1. Trang chủ
  2. » Kỹ Thuật - Công Nghệ

Thuyết minh tiếng anh xây dựng 2 unit7 documentation

60 254 7

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 60
Dung lượng 14,58 MB

Các công cụ chuyển đổi và chỉnh sửa cho tài liệu này

Nội dung

Speaking 1 Suggested answers building plans, building permits, architect’s drawingsplans, floor plans, project plans, structuralelectrical drawings, specifications, manualspec books (manuals that cover materials and methods), change orders, letters, memos, etc. Listening 2 correspondence, job site memos, change orders, reports, drawings, RFI logs, procedures, archives, confidential documents

Trang 1

UNIT 7:

DOCUMENTATION

Explain document control procedures

Talk about amendments

Give specific information about documents

Discuss project documentation

Trang 2

DOCUMENT CONTROL

Người quản hoặc cơ quan quản lý hồ sơ Phòng lưu trữ

Yêu cầu thông tin

Yêu cầu thông tin Đăng nhập

Thủ tục thay đổi thứ tự

Trang web ghi nhớ công việc

Trạng thái

Trang 3

Hoàn thành Cải thiện, sữa chữa

Quét (lấy mẫu)

Trang 4

Speaking 1: Work in pair Brainstorm type of document used in the construction industry

Trang 5

Speaking 1

Suggested answers

building plans, building permits, architect’s drawings/plans, floor plans, project plans, structural/electrical drawings, specifications, manual/spec books (manuals that cover materials and methods), change orders, letters, memos, etc.

Trang 6

Listening 2: A manager is showing a new employee around the company

Listen and note down least three documents he

Trang 7

Listening 2

correspondence, job site memos, change orders, reports,

drawings, RFI logs, procedures, archives, confidential documents

Trang 8

Listen 3: Listen again and answer these question

Trang 9

 Listening3

1 A document controller is a person who is

responsible for processing all documents within an

organisation in a timely manner

2 Document control is necessary because companies

deal with hundreds of documents And delays cost money

3 RFI stands for ‘request for information’ It is a

document that asks for information about specific

details in a project An RFI log is a list of the RFIs

4 Because the company still gets a lot of

documentation which is not in electronic format

5 It is a requirement of state law

Trang 10

4) Because a lot of documentation which isn’t electronic format

5) Because that is confidential documents

Trang 11

Reading 4: Look at three documents and decide what types of document they are Choose from the names in the box

Trang 13

5 Complete this document control procedure with the words in the box

number

figures scan

archived amended

log

track

version

books out

Trang 14

 Vocabulary 5

 1 log 2 number 3 scan 4 figures

5 version 6 amended 7 track 8 books out 9 archived

 Listening6

 2 Status 3 Confidentiality level 4 Originator 5 Document history 6 Document output

 Listening 7

 Details: document serial number, document type

 2 Status: draft, final

 3 Confidentiality level: restricted, internal,

 open

 4 Originator: name/department, telephone

 number, email address

 5 Document history: list of Versions, dates,

 people involved

 6 Document output menu: only allow online

 viewing, transfer files, print

Trang 15

Listening 6: listen to a conversation about a document manament system Label the buttons on the

screenshot

Status Confidentiallity level Origination Document

History

Trang 16

7 Listen again What does the user see when he/she clicks each button?

Normally someone’s name or department

Telephone number and email address

Document output menu

Trang 17

8 Match 1 -7 with a – g to make sentences

1c2a3e4b5d6g7f

Trang 18

9 Work in pairs Design a simple log sheet for tracking documents Explan how to use it You have to put the date in this column

Date Start time Finish time Log Note

Trang 19

Schedule of drawings

(n)

The order of the plans for building

Revise (v) To change something because of new information or ideas

Load bearing wall (n) A wall that helps support the weight above it

Blinding concrete (n) A thin layer of concrete that is applied to a surface to smooth over holes

Primer (n) A coating of paint applied to a surface to prepare it for paint or another

coating or adhesive

Fabrication (n) The act of construction or manufacturing

Erection (n) The act of building something or putting it in an upright position

Sanitary sewer (n) In civil engineering, a sewer that is restricted to carrying sewage and does

not allow surface water to enter

Kế hoạch của bản vẽ

Làm lại, sữa lại, xem lại,…

Tường chịu lực

Bê tông lắp khe nứt Van mở nhiên li u ệu Sự gia công

Sự lắp ráp Cống v sinh ệu

Trang 20

Vent (n) A hope or pipe through which gases, liquid, etc can enter or escape from an

enclosed space or container

Drain (n) A pipe that carries water or waste liquids away

Compressed (adj) Pressed together or into less volume or space

Water meter (n) A device used to measure the volume of water that is used

Remote reader (n) A device that is operated at a distance from the water mater, and to which

water meter reading are transmitted

Gas line (n) A pipeline used to transport liquids or gases

Full stop (n) British English a point [.] that marks the end of a sentence or the short form of

a word [ = period American English]

