6 - External works and infrastructure -Road, pavement, out side corridor floor works -Swimming pool, balance tank, pool deck, water fountain playground, children's playround works -TOT
Trang 1DESCRIPTION TOTAL MOUNT (VND) Remark
-PRE TENDER ESTIMATION
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 2DESCRIPTION TOTAL MOUNT (VND) Remark
Section No 2 - Construction preliminaries
-Site Security & Management team Traffic, road maintenance and transportation -
-Section No 3 - Civil & Structural Works
-Additional works
-Section No 4 - Architectural Works
-Tiling, hardener, stone, timber works
-Section No 5 - MEPF Works
-Section No 6 - External works and infrastructure
-Road, pavement, out side corridor floor works
-Swimming pool, balance tank, pool deck, water fountain
playground, children's playround works
-TOTAL
BAO MINH EZ LAND APARTMENT District 9, HCMC
PACKAGE: SUPERSTRUCTURE PRE TENDER ESTIMATION
Issuance date: 30-Oct-2017
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 3Loose furniture for pool deck, changing room, out door gym
equipment and children's playround
MEP infrastructure works
-River clearance, cleaning and other
-Additional works
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 4PACKAGE: SUPERSTRUCTURE
SECTION NO 1 - GENERAL NOTE
A
The Bill of Quantities are to be read in conjunction with all other sections contained in
these documents which shall be construed as being complementary to one another The
Quantities given are for information only and shall be checked and verified by the
Contractors No Claim shall be allowed for errors or omissions int his Bill of quantities.
B
Allow against the items or in the prices for everything contained in these Bill of Quantities
which has a monetary value Items which are not priced or have dashes or other like
marks inserted in the cash columns will be deemed to be of no value or included
elsewhere in the tender and no Payment whatsoever will be included in Interim Payment
in the event of no amounts being inserted Lump sums are not to be given when unit rates
are applicable.
C
All rates, amounts and / or percentage values in these Bills shall be entered up to two
decimal places gor United States Dollars and no decimal places for Vietnamese Dong In
cases where more than two decimal places are entered, only the first two decimals will be
used.
D
The rates and prices entered in the Bill shall be deemed to be the full inclusive value of
the work covered by the several items including the following, unless expressly stated
otherwise;
(i) Labour and costs in connection therewith.
(ii) The supply of materials, equipment, plant, goods storage and cost in connection
therewith including waste and delivery to Site.
(iii) All construction equipment plant and costs in connection therewith.
(iv) Fixing, erecting and installing or placing of materials, equipment, plant and goods in
position including all necessary temporary works and materials.
(v) Movement of piling frames into position and about the Site, any necessary excavation
or filling required to place the frames, raising or lowering the frames and any staging,
barges or the like required to support the frames.
(vi) Driving/boring through and/or breaking up any soil material, sandstone, shale, rock or
boulders and the like at any depth.
(vii) Removal of underground obstructions together and all work in connection therewith.
(viii) Removing all surplus spoil due to piling works from Site.
(ix) Replacing incorrectly piles, damaged piles and piles which fail under tests.
(x) Safety equipment and measures such as oxygen tanks, breathing apparatus, etc for
workers operating below the surface.
(xi) The cost of any additional work due to eccentricity of piles and/or damaged or
displaced piles.
(xii) Idling time for all equipment, plant and labour for whatever reason, except on
particular instruction from the Construction Manager
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 5PACKAGE: SUPERSTRUCTURE
SECTION NO 1 - GENERAL NOTE
(xiii) Sampling and testing materials, equipment, plant and goods, testing, workmanship,
providing, storing, packing and transporting samples to and from the place of testing
(xiv) General obligations, liabilities and risks involved in the execution of the Works set
forth or reasonably implied in the tender documents including procurement of all
necessary insurances.
(xv) Establishment charges, overheads and profit.
(xvii) Payment of all taxes, fees, charges as maybe imposed on the Contractor or due to
the Works.
(xviii) Items against which no price or rate is entered shall be deemed to be covered by
the other rates and prices in the Bill of Quantities.
(xix) All rates and prices entered here inbelow shall be deemed to be in Vietnam Dongs.
E
The Contractor is deemed to have read all other related documents, Specflcations and
Bills of Quantities, etc and in particular to have studied the tender drawings to be fully
aware of the full extent of the Works described under each Direct Contractor's Works and
the corresponding interface with the Contractor's own Work.
