HANOI - JULY 2012CONTRACTOR: DOOSAN HEAVY INDUSTRIES CONSTRUCTION CO., LTD PROJECT: MONG DUONG II THERMAL POWER PLANT, VIETNAM DRAWING PACKAGE: CIVIL & BUILDING WORK CONSTRUCTION METHOD
Trang 1HANOI - JULY 2012
CONTRACTOR: DOOSAN HEAVY INDUSTRIES CONSTRUCTION CO., LTD PROJECT: MONG DUONG II THERMAL POWER PLANT, VIETNAM
DRAWING
PACKAGE: CIVIL & BUILDING WORK
CONSTRUCTION METHOD
SUB-CONTRACTOR: VINACONEX E&C
Trang 2SITE ADRESS
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT
SHOPDRAWING
METHOD STATEMENT
DESIGN
REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN
FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED
DRAWING BY
VIETNAM
VINACONEX E&C
DRAWING LIST
Trang 3EXECUTION PROCESS OF FOUNDATION
EARTH WORK LEAN CONCRETE REBAR FORMWORK CASTING CONCRETE PROOFING WORK BACK FILL
- WORKING SPACE AS FOLLOWS:
- ALL EXCAVATION WORKS SHALL BE IN ACCORDANCE WITH TCVN4447- 1987
1
2
4
5
6
7
8
DEPTH WORKING SPACE H>2m 50 cm 0m<H<=2m 30 cm
- THICKNESS OF EACH COMPACTED LAYER IS 25cm
3
MAINTENANCE WORK
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT SHOPDRAWING METHOD STATEMENT DESIGN REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
DWG NO:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED DRAWING BY VIETNAM
13/07/2012 0
VINACONEX E&C
EXECUTION PROCESS OF FOUND FOUNDATION WORK
SITE ADRESS
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT SHOPDRAWING METHOD STATEMENT DESIGN REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
DWG NO:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED DRAWING BY VIETNAM
13/07/2012 0 VINACONEX E&C
Trang 4EXCAVATION WORK
0m <H< 2m
1000
m=1:0.5
H> 2m
1000
SITE ADRESS
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT SHOPDRAWING METHOD STATEMENT DESIGN REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED DRAWING BY
VIETNAM
VINACONEX E&C
GENERAL NOTES FOR EXCAVATION EXCAVATION WORK
SITE ADRESS
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT SHOPDRAWING METHOD STATEMENT DESIGN REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED DRAWING BY VIETNAM
VINACONEX E&C
Trang 5FORMWORK DETAIL OF COLUMN
1
4
2
8
7
8 2
3
10
5
A
10
2 1
4
4
1
6
3 7
9
CONCRETE SLAB OR BEAM
THE BOLT IS HIDDEN IN SLAB OR BEAM
AFTER REMOVING FORMWORK AND SUPPORTING
BOLT 12
DETAIL A
CAST STEEL 75X75
OBLIQUE SUPPORTING
CHAIN PURLIN 80X100
8 - EDGE FORMWORK
9 - SAFETY HAND - RAIL H=900
10 - EXECUTING SCAFFOLDING
4 - STEEL FORMWORK
5 - WOOD CANG
2 - OBLIQUE SUPPORTING D50
1 - CHAIN
3 - CANG L50X5
6 - COLUMN REBARS
7 - EXECUTING FLOOR
- CLEANING BEFORE CASTING CONCRETE
- THE FORMWORK MUST BE TIGHT TO ENSURE THAT KEEPING CEMNT WATER
- THE BEAR MUST BE STABLE AND NOT BE DEFORMED
DURING THE PROGRESS OF LOAD SUPPORTING AND OTHER EFFECTS
- THE SURFACE OF FORMWORK MUST BE CLEANED AND UNSTICKY
TECHNICAL REQUIRES NOTES:
WITH HOLE FOR CHAIN
TEEL SLAB D=6
DURING THE PROGRESS OF CONCRETE CASTING AND COMPRESSING
SITE ADRESS
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT SHOPDRAWING METHOD STATEMENT DESIGN REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
DWG NO:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED DRAWING BY VIETNAM
13/07/2012 0
VINACONEX E&C
FORMWORK OF COLUMN SUPER STRUCTURE
SITE ADRESS
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT SHOPDRAWING METHOD STATEMENT DESIGN REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
DWG NO:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED DRAWING BY VIETNAM
13/07/2012 0 VINACONEX E&C
Trang 6- FIXING BY SUPPORTING SYSTEM
- LOCATING EXACTLY THE CENTER INSTALLING 3 SIDES
PREPARING FORMWORK, SUPPORTING SYSTEM CANG BOLT, PURLIN
THE FOURTH SIDE IS SEPARATED JOINNING 3 SIDE AT THE BASE SHOES
3 SIDES JOINTED
STEP1:
COLUMN REBAR
CHAIN
OBLIQUE SUPPORT
INSTALLING THE FOURTH SIDE
THE FOURTH SIDE
TEMPORARY SUPPORTING
FABRICATING ORDER OF COLUMN FORMWORK
COLUMN REBAR
COLUMN REBAR
COLUMN REBAR
STEP 2:
STEP 3:
STEP 4:
3 SIDES JOINTED
3 SIDES JOINTED
TEMPORARY SUPPORTING
SITE ADRESS
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT SHOPDRAWING METHOD STATEMENT DESIGN REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED DRAWING BY
VIETNAM
VINACONEX E&C
EXECUTION PROCESS OF COLUMN SUPER STRUCTURE
SITE ADRESS
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT SHOPDRAWING METHOD STATEMENT DESIGN REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED DRAWING BY VIETNAM
VINACONEX E&C
Trang 79
11
3
2 1
5
7
600
600 600
BEARER
OBLIQUE BRACING
11
10 5 7
12 3
800
8
11
10
1
5 3
2
8
6 7
12
4 5 - BEARER bearer
6 - PURLIN 60X80
1- VERTICAL FORM
4 - VERTICAL SPLINT
2- BOTTOM FORM
3 - WOOD REM
11 - BRACING
12 - EXECUTING FLOOR
7 - OBLIQUE PURLIN
8 - WOOD REM
10 - SUPPORTING PURLIN
9 - SUPPORTING PURLIN
SUPPORTING PURLING
VERTICAL FORM
VERTICAL SPLINT
EXECUTING FLOOR
SPACE
HORIZONTAL BRACING
STAIRCASE FORMWORK DETAIL
DIRECTION LINE
DETAIL A
300
600
600
500 500
NOTES:
DETAIL B
DETAIL C
HORIZONTAL BRACING
SITE ADRESS
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT SHOPDRAWING METHOD STATEMENT DESIGN REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
DWG NO:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED DRAWING BY VIETNAM
13/07/2012 0
VINACONEX E&C
FORMWORK OF STAIRCASE SUPER STRUCTURE
SITE ADRESS
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT SHOPDRAWING METHOD STATEMENT DESIGN REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
DWG NO:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED DRAWING BY VIETNAM
13/07/2012 0 VINACONEX E&C
Trang 8L L
CASTING DIRECTION
EXECUTION DIRECTION PARELLEL TO MAIN BEAM
INTERRUPTION IN CONCRETE PLACEMENT WORK
SUB BEAM
MAIN BEAM
SLAB REBAR PLYWOOD FORM
WOOD SPLINT 30X40 A500
PIECE DETAIL AT CONTRUCTION JOINT
SECTION A-A
(IN CASE OF COLUMN IS HIGHT)
FLOOR LEVEL
STOP POINT 2
STOP POINT 1
RC BEAM
SEGMENT 1
(1/3 - 2/3)L1 L1
notes:
SO THE INTERRUPTION POINT MUST BE PLACED AT SUITABLE POSITION NOT TO REDUCE THE CAPACITY OF STRUCTURE.
- IT IS REQUIRED NOT TO INTERRUPT IN CONCRETE PLACEMENT WORK, BUT DUE TO TECHNICAL DIFFICULT, IT CAN'T BE DONE.