Period (n) American English a point [.] that marks the end of a sentence or the short form

of a word [= full stop British English]

Slash (n) A line [/] used in writing, to separate words, number or letters

Thông hơi Ống thoát nước Bị nén

Đồng hồ nước Điều khiển từ xa Đường dẫn khí đốt Dấu chấm

Dấu chấm

Dấu gạch chéo

Trang 21

Forward slash (n) A line [/] used in writing, to separate words, numbers or letters

Comma (n) The mark [,] used in writing to show a short pause or to separate things in a

list

Colon (n) The sign [:] that is used in writing and printing to introduce an explanation,

example, quotation, etc

Semi – colon (n) The mark [;] used to separate different parts of a sentence or list

Dash (n) A line [-] used in writing to separate two closely related parts of a sentence

Brackets (n) Of the pair of signs put around words to show extra information ()

Chữ số La Mã

Trang 22

3 Concrete mix ratios as follows:

(i) structural concrete 1:1 ½:3

(cement : sand : aggregate)

(ii) blinding concrete 1:3:5

(cement : sand : aggregate)

4 Concrete covers as follow:

(i) substructures 50 mm.

(ii) columns 40 mm.

(iii) beams 35 mm.

5 All structural steel to be painted with two

coats of primer (one after fabrication and one

Trang 23

Reading 1 Look at these extracts and decide what type of document they are from.

C

PLUMBING LEGENDSYSBOL DESCRITION

POINT OF CONNECTION

- - CW - - DOMESTIC COLD WATER, INSULATED

- - HW - - DOMESTIC HOT WATER, INSULATED

- SAN - NEW SANITARY SEWER

- - - v - - - - SANITARY VENT

FLOOR DRAINC.A COMPRESSED AIR

WATER METER WITH REMOTE READER

- G -M R GAS LINE

Trang 24

 Reading 1

 All the extracts are from technical drawings/ architect’s drawings.

1 Thomas is a document controller

Vince is a site manager

2 The call is about some changes to the

drawings that Vince is using on site

Trang 26

Listening 2 Listen to the telephone conversation about the extracts in 1 and answer these questions.

1 What are the speaker’s job?

2 What is the call about?

Answer:

1 The speaker’s job are engineer.

2 The call about is amendments general notes and schedule of drawings.

Trang 28

 Listening 3

 A

 1 Note 2 should read 250 mm, not 200

 2 Note 3 (ii) should read 1:3:6, not 1:3:5

 3 Note 6 should read BS, not GS

 4 The semi-colon at the end should be a full

 1 log 2 number 3 scan 4 figures

5 version 6 amended 7 track 8 books out 9 archived

Trang 29

Vocabulary 4 Circle the word on the right with the correct meaning of the word on the left in the context of the extracts in 1.

1 Schedule A project time plan / a list / to arrange ( a meeting)

2 Legend A story / a table of symbols / a famous person

3 Sheet A piece of plastic used to cover things / a flat piece of metal / a large piece of paper

Answer:

1 Schedule of drawing.

2 General notes.

3 Plumbing legend.

Trang 30

5 Complete this table with the missing nouns or verds.

AbbreviateAlterAmendModify Modification

Revision

Abbreviation Alteration Amendment Revise

Trang 31

full stop/ period ( but note that for numbers we say ‘point 3’ for 3)

/ Slash / forward slash

Note how we say:

(ix) ‘Roman numerals 9, in brackets’, or ‘open brackets, Roman numerals 9, close brackets’

‘KZ’ ‘capital K, capital Z, in inverted commas’, or ‘Open inverted commas, capital K capital Z, close

inverted commas’

AMENDMENTS

Language

Trang 32

Speaking 6 Work in pairs Student A: use the information below Student B: turn to page 69 Student A: dictate this list to your partner

1 Drg No CD/356/001

2 (iv) concrete mix ratios 1:3:6

3 M-2 Unit ‘A’ and ‘B’ A/C plans

4 ISO/IEC 27001:2005

5 For 5/.25 ink system, 7 and 10 mm diameters apply.

Trang 33

7 Test your partner Draw some symbols used in construction drawings Ask your partner what they mean Then write a legend for any new symbols you find useful.

Trang 35

Reading 1 Read this email and identify the piece of information that is missing:

Missing is his address.

Trang 36

Reading 4

Mr Al Najashi has received the information pack and is planning to

send the completed forms in time for the deadline

Reading 5

1 on the website 2 this morning

Trang 37

2 Listen to the telephone conversation about the bid.Identify the illustration that shows the project Mr Al Najashi is bidding for What was the problem ?

The problem was it's about an email which he sent her on the 27th of May, confirming that my company would like to bid for the project and asking for more information

Trang 38

3 In the conversation two types of address are mentioned What are they and what

is the difference between them? Listen again and check your answers

Trang 40

5 Read the two emails again and answer these questions.

Trang 41

Relative clauses

We often use which or that to give

specific information about the thing we

are talking about

It is our intention to bid for the project

which/that was advertised on your website

Thank you for the information pack

which/that arrived this mornina

Is it your company which/that is doing the bridqe refurbishment on the same highway?

We can leave out which if it is followed

by a pronoun It's about an email ( 27 Mav Have you looked at the draft ( which/that ) 1 sent you on which/

that ) 1 wrote this morning?

Trang 42

7.Match 1-7 to a-g to make sentences

1 Here's the letter which you a) on his this.

2.The document that you b) need is with the client

3 We are still looking for the c) wrote this morning? drawings which

4 The letter which I sent you d) revised

Trang 43

8 Read these sentences Use brackets to show where we can leave out which or that

1 The manual which I sent you has not come back

The manual (which) I sent you has not come back

2 He needs to rewrite the letter that he drafted yesterday

He needs to rewrite the letter (that) he drafted yesterday

3 We discussed the specifications which we received last week.

We discussed the specifications (which) we received last week.

4 Where is the change order that was sent this morning?

Where is the change order that was sent this morning?

sentences 1, 2, 3, 5 and 9

Trang 44

5 The email which I sent last week was ignored.

The email (which) I sent last week was ignored.

6 I'm looking for the RFI log that was on the desk

I'm looking for the RFI log that was on the desk.

7 The documents which are kept in the safe are all confidential The documents which are kept in the safe are all confidential.

8 Where's the drawing which contains the details of the retaining wall?

Where's the drawing which contains the details of the retaining wall?

9 Have they sent us the change order which we asked for?

Have they sent us the change order (which) we asked for?

Trang 45

Speaking 9

Work in pairs Take turns to choose a document type from the first box Tell your partner exactly which document you need Use

words from the second box to be more specific Follow the

example conversation below

agenda change order contract drawing email floor plan manual minutes permit presentation

procedure report RFI log schedule

amended archived backed up destroyed

redrafted revised signed wrote

Trang 46

A: I need a copy of the contract

B: Which contract?

A: The contract which we signed last week

B: We signed two contracts last week

A: I need the one which has to do with the residential housing project in Takara Road

B: OK

Trang 47

Focus on a project: Golf

course construction

1 Castle Golf is an American company which designs and build miniature

golf course Read castle Golf's design and build process and underline the document types it mentions.

Reading

Trang 49

Answer

1 literature and emails helpful information.

2 prepare a construction contract

3 photos, postcards, etc.

4 the site , site plans, topography and other required information

5 construction documents

6 retainer/design agreement, the fee

7 design and budget

literature and emails, retainer/design agreement, photos, postcards, site plans, topography and other required information, preliminary plan/initial plan, final design layout, construction contract, construction documents

Trang 50

2 Categorise the types of document from the text.

Design documents: literature and emails, photos, postcards, site plans, topography and other required information, preliminary plan/ initial plan, final design layout Contractual documents: retainer/design agreement, construction contract

Construction documents: construction documents

Trang 51

Answer

DESIGN

DOCUMENTS

CONTRACTUAL DOCUMENTS

CONSTRUCTION DOCUMENTS

•retainer/design agreement, the fee

•design and budget

•construction documents

Trang 52

 3 Work in pairs Imagine you are document controllers Decide which categories in 2 are the most important to control Explain how you would log and track them.

Trang 53

UNIT 7 DOCUMENTATION

REVIEW

Trang 54

1 Find words in the box which are similar in meaning to the

words in bold.

amend bid contract draft electronic minutes private

1 Can you send us the documents in digital format, plesse?

2 We need to lock these drawing away – they’re confidential.

3 Have you had a chance to revise the legend yet?

4 The tender documents need to go in by next Friday.

5 Don’t worry, all the details are in the written agreement.

6 This is the first version of the letter- have you seen the latest one?

7 I would like to see the record of the meeting.

1 electronic 2 private 3 amend 4 bid 5 contract 6 draft 7 minutes

Trang 55

1 electronic 2 private 3 amend 4 bid 5

contract 6 draft 7 minutes

Trang 57

3 Complete these conversattion with have to , has to or had

1 A: What’s the problem with the safe?

B: I’ve lost the combination I’ll call the

locksmith now What a hassle.

2 A: What’s the hurry?

B: I need to find Alima I’ve just heard she apply for the

permits by next Monday.

3 A: Where were you this morning?

B: In Samir’s office We sign the contract.

4 A: Why are the lights on in the office? It’s after seven.

B: The document controllers are working late

They scan in the paperwork which

arrived this afternoon so we can use it tomorrow.

5 A: Do you know where Pedro is?

B: He go to the printer’s to pivk up the drawings

1haveto 2hasto 3hadto 4haveto 5 had to

Trang 58

4 Name the punctuation

Trang 59

4 Name the punctuation

1 full stop/period 2 comma 3 semi-colon 4

brackets 5 (forward) slash 6 dash/ hyphen 7 inverted commas/speech marks 8 Roman

numerals

Ngày đăng: 01/08/2019, 21:56

TỪ KHÓA LIÊN QUAN

w