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 6SECTION NO 2 - CONSTRUCTION PRELIMINARIES
DIVISION A - CONSTRUCTION HOARDING
Handed over, maintain and removal fence and hoarding
during construction time incl entrance gates
A - Maintain and removal fence, hoarding incl
entrance gates
Section 2, item 1.3
-B Supply maintain and removal Sign board with name of
Employerr, CM, PM, QS, Architect and M&E Consultant
Section 2, item 1.4
DIVISION B - SITE PREPARATION
Temporary electricty system, including power network Section 2, item 2.1
-D - Maintain and pay all charges for temporary
-G - Generator set mobilization and demobilization
-H - Maintain and pay all charges for temporary water
-Temporary WC on site for CM, CS, Employer, labour Section 2, item 2.5,
2.6
-Supply and maintain for storages, workshops area,
Canteen,
Section 2, item 2.7
DIVISION C - SITE OFFICE AND OFFICE FACILITY
Temporary office and facilitites for Employer, PM,
Consultant
Section 2, item 3.1,3.2
DIVISION D - SITE SECURITY & MANAGEMENT TEAM
DIVISION E - TRAFFIC, ROAD MAINTENANCE AND
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 7SECTION NO 2 - CONSTRUCTION PRELIMINARIES
PACKAGE: SUPERSTRUCTURE
-SUB TOTAL for the Traffic, road maintenance and
transportation
DIVISION F - HSE
-AK - Safety instruction signage, Safety walk way, safety
-AM - Tools PPE for Employer staff and Consultant,
DIVISION G - CONSTRUCTION METHOD
7.6.3
7.6.3
-AX Mobilisation & Demobilization to other construction
DIVISION H - BANK BOND AND INSURANCE
Bank bond
DIVISION I - AUTHORITIES APPROVAL
DIVISION J - ADDITIONAL WORKS
SECTION NO 2 - CONSTRUCTION PRELIMINARIES Total of the section: 0,000
171030
P03 TEN
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 8SECTION NO 3 - CIVIL & STRUCTURAL WORKS
Item Description Reference in Scope Qty Unit Rate Amount Remarks DIVISION A - CONCRETE WORKS
Concrete Grade B45
A Blade shear walls Section 3, item 1.3 2,276.6 m3
-B Lift Core walls Section 3, item 1.4 453.6 m3
-C Blade shear walls Section 3, item 1.3 1,278.6 m3
-D Lift Core walls Section 3, item 1.4 373.0 m3
-E Slab Section 3, item 1.1 9,105.6 m3
-F Beams Section 3, item 1.1 450.0 m3
-G Staircase Section 3, item 1.5 107.9 m3
-H Ramp Section 3, item 1.6 52.2 m3
-I Parapet wall for roof Section 3, item 1.7 37.1 m3
-Waterproofing Concrete Grade B30
-J Slab of roof, tum floor Section 3, item 1.2 562.2 m3
-K Beams of roof, tum floor Section 3, item 1.2 23.0 m3
-SUB TOTAL for the Concrete VND DIVISION B - REINFORCEMENT WORKS
-L Blade shear wall Section 3, item 1.3 884,830.6 kg
-M Lift Core wall Section 3, item 1.4 281,672.5 kg
-N Slab Section 3, item 1.1, 1.2 1,005,867.7 kg
-O Beams Section 3, item 1.1, 1.2 163,699.7 kg
-P Staircase Section 3, item 1.5 12,489.2 kg
-Q Ramp Section 3, item 1.6 8,265.3 kg
-R Parapet wall for roof Section 3, item 1.7 3,750.0 kg
-SUB TOTAL for the Reinforcement VND
-DIVISION C - FORMWORK WORKS
-SUB TOTAL for the Formworks VND
-DIVISION D - ADDITIONAL WORKS
The Contractor can add here any items that he
considers missing from this bill.
