Trang 1Installation Fire Stopping For:
a uPVC, PPR pipes:
1 uPVC, PPR pipes smaller than 50mm
2 uPVC, PPR pipes from 50mm up to 160mm
3 uPVC pipes over 160mm
b Metal pipes and air duct
Trang 21 General:
Items: - The Method Statement For Fire Stopping Works
2 Aim:
The objectives is to describe Fire Stopping Works associated with installation
of M&E services in compliance with the contract specification, approved shop drawings, combine and coordinated all services and structural penetration shop drawings
For pipe smaller than 50mm: Use Fire Sealant
- Clean the pipe
- Fill rockwool to sleeve (Sleeve size follow table 1)
- Apply fire sealant
- Smooth fire sealant
- Install G.I sheet 0.8mm thk - If the pipes exposed ceiling
Table 1: Sleeves Size for Pipes smaller than 50mm
Trang 3Wall/Slab Sleeve
Rockwool (60 kg/m3)
Fire sealant uPVC/PPR pipe
Apply Fire Sealant
Fire sealant
Smooth Fire Sealant
Wall/Slab
uPVC, PPR pipe Sleeve
Fire sealant Complete surface
Leave complete seal (The pipes concealed ceiling)
Wall/Slab
uPVC, PPR pipe
Trang 4G.I sheet cover 0.8mm thk (For pipes exposed ceiling only)
uPVC, PPR pipe
Plastic anchor bolt M4x50mm
Fire sealant; Depth: 10÷15mm
Rockwool (60 kg/m3) Slab
Sleeve
10÷15mm
70 mm
Detail Installation Fire Stopping For uPVC, PPR Pipe Through Slab
G.I sheet cover 0.8mm thk (For pipes exposed ceiling only) Rockwool (60 kg/m3)
10÷15mm
Plastic anchor bolt M4x50mm
Fire sealant; Depth: 10÷15mm uPVC, PPR pipe
70 mm
Wall Sleeve
Detail Installation Fire Stopping For uPVC, PPR Pipe Through The Wall
Trang 5 For pipe from 50mm up to 160mm: Use Fire Wrap
- Clean the pipe
- Cut fire wrap to the correct length (See application table)
- Wrap fire wrap around pipe
- Push fire wrap into the annular pace
- Fill all gap of fire wrap by fire sealant (If any)
Wrap fire wrap around pipeCut fire wrap
Fill all gap of fire wrap by fire sealant (If any)
Push fire wrap into the annular pace
Trang 6Plastic anchor bolt M4x50mm
Fire wrap
70 mm
Detail Installation Fire Wrap For uPVC, PPR Pipe Through The Wall
Detail Installation Fire Wrap For uPVC, PPR Pipe Through Slab
Fire wrap Rockwool (60 kg/m3) uPVC/PPR pipe
Plastic anchor bolt M4x50mm
G.I sheet cover 0.8mm thk (For pipes exposed ceiling only )
25mm 70mm
Slab Sleeve (Sleeve size follow table 2, 3)
Trang 7Table 2: Sleeves Size for Pipes from 50mm up to 160mm
Condensate Pipe size
Trang 8 For uPVC pipe over 160mm: Use Fire Collar
- Make measuring points according to pipe size
- Cut fire collar at marked measuring points according to pipe size
- Ben the intumescent side of the collar until it snap
- Shape the collar to fit the pipe and bevel intumescent edge for close fit
- Wrap the collar around the pipe and clip the first bracket into slots on both ends
- Complete other brackets and fit the collar onto wall/slab
Make measuring points according
to pipe size
Cut fire collar
Ben the intumescent side of the
collar until it snap
Shape the collar to fit the pipe
Trang 9Wrap the collar around the pipe
and clip the first bracket into slots
Detail Installation Fire Collar For uPVC Through Slab
uPVC pipe
Trang 10b Metal pipes & Air ducts: Use Fire Sealant
- Clean the pipe, Air duct
- Fill rockwool (60 kg/m3) to sleeve/opening Size of sleeve follow table 4 & 6, size of opening follow table 5
- Apply fire sealant
- Smooth fire sealant
- Install G.I sheet 0.8mm thk- If the pipes, Air duct exposed ceiling
Wall/slab
Rockwool (60 kg/m3)
Metal pipe/Air duct
Fill Rockwool To Sleeve
Trang 11Table 4: Sleeve size for metal pipes (w/o Insulation) Service Pipe size
Opening Sizes (mm) with Insulation Wide (WD) High (HD) Wide (WO) High (HO) Wide (WO) High (HO)
