

• The purpose of risk evaluation is to assist

in making decisions, based on the

outcomes of the risk analysis, about which risks need treatment and the priority for treatment implementation.

• Risk evaluation involves comparing the

level of risk found during the analysis

process with risk criteria established when the context was considered

• Based on this comparison, the need for

Trang 13

Step 5: Risk Treatment

for Threat Risks

Trang 14

Step 5: Risk Treatment (cont.)

Mitigation and residual risk assessment

Trang 15

Step 5: Risk Treatment

for Opportunity Risks

• Exploit

• Share

• Enhance

• Accept

Trang 16

Step 6: Contingency

Planning

A

contingency plan is an

alternative plan that will be used

if a possible foreseen risk event

becomes a reality (an issue)

Trang 17

Step 6: Contingency

Planning (cont.)

Risk contingency plan

Trang 19

Contingency Funds and

ow are risk contingencies

managed in your organisations?

Trang 20

Risk Management Plan

• Risk context

• Risk methodology

• Risk roles and responsibilities

• Risk escalation process

• Risk reporting

• Risk audits and health checks

• Lessons learned

Trang 21

Risk Monitoring and Review

Trang 22

risk breakdown structure (RBS) risk context

risk evaluation risk identification Risk Management Plan risk monitoring and review risk profile

Risk Register risk severity matrix

Ngày đăng: 08/02/2020, 21:43

TỪ KHÓA LIÊN QUAN

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN