Lecture Project management in practice - Chapter 8: Project cost management. This chapter presents the following content: From work package to budget, a project perspective of cost management, cost management plan, simple time-phased budgeting,...
Trang 1CHAPTER 8
Project Cost Management
Trang 2From Work Package to Budget
Trang 3C ore elements of project cost management
Trang 4A Project Perspective of Cost Management
• Large Capital Items
– The project manager should specifically identify any large capital items that will
have to be purchased by the project
• Long Lead-Time Items
– Items (products/services) that have a long lead-time must be identified early in the
project life cycle
Trang 5Cost Management Plan
Consider…
• Governance, policy
and procedure
• Contingency
• Estimating
• Lessons learned
• Funding sources
• Systems
And…
• Large Capital Items
• Long Lead-Time Items
• CoQ
Trang 6Simple time-phased budgeting
W hen estimating identified costs associated with
the Work Packages, don’t forget:
• Other costs not included in the tasks and/or
work packages Examples of these would
include the cost of the project manager,
office space, telephone costs, ICT
equipment and employment overheads
• The project’s cash in-flows (income)
Trang 7Simple Time-phased Budgeting (cont.)
Simple
project
budget
structure,
by category
Trang 8Simple Time-phased Budgeting
(cont.)
Simple
project
budget
structure,
by WBS
items
Trang 9More Complex Time-phased
Project Budgets
Direct labour budget roll-up ($000)
Trang 10More Complex Time-phased
Project Budgets (cont.)
Two time-phased work packages (labour cost only)
Trang 11Patient Entry Project
Patient entry project: Time-phased work packages assigned
Trang 12Project Scope Integration
Trang 13Key Terms
• actual (value)
• baseline
• contingency
• cost baseline
• finance/ERP systems
• large capital items
• long lead-time items
• make or buy analysis
• planned (value)
• time-phased budget
• variance