Lecture Project management in practice - Chapter 9: Progress and performance measurements. This chapter presents the following content: Structure of a project-monitoring system, what data is collected, the collection and analysis of this data, reporting of the data,...
Trang 1CHAPTER 9
Progress and Performance Measurements
Trang 2Structure of a
Project-monitoring System
Creating a project monitoring system involves determining:
• What data is collected
• The collection and analysis of this data
• The reporting of the data and types of
reports
Trang 3Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd
Pearson, Larson, Gray, Project Management in Practice, 1e
What Data is Collected
•C urrent status of project (schedule and cost)
•R emaining cost to compete project
•D ate that project will be complete
•P otential problems to be addressed now
•O ut-of-control activities requiring intervention
•C ost and/or schedule overruns
•F
Trang 4The Collection and Analysis
of this Data
• Who will collect the project data?
• How will the data be collected?
• When will the data be collected?
• Who will compile and analyse the data?
Trang 5Reporting of the Data
• Who will receive the reports?
• How will the reports be transmitted?
• When will the reports be distributed?
Types of reports
• Full
• Exception
Trang 6Controlling Project Costs, Resources and Schedules
Step 1: Setting a baseline plan
Step 2: Measuring progress and
performance
Step 3: Comparing plan against actual Step 4: Taking action
Trang 7Step 1: Setting a Baseline Plan
• The baseline plan provides the anchor
point for measuring performance
• The baseline is derived from the cost and duration information found in the Work
Breakdown Structure (WBS) and
time-sequence data from the network and
resource scheduling decisions.
• The first baseline plan is usually the
approved PMP prior to project Execution.
Trang 8Step 2: Measuring Progress
and Performance
• Time and budgets are quantitative
measures of performance that readily fit into the integrated information system.
• Additionally, think about qualitative
measures and stakeholder satisfaction.
Trang 9Step 3: Comparing Plan
Against Actual
• Because plans seldom materialise as
expected, it becomes imperative to
measure deviations from the plan to
determine if action is necessary.
• Being able to compare planned values
(PV) against actual values (AC) is key.
Trang 10Step 4: Taking Action
• If deviations from plans are significant,
corrective action will be needed to bring the project back in line with the original or
revised plan.
• Leverage the change/variation process to control change in the project environment.
Trang 11Monitoring Time (Schedule)
Performance
Tracking Gantt Chart
Trang 12Monitoring Time (Schedule)
Performance (cont.)
Project Schedule Control Chart
Trang 13Per cent Complete Rule
Per cent Complete Rules used to
assess actual status
• Actual % complete.
• 0/100 % complete rule.
• Interval % complete.
• 50/50 rule.
Trang 14Developing an Earned Value Cost/Schedule System (cont.)
1 Define the work using a WBS
a Scope
b Work packages
c Deliverables
d Resources
e Budgets
2 Develop work and resource
schedules
a Schedule resources
3 Develop a time-phased
budget using work packages included in an activity
Accumulate budgets (PV)
4 At the work package level,
collect the actual costs for the work performed (AC) Multiply percent complete times original budget (EV)
5 Compute the schedule
Trang 15Developing an Earned Value
Cost/Schedule System (cont.)
Review Sir Ganttalot Media Clips
• http://www.youtube.com/watch?v=UggTFk2EiUg
• http://www.youtube.com/watch?v=jJi1FxC2e64
• http://www.youtube.com/watch?v=-MJEYc48Cjs
Trang 16Developing an Earned Value
Cost/Schedule System ( cont.)
Comparing Earned Value
• With the expected schedule value
• With the actual costs
Assessing Status of a Project
Required data elements
• Data budgeted cost of the work scheduled (PV)
• Budgeted cost of the work completed (EV)
• Actual cost of the work completed (AC)
Calculate Schedule and Cost Variances
Trang 17Other Control Issues
• Scope creep
– Remember its one of the key reasons for project failure
• Baseline changes
– Keeping track of Scope plus agreed
changes to baseline in order to make an accurate report on final project
performance and deliverables.
Trang 18Further Project Performance
Considerations
Not just constrained to scope, time, cost and
earned value consider:
• Quality
• Safety
• Environment
• Human dimension
• Customer
Trang 19Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd
Pearson, Larson, Gray, Project Management in Practice, 1e
Key Terms
•c
ontrol chart
•C
ost Performance Index (CPI)
•C
ost Variance (CV)
•E
arned Value (EV)
•e
stimated cost at completion—forecasted (EACf)
•e
stimated cost at completion—revised estimates (EACre)
•e
xception report
•f
ull reporting
•m
ilestones
•P
er cent Complete Index—actual costs (PCIC)
•P
er cent Complete Index—budget costs (PCIB)
•p
lanned value (PV)
•q
uality
•S
chedule Performance Index (SPI)
•S
chedule Variance (SV)
•s
cope creep
•T
o Complete Performance Index (TCPI)
•t