목 차 Quality Management Manual EVS QMS Prepared date 01 03 2002 Revision code 24 Revised date 12 03 2018 Page 428 QUALITY MANAGEMENT MANUAL (IATF 16949 2016) Chapter 1 Index Chapter Clause Heading Page Note Cover 1 1 Index 2 1 1 Revision history 3 1 2 Check approval 4 1 3 Quality policy 5 2 Overview 6 2 1 Purpose 2 2 Applicability 2 3 Operate quality management manual 3 Introduce company and organization mechanism 7 8 3 1 Introduce company 3 2 QMS organization mechanism 4 Organization contex.
Trang 22 Overview 6
2.1 Purpose2.2 Applicability2.3 Operate quality management manual
3 Introduce company and organization
3.1 Introduce company3.2 QMS organization mechanism
4 Organization context & interested
4.1 Understanding organization and
organization context4.2 Interested parites
Trang 312 05.01.201
2
1; 3 1.2; 3.2 Change checker & approver Change new
organization mechanism
15 05.01.201
3
All All Cancel process of producing
Voice Coil, Complement 2 instructions for managing resources (4.1.2 & 4.1.3)
Inspect the effect
18 22.03.201
6
All All Change checker & approver Change new
organization mechanism
19 05.01.201
7
All All Change checker & approver Change new
organization mechanism
20 24.04.201
7
All All Change checker & approver Change new
organization mechanism
21 01.11.201
7
4 4.1,4.2 Revise name of chapter 4
chapter 5 Add organization context and interested parties atchapter 4
Transition from ISO/TS 16949 IATF 16949
8
3 3.2 Change checker & approver Change new
organization mechanism
Note: 1 Only record important changed content
2 If revision history over 1 page, delete the last page
Trang 41.2) Inspect & approve
Classify Dept/ position Full name Signature
Approved Director Roh Gwang Seuk
Control Jon Jin Yoo
Checked Sourcing Kim Yoon Keun
Prepared QA Nguyen Ngoc Le
Trang 5by continual improvement and quality has the best priority task
in the management, ESTec VINA Co., Ltd set up quality policy asbelow:
We all the staffs of ESTec VINA Co., Ltd are fully aware of quality policy and
will make every efforts to achieve our quality objective by applying the basicassumption that,
“Let’s make the best global quality & best ESTec” to all departments
QUALITY POLICY
Ensuring initial quality
Observing principle and basic
Observing principle and basic
Open mind and positive participation
Open mind and positive participation
Management criteria
Purpose
Complete Defect Ratio Improving Processing Defect in
Company Customer Process Defect Improving Customer’s Incoming
Quality
Unit
PPM PPM
Quality
objective
Customer Delight through Quality
Slogan: Let’s Make the Best Global Quality & Best ESTec.
Trang 6of IATF 16949
and operate quality system at ESTec VINA effectively and validly
2.2 Applicability
QMS being applied according to requirements:
1 Produce Dome speaker and household system speaker
(Certification scope: ISO 9001)
2 Produce Dome speaker and automotive system speaker
(Certification scope: IATF 16949)
Standard Applicability Customer’s
requirements
Location
ISO 9001 Produce all
types ofspeaker
VSIP
IATF 16949 Produce
speakers usefor car
(Exclusionclause 8.3 ofproduct
design)
Hyundai Kia VSIP
2.3 Operate quality management manual
2.3.1 Approval
Top manager is highly responsible for approving this quality management manual 2.3.2 Operation
1) To reach target of this manual, opreartion methods and verify operation result
effectively reflected and cited on chapters of this quality management manual
2) Clarify responsibilities, authorities and correlation relation ship of all staffs in operation
structure of QMS, implement complying roles following principles in qualitymanagement manual
3) Quality planning team in charge of controlling the arising, distribution and revocation ofquality assurance manual
2.3.3 Relevant standard
■ ISO 9000: QMS – Basis and vocabulary
Trang 7■ IATF 16949: QMS– requirements
Chapter 3: Introduce company and organization mechanism
3.1 Introduce company
Name: ESTec Vietnam Co., Ltd
Address: No 6, Street 6, Vietnam-Singapore Industrial Park, Thuan An district, BinhDuong province, Viet Nam Tel: (+84) 274 378 2840
TV & Monitor Speaker
Area : Zone 34,000㎡, buildings 40,470㎡
Trang 83.2 QMS organization mechanism
Chapter 4: Organization context & interested parites
Trang 94.1 Understanding organization and organization context
4.1.1 Market opportunity