SUB TOTAL for Additional works VND
-SECTION NO 3 - CIVIL & STRUCTURAL WORKS Total of the section:
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 9Item Description Reference in Scope Qty Unit Rate Amount Remarks
DIVISION A - MASONRY WORKS
Burnt clay brick Section 4 items 1.1
A Wall 100mm thick, M75- External , including lintel & stiffener 10,046.0 m2
-B Wall 200mm thick, M75- External , including lintel & stiffener 8,484.4 m2
-C Wall 100mm thick, M75- Internal, including lintel & stiffener 16,124.9 m2
-D Wall 200mm thick, M75- Internal, including lintel & stiffener 2,390.1 m2
-Concrete blocks Section 4 items 1.2 -
-E Wall 200mm thick, M75 by Cement block - Internal, including lintel &
-H Internal plastering to brickwork 1,5 cm thick, M75 34,884.9 m2
-I Internal plastering 1,5 cm thick to wall of Wc rooms area bywaterproof Cement mortar 1,5 cm thick, M75 20,675.5 m2
-J Internal plastering 1,5 cm thick to block work 54,945.5 m2
-K External plastering 1,5 cm thick, M75 to concrete by Waterproof
cement mortar 13,885.3 m2
-L Internal plastering 1,5 cm thick, M75 to concrete by Cement mortar 33,874.7 m2
-SUB TOTAL for the masonry works VND DIVISION B - WATERPROOFING WORKS -
-M Waterproofing for lift pit, STP, Septic tank (internal) Section 4 items 2.1, 2.2 1,490.5 m2
-N Waterproofing for Domestic water tank + Fire tank (internal) Section 4 items 2.3 726.2 m2
-O Waterproofing for apartment, shophouse toilet (skirting h=300mm) Section 4 item 2.4 5,453.9 m2
-P Waterproofing for apartment, shophouse balconies (skirting h=
300mm)
Section 4 item 2.4
6,910.1 m2
-Q Waterproofing for 11th floor garden roof, (skirting h=300mm) Section 4 item 2.5 432.4 m2
-R Waterproofing for top roof , tum floor (skirting h=300mm) Section 4 item 2.6 2,715.3 m2
-S Hardener to Staircase Section 4 item 3.1 1,024.9 m2
-V Hardener to parking area Section 4 item 3.2 4,274.6 m2
-U Hardener to ramps, including non-slip joint (width 20mm, depth
10mm)
Section 4 item 3.2
-W Screeding for slab by cement mortar Grade 75 37,268.37 m2
-X Homogenous tiling to floor 600 mm x 600 mm in living room, kitchenarea of apartments-including door-sill Section 4 item 3.9 15,819.2 m2
-Y Homogenous tiling to floor 600 mm x 600 mm in small bedroom of
Homogenous tiling to floor 300 mm x 300 mm in changing rooms,
Wc of security room, Wc of gym room
-AF Homogenous tiles 600 mm x 600mm for Community rooms Section 4 item 3.8 177.4 m2
-AG Homogenous tiling to floor 600 mm x 600 mm for kindergarten room Section 4 item 3.8 292.4 m2
-AH Homogenous tiling to floor 600 mm x 600 mm for gym room,manager room, security room Section 4 item 3.8 87.5 m2
-AI Homogenous tiles 600 mm x 600mm for Main lobby / lift lobby /
-AJ Ceramic tiling to rubbish room Section 4 item 3.14 122 m2
-AK Domestic water tank, fire tank Section 4 item 3.3 236 m2
-Ceramic tiling to roof of 3F (F8) Section 4 item 3.19 89.2 m2
-AL Cutting the anti-slip line at the corner of steps Section 4 item 3.1 870.2 m
-AM Painting line for intrernal parking Section 4 item 3.17 493.0478 m2
-AN Stone bazan to 11th floor garden roof incl screeding and curb
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 10Item Description Reference in Scope Qty Unit Rate Amount Remarks
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 11Item Description Reference in Scope Qty Unit Rate Amount Remarks
Internal Walls WC by Homogenous tile 300 mm x 600 mm to Wc of
changing room, security room, gym room
Section 4 item 3.12
89.2 m2
-AT Lift frame typical floors bygranit tile Section 4 item 3.7 316.9 m2
-AU Walls skirting to small bedroom, living room, kitchen area of
apartments by Homogenous tile 70 mm x 600 mm 15,732.6 m
-AV Walls skirting to bacony, logia by tile 70 mm x 600 mm 9,729.1 m
-AW Walls skirting to Main lobby / lift lobby / corridor, by Homogenous tile
70mm x 600mm,bobby rooms 3,333.6 m
-AX Walls skirting to Community rooms, kindergarten room manager
room, security room, by Homogenous tile 70mm x 600mm 191.3 m
