MP MuLTIDIRECTIONAL SCAFFOLDING The MP multidirectional system is the modern solution that reflects in an industrialized way all the flexibility of tube and joint scaffolding.. The MP mu
Trang 3MP MuLTIDIRECTIONAL SCAFFOLDING
The MP multidirectional system is the modern solution that reflects in an industrialized way all the
flexibility of tube and joint scaffolding
The special washer welded to the vertical uprights has 4-ways for the orthogonal fastening of stringers and
diagonals and other 4-ways slotted that allow the fastening with changeable angle to cover almost 360°
In addition to its extreme flexibility, the type of hooking with a wedge and washer is very fast and
shortens considerably the assembly and disassembly operations
The MP multidirectional scaffolding is the Pilosio’s system with most flexibility and highest
possibilities of use even in complex situations thanks to the characteristics of quick assembly, great
modularity, extreme adaptability and high load capacity
StrengtHS
• the MP modular system consists of simple modular components
• full range of accessories to meet any needs on site
• simple, fast and intuitive, the assembly and disassembly operations are very quick
• it can be combined with other models of prefabricated scaffolding in case of curved structures and
with no linear shapes
• the MP structures are used to replace any other system of shoring, towers and contrast systems
• the MP multidirectional scaffolding is the perfect combination between the productivity of the
frame scaffolding and universal flexibility of the tube and joint system
• a temporary aluminium guardrail is available for the safe assembly of scaffolding without having to
use uncomfortable personal protection equipment against falls
Trang 4The technological nature of the MP multidirectional scaffolding allows lining an architectural structure
The boards have been used in vertical position to create a volume temporarily enclosed Pilosio has designed special parts for this particular project.
Trang 5SPaCingSThe spacing of 83 cm with steps up to 300 cm for maintenance with maximum capacity of 150 kg/m2 on the most loaded surface.
Spacing of 115 cm with spacing up to 250 cm for construction with maximum capacity of 300 kg/m2 on the most loaded floor
CHaraCteriStiCSSteel pipes with ø of 48.3 mm
Hot galvanization finishing
Trang 7Many fieldS of aPPliCation
It is used in residential, industrial, restoration, marine, aviation, oil,
entertainment, archaeological sites, bridges, and in the viaduct sectors as well
as in hanged or movable structures
PoSSible uSeS
• scaffolding for maintenance and construction of façades
• scaffoldings with driveways and pier stops
• unloading scaffoldings
• service stairs for job sites
• structures with high capacity for works at a height
• towers with very high capacity to support heavy loads at a height
• hanged structures when there is no possibility to start from the bottom
• contrast systems
• movable towers on wheels or carts
• boarding
• structures for entertainment and audio-video towers
• structures for warehousing and storage
• bearing structures of any kind to be lined with another material
• stage designing
With the MP multidirectional scaffolding it is possible to create also mobile towers with swiveling wheels for special maintenance and restoration.
Even in particular cases such as, for example, maintenance of the lateral and lower parts of bridges and viaducts, when it is not possible to build the scaffolding from the bottom for the presence
of water or for a too high altitude, a sliding tower is used to lower down the MP multidirectional scaffolding with related work floors
to reach the sections where to operate.
Trang 9MP MultidireCtional SCaffolding for tHe naVal induStry
The high flexibility of MP multidirectional scaffolding allows
numerous advantages for the naval industry, both for construction
and for maintenance
The scaffolding can be equipped with swiveling wheels
The use of brackets allows working safely close to the hull of the ship
and without the need for invasive fastenings
Trang 10MP multidirectional scaffolding 83/115 – 250 cm.
Trang 11830/1150 830/1150 434
Trang 12MP MultidireCtional SCaffolding diagraMS
• tower of support (Fig 1)
• unloading scaffoldings (Fig 2)
• service stairs for job sites (Fig 3)
• structure for slab support (Fig 4)
• circular scaffolding (Fig 5)
• MP structure with temporary aluminium covering (Fig 6)
Trang 13Fig 4
Trang 15MP LOADING AREA
Specific unloading scaffoldings with floors staggered, carried out by using MP multidirectional
system are used to supply the various floors of a building with construction and finishing
materials and various equipment
They are structured so that the load lifted by a crane is placed on the unloading area at the
level of the desired floor and then moved inward the building It is essential to ensure that the
displacement of areas is performed so that the crane can place the load without obstacle
The majority of areas have a size of 2.50x2.50 m with an operating load up to 5 kN/m2
For special needs, unloading scaffoldings can be carried out with a different number of areas,
measures and capacities
Trang 18Backstairs 250x150 cm.
Trang 19MP SERvICE STAIRS
To secure easily and safely climbing at a height, instead of using a trapdoor with rung ladders available only to workers, the comfortable external service stairs manufactured with MP scaffolding with aluminium climbing stairs are used
The advantage is to make accessible the high altitude climbing at a height or accessing excavations both for transportation of material and small equipment and for site inspections
by personnel not involved in the work These stairs can be directly anchored from the scaffolding to the building, but they are an independent element
The standard sizes are 250x250 cm, top view, with modular height of 200 cm that perfectly combines with the landing of all existing scaffolding models on the market both multidirectional and with prefabricated frames
Trang 20Fig 2 Fig 1
Trang 21A simpler solution is to build a climbing stair leaning
against the façade scaffolding that uses the scaffolding
floor as a landing (Fig 1)
A service stair sized 300x550 cm and spacing of
200 cm and landings of 150x150 cm is the perfect
solution to access the site by personnel with bulky
equipment and and safety personnel for passage of
a possible stretcher (Fig 2)
With the MP system it is possible to build also stairs
open to the public for the civil sector (entertainment,
sporting events, various events) that comply with the
safety standards of the sector (Fig 3)
Trang 22GALvANIZED ADjuSTABLE BASE PLATE
Trang 23SwIvEL BASE jACK
FOR FORK
Trang 26475005 1050 10.8
N° 2 screw nut M14 UNI 5588 galvanized N° 2 washer 15x28 UNI 6592 galvanized N° 2 washer UNI 8842-A14 (jagged)
SAFETy hOOK
MP CLAMP wITh END COuPLER
Trang 27(toe-board top element for stairway)
LEDGER BETwEEN LANDING AND uPPER STEPBOARDS (wORKING SITE)
LEDGER BETwEEN LANDING
AND LOwER STEPBOARDS (PuBBLIC)
Trang 2848 boards of 330
TuBuLAR CONTAINER
A
B
Trang 29CONTAINER
GABION
Trang 30built build to
Pilosio SpA Via E Fermi, 45 - 33010 Feletto Umberto - Tavagnacco (UD) - Italy