1) Customer: automotive industrial market more and more developes in domestic andwestern countries
There is tendency of increased quantity
2) Supplier: key stable materials, there is ability to provide goods timely in quatity,quantity and delivery
time
3) Law: there is tendency of strict requirements of hazardous substance management(product
environment)
4.1.2 Challenge and external threat
1) Company with the same field day by day increases
2) Price is strongly competitive
3) Customer requests to discount more and more day by day while supplier requests toincrease price of
materials because material resource depends on oil & petrol situation in the countryand the world
4) Customer requirements are higer and higer Required quality side is higer
5) Manpower recruitment is hard
4.1.3 Strength
1) ESTec speaker trademark is present in most of the world market
2) Quality is always assured to satify customer needs
3) Delivery on time as requested by customers
4) Modern and sufficient machinery and facility
5) Modern production technical technology meets capacity as required
6) Airy and comfortable working environment, security policy is suitable with empoyees 7) Meeting fully environmental law rewuirements and other statutory requirements 8) Experienced, enthusiastic, creative staffs sticking to the company
9) Leader team has has vision and strategy
4.1.4 Weakness
1) Technical level and material understanding has still not reached corporation level 2) Qualification of employees is not the same
Trang 10Sales/ Productioncontrol/ IM-EX /Warehouse
To meet full obligations of complying withlaw requirements of Vietnam HR / XNKDepartment of
Natural Resources
and Environment
To meet fully law, decrees, circulars andregulations of environment related to thecompany
QA / HR
Department of
Industry and Trade
To meet requirements of regulated
QA
Supplier Long coopration with the company Purchasing
Labourer
To meet social welfare and health benefits
Trang 11Chapter 5: Quality management system
5.1 General
5.1.1 Identify the necessary processes of QMS and apply them for the entire organization
1) Determine the needed processes of QMS and apply to whole oganization
2) Determine sequence and interaction of defined processes
3) Determine standards and audit method to ensure the operation and control these
processes effectively
4) Ensure the availability of needed resources & informations to support the operation
and control processes
5) Monitoring, measuring and analyse processes
6) Implement necessary operation to reach intended result and continual improvement
these processes
Company issue document, control and apply processes according to 8 principles ofquality management and requirements of IATF 16949:2016
㎡ 7 Principles of quality amnagement ㎡
1) Customer focused organization
2) Leadership
3) Involvement of people
4) Process approach
5) Continual Improvement
6) Factual approach to decision making
7) Mutual beneficial supplier relationships
Trang 125.1.2 Model of QMS at ESTec VINA
Improvement
Correvtive & preventive
action Continual Improvement
process Resources
Instruction for reward
Instruction for determining
rights & duties
Instruction for Overtime
management
Enterprise sercurity
Manufacture product
Equipment management process
Tool, JIG management process
Device, measuring equipment management instruction
Measurement system analysis instruction Test/ calibration room operation instruction
QC Control Plan control instruction
WI control instruction Instruction for import/
export, customs procedure Finished products stock management instruction Customer service management process FMEA control instruction S.T calculation instruction
Measure, analysis, improvement Customer satisfaction survey process Internal audit process Parts inspection process
F goods management process
Non-conformity product management process Data analysis process Test professionals instruction Defect parts treating instruction
Q-Cost measuring instruction
㎡㎡㎡㎡㎡㎡㎡㎡㎡㎡
㎡㎡㎡㎡㎡㎡㎡㎡㎡
Management responsibility
Business management process
Management review process
Requir
ement
s
Cust omer s satisf y
Product
Business management process Design & development process Vibration parts development process
Parts approval process Products approval process Spec change management process
Production management process Purchasing management process Material management process Design Review operation instruction