-
-AY Concrete Louver wall 200x200 to washing room of shophous,
arpartment,(no plastering, including paint finish)
Section 4 item 3.5
-AZ Ceramic tile backsplash to kitchen of apartment Section 4 item 3.18 1,406.9 m2
-BA Ceramic tiling to rubbish room 368.8 m2
-BB Ceramic tiling to Domestic water tank, fire tank Section 4 item 3.3 331.3 m2
-BC Lift frame GF by granite stone Section 4 item 3.6 21.1 m2
-BD Finish lift wall by black hairline stainless steel Section 4 item 3.6 16.9 m2
-BE Reflective paint for ram area 15.0 m2
-BF External wall groove 5,400.0 m
-BG Finish wall by washed stone to 11th floor of garden roof (F19) Section 4 item 3.15 54.6 m2
-BH Finish wall by MDF 18mm, including paint finish of lobby rooms Section 4 item 11.2 51.6 m2
-SUB TOTAL for the Tiling, hardener, stone, timber works VND
-DIVISION D - EMULSION PAINTING WORKS
Emulsion paint
BI Putty coat and low VOC emulsion paint for apartments to walls ofliving room and bedroom, kitchen Section 4 item 4.4 93,086.6 m2
-BJ Putty coat and low VOC emulsion paint to ceilings of kitchen area,living room and bedroom Section 4 item 4.4 25,920.3 m2
-BK Waterproof putty coat and low VOC moisture resistant emulsionpaint to ceilings of Wc…. Section 4 item 4.7 3,352.0 m2
-BL Putty coat and emulsion paint to walls of Technical rooms,
Community rooms, gym room, security room, etc 14,210.0 m2
-BM Putty coat and emulsion paint to ceiling of Technical rooms,
Community rooms, security room, etc, staircases,ect 2,841.5 m2
-BN Emulsion paint to ceiling of aparking area, STP rooms, tum floor
-Emulsion paint with waterproof putty
BO Putty coat and low VOC moisture resistant emulsion paint to ceilings
of loggia…
Section 4 item 4.6
4,926.4 m2
-BP Putty coat and outdoor emulsion paint to outdoor side of walls, wallof balcony, yard, aircon ledges Section 4 item 4.1 33,074.5 m2
-BQ Finishing layer by spray concrete glue on the wall of façade GF Section 4 item 4.2 150.0 m2
-SUB TOTAL for the Emulsion painting works VND DIVISION E - CEILING / FALSE CEILING WORKS
-Gypsum board ceiling
BR Concealed gypsum ceiling, thickness 9mm (C3) Section 4 item 5.1 166.2 m2
-BS Exposed gypsum ceiling, size 600mm x 600mm, thickness 9 mm
-SUB TOTAL for the Ceiling / False ceiling works VND
-DIVISION F - ROOFING WORKS
BV Crushed concrete - Mesh steel layer (excluding waterproofing layer) 2,315.0 m2
-BW Finish floor by heat resistant tiles 2,315.0 m2
-SUB TOTAL for the roofing works VND DIVISION G - DOORS AND WINDOWS
-Wooden doors
BX MDF door with melamine surface, fireproof for 45minute, size 1000
x 2200 including accessories to main entrance (D12) 572.0 set
-BY MDF door with melamine surface size 900 x 2200 includingaccessories to bedroom (D13) 967.0 set
-BZ Moisture resistant MDF door with melamine surface size 800 x 2200
including accessories to Wc room (D14) 946.0 set
-CA MDF door with melamine surface, fireproof for 70minute, size 1300
x 2200 including accessories (D08) 2.0 set
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 12Item Description Reference in Scope Qty Unit Rate Amount Remarks
PACKAGE: SUPERSTRUCTURE
SECTION NO 4 - ARCHITECTURAL WORKS
CB MDF door with melamine surface, fireproof for 70minute, size 1200
x 2200 including accessories (D09) 10.0 set
-CC Door with plywood finish by veneer surface, wood farme, fireproof
for 70 minute, size 600mm x 2000mm (D25) 76.0 set
-CD Door with plywood finish by veneer surface, wood farme, fireproof
for 70 minute size 1710mm x 2000mm (D26) 71.0 set
-CE Door with plywood finish by veneer surface, wood farme,, fireproof
for 70 minute size 480mm x 2000mmt (D28) 32.0 set
-CF Moisture resistant MDF door with melamine surface size 900 x 1000
including accessories (D29) 1.0 set
-
-Aluminium doors and windows
-CL Aluminium window size 600x600mm including accessories (WS1) 290.0 set
-CM Aluminium window size 600x1000mm including accessories (WS2) 194.0 set
-CN Aluminium window size 2950x1850mm including accessories