- THE MAXIMUMED TIME FOR INTERRUPTION IS FROM 20 TO 24 HOURS
- THE INTERSECTION OF VERTICAL AND HORIZONTAL STRUCTURE
- IT IS REQUIRED TO CLEAN, ROUGH, WATER THE CASTED CONCRETE SURFACE AT THE TOP POINT BEFORE NEXT STEP
TOP POINT 2A
EXECUTING DIRECTION PERPENDICULAR TO MAIN BEAM
SUB BEAM
MAIN BEAM
SEGMENT 2 WOOD SPLINT 30X40 SLAB REBAR
- THE INTERRUPTION POINT SHOULD BE AT POSITION WHERE SHEAR FORECE IS SMALL, SECTION CHANGED
STOP POINT 1
SITE ADRESS
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT SHOPDRAWING METHOD STATEMENT DESIGN REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED DRAWING BY
VIETNAM
VINACONEX E&C
CONCRETE PURING WORK SUPER STRUCTURE
SITE ADRESS
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT SHOPDRAWING METHOD STATEMENT DESIGN REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED DRAWING BY VIETNAM
VINACONEX E&C
Trang 91 - 1
12
2
5
13
11
WEDGE 80 X 80
5
7 8
steel of wall
9
5
4
6 3
13 : BOLT
12 : ANGLE STEEL
1
2
1
1
WALL FORMWORK DETAIL IN CORNER
9 10
2
3
5
1
6
7
9
8
9 : SUPPORT
7 : WOOD
8 : STEEL BAR d=16
11 : CORNER CHAIN
10 : ANCHOR
SLAB LEVEL
3
2
1
9
5 4
WORKING PLATFORM
6 : LOCATING BAR
5 : ANGLE STEEL 2 U50x37
4 : PLASTIC PILE d =20
3 : STEEL FRAME
2 : POLYWOOD d = 16mm
1 : BOLT D = 16mm
1
WALL FORMWORK DETAIL
WORKING PLATFORM WORKING PLATFORM
SITE ADRESS
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT SHOPDRAWING METHOD STATEMENT DESIGN REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
DWG NO:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED DRAWING BY VIETNAM
13/07/2012 0
VINACONEX E&C
FORMWORK OF WALL SUPER STRUCTURE
SITE ADRESS
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT SHOPDRAWING METHOD STATEMENT DESIGN REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
DWG NO:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED DRAWING BY VIETNAM
13/07/2012 0 VINACONEX E&C
Trang 101 - 1
12
2
5
13
11
WEDGE 80 X 80
5
7 8
steel of wall
9
5
4
6 3
13 : BOLT
12 : ANGLE STEEL
1
2
1
1
WALL FORMWORK DETAIL IN CORNER
9 10
2
3
5
1
6
7
9
8
9 : SUPPORT
7 : WOOD
8 : STEEL BAR d=16
11 : CORNER CHAIN
10 : ANCHOR
SLAB LEVEL
3
2
1
9
5 4
WORKING PLATFORM
6 : LOCATING BAR
5 : ANGLE STEEL 2 U50x37
4 : PLASTIC PILE d =20
3 : STEEL FRAME
2 : POLYWOOD d = 16mm
1 : BOLT D = 16mm
1
WALL FORMWORK DETAIL
WORKING PLATFORM WORKING PLATFORM
SITE ADRESS
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT SHOPDRAWING METHOD STATEMENT DESIGN REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED DRAWING BY
VIETNAM
VINACONEX E&C
FORMWORK OF WALL SUPER STRUCTURE
SITE ADRESS
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT SHOPDRAWING METHOD STATEMENT DESIGN REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED DRAWING BY VIETNAM
VINACONEX E&C
Trang 11CONCRETE SLAB METHOD TO COVERING A VOID
PURLIN FORMWORK
COMPRESSOR
CLEANING FOOT OF COLUMN BEFORE INSTALLING FORMWORK
MAINTENANCE FOR COLUMN SMOOTH SURFACE OF CONCRETE
MAINTENANCE FOR SURFACE OF CONCRET
CONCRETE SLAB ANTISORL
REBAR
machine for finishing surface of concrete
COLUMN BAR
CIMENT
rebar
SECTION 1-1
STEEL FORM
FOAM100x80
FOAM 180x50
TECHNICAL SOLUTION FOR CONSTRUCTION JOINT
MAINTENANCE, HYGIENE METHOD
SITE ADRESS
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT SHOPDRAWING METHOD STATEMENT DESIGN REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
DWG NO:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED DRAWING BY VIETNAM
13/07/2012 0
VINACONEX E&C
MAINTENANCE PROCESS SUPER STRUCTURE
SITE ADRESS
ZONE 3, MONG DUONG EWARD
DRAWING TITLE
MONG DUONG II
ITEM
AS-BUILT SHOPDRAWING METHOD STATEMENT DESIGN REFRENCE
PACKAGE
CIVIL & BUILDING WORKS
SCALE: FIT DATE: REVISION:
DWG NO:
THERMAL POWER PLANT
CONTRACTOR
DOOSAN HEAVY INDUSTRIES
SUB CONTRACTOR
VINACONEX ENGINEERING
HEAD OFFICE: 34 LANG HA TOWER, DONG DA, HANOI PHONE: 04.377.65.888
WEBSITE: VINACONEXEC.COM.VN FAX: 04.377.65.999
CAM PHA TOWN, QUANG NINH PROVINCE
CONSTRUCTION & INVESTEMENT., JSC CONSTRUCTION CO., LTD
CHECKED BY
APPROVED DRAWING BY VIETNAM
13/07/2012 0 VINACONEX E&C