Self-supported mould management instruction Wood lamination process management instruction Injection process management istruction
Damper process management instruction
Trang 135.1.3 Sequence & correlation of processes in QMS at
STec VINA
Quality management manual Document management process
QMS
Value increase activity
Informationflow
Record management process Tool drawing management instruction
Trang 14( Production plan, shipping, storage)
COP5 Production Process (Production, Work instruction, Inspection, Equipment management)
Customer service management process
(Handle customer complaint)
- SP: Customer satisfaction survey process
COP2 Design & development
process
(Planning,design product/process,review, , verification, validation)
- SPJ: Finished goods stock management intruction
- SP : Parts management process
PPAP
Customer
requirement
- SP: Parts approval process
- SP: Finished products approval process
- SP: Spec change process -SP: Vibration parts development process
Training/ qualifying procedure,
Instruction for operating, Production Equipment/ Measuring device control
COP4 Purchasing management
process (Develop parts, PO, manage
-SP:Correctivi & preventive action procedure
- SPJ: QC Control Plan control
- SPJ: Working instruction control
- SPJ: 3D 5S control
- SPJ: Treat defect parts at production line
- SPJ:Wood processing process management
- SPJ:Injection process management
- SPJ: Damper process management
- SPJ: Cone paper/ Body process management
Product
Trang 155.1.4 Interaction between input and output of procedures.
5.1.5 Organization and documental system of QMS.
COP 4
Purchasing management pocedure
COP 5Process management procedure
COP 6Customer service
management pro
Customer
Customer
Out Put Finished goods packing Finished goods delivery
In Put
Customer
requirement
In Put Customer claims
Out Put
Resolve customer
claim
Out Put Outgoing production parts
Out Put Production plan
Out Put Work instruction
Out Put Consuming order information
Out Put Parts development information
Out Put Resolve customer requirement Order review result
Check finished goods
Checking parts
Out Put Check request
Out Put Check result
Out Put Check result
In Put Passed product
Out Put PPAP
In Put Customer requirement
Trang 165.1.5.1 Quality manual (Level 1)
Depend on IATF 16949:2016, relavant legal regulations, 8 priciples quality managementand quality policy, sequence and interactive effect of principle, regulations of organizationand procedure of entire QMS including the following terms according to nature of technicaldocuments
Indicate clearly scope of QMS including the adequacy and detail content of applicable part
To manage quality system, all set documents have to include regulation or citeregulation
QMS’s procedures always have mutual interaction
5.1.5.2 Company’s standards (Level 2)
Implement standards of QMS, besides proceduresï, instruction, relavant support document,authorities & responsibilities also being devided into quality standard, common standard,environment standard
5.1.5.3 Work instruction (Level 3)
Include management plans, inspection standards, working standard, specification, national/international specification… documents designating in detail on implementation method ofeach business unit
5.1.5.4 Format (Level 4)
Format types or sheet/ check sheet
Quality management manual
Company’s standard (regulation)
(Procedure / Instruction / regulation/ Standard)
Trang 175.2 Processes turtle-shell chart
5.2.1 Business planning (MP)
5.2.2 Management review (MP)
Trang 185.2.3 Training (SP)
5.2.4 Business management (COP 1)
Trang 195.2.5 Design & development (COP 2)
5.2.6 Purchasing management (COP 4)
Trang 205.2.7 Process management procedure (COP 5)
5.2.8 Customer service process (COP 6)
Trang 215.2.9 Production management (COP 3)
5.2.10 Equipment maintenance (COP 5)
Trang 225.2.11 Tool, device management (COP 5)
5.2.12 Product approval (COP 2)
Trang 235.2.13 Measured tool management (COP 5)
Trang 245.2.15 Input inspection (COP 4)
Trang 255.2.16 Finished products inspection (COP 5)
5.2.17 Corrective & preventive action management (SP)
Trang 265.2.19 Data analysis (MP)
Trang 275.2.20 Continuous improvement (MP)
5.2.21 Internal audit (MP)
Trang 285.2.23 Document management (MP)
5.2.24 Standard management (COP 2)
Trang 295.2.25 Customer satisfaction (COP 1)
5.2.26 Vibration parts development (COP 2)