Trang 12Table 6: Sleeve size for chiller pipes
Service Pipe size
Trang 13Fire sealant Complete surface
Leave complete seal
Trang 14G.I sheet cover 0.8mm thk (For pipes exposed ceiling only) Plastic anchor bolt M4x50mm
Fire sealant; Depth: 10÷15mm Rockwool (60 kg/m3)
Metal pipe
Slab Sleeve
10÷15mm
70 mm
Detail Installation Fire Stopping Metal Pipe Through Slab
G.I sheet cover 0.8mm thk (For pipes exposed ceiling only) Rockwool (60 kg/m3)
10÷15mm
Plastic anchor bolt M4x50mm
Fire sealant; Depth: 10÷15mm Metal pipe
70 mm
Wall Sleeve
Detail Installation Fire Stopping For Metal Pipe Through The Wall
Trang 15Fire protection pipes
G.I sheet cover 0.8mm thk
Detail Installation Fire Stopping For Fire Protection Pipes
Exposed Ceiling Through The Wall
Rockwool (48 kg/m3) Insulation
(For pipes exposed ceiling only) Wall
Detail Installation Fire Stopping For Chiller Pipes Through The Wall
70mm Chiller insulation
Rockwool (60 kg/m3)
Plastic anchor bolt M4x50mm
Fire sealant; Depth: 10÷15mm Chiller pipe
10÷15mm
Sleeve
Trang 16Plastic anchor bolt M4x50mm
Rockwool (48 kg/m3) Insulation
70mm
G.I sheet cover 0.8mm thk (For pipes exposed ceiling only)
Rockwool (60 kg/m3) Fire sealant; Depth: 10÷15mm
Trang 17G.I sheet cover 0.8mm thk (For pipes exposed ceiling only) Plastic anchor bolt M4x50mm
Fire sealant; Depth: 10÷15mm Rockwool (60 kg/m3)
Air duct
Slab Opening
10÷15mm
70 mm
Detail Installation Fire Stopping Air duct Through Slab
G.I sheet cover 0.8mm thk (For pipes exposed ceiling only) Rockwool (60 kg/m3)
10÷15mm
Plastic anchor bolt M4x50mm
Fire sealant; Depth: 10÷15mm Air duct
70 mm
Wall Opening
Detail Installation Fire Stopping For Air duct Through The Wall
Trang 18c Electrical conduits: Use Fire Sealant
- G.I conduits: Method statement installation fire stopping for G.I
conduit through the wall/slab is the same Method statement installation fire stopping for metal pipes
- PVC conduits: Method statement installation fire stopping for
PVC conduit through the wall/slab is the same Method statement installation fire stopping for uPVC, PPR pipes smaller than 50mm through wall/slab
d Electric trunking, cable tray, ladder: Use Fire Cement
- Clean electric trunking, cable tray, ladder
- Install form work to side opening (For wall opening)
- Install form work to bottom opening (For floor opening)
- Apply fire cement to opening (Opening size follow table 4)
- Take-out form work
- Clean electric trunking, cable tray, ladder out-side the wall/slab (If any)
Opening size max
Trunking
Detail Installation Fire Cement For Cable Trunking, Cable Tray Through Wall
Trang 19≤ 600mm Cable tray Cable trunking
Fire cement
Floor opening Slab
≥ 105mm
Detail Installation Fire Cement For Cable Trunking,
Cable Tray Through Slab
Detail Installation Fire Cement For Cable
Trunking Through SlabDetail Installation Fire Cement For Cable
Trunking and Cable Through The Wall
Trang 20Busduct system: Use Rocwool and G.I Sheet
- Install G.I sheet 0.8mm thk to side opening (For wall opening)
- Install G.I sheet 0.8mm thk to bottom opening (For floor opening)
- Apply rockwool to opening
- Install G.I sheet 0.8mm thk to other side opening (For wall opening)
- Install G.I sheet 0.8mm thk to top opening (For floor opening)
- Clean busduct, working area
Trang 21G.I sheet cover 0.8mm thk
Busduct
Detail Installation Fire Stopping For Busduct Through
Slab ( Bottom View)
Busduct
Rockwool (60 kg/m3)
Detail Installation Fire Stopping For Busduct Through Slab
(Top View – Befor Install G.I Sheet Cover)
Trang 22Detail Installation Fire Stopping For Busduct Through The Wall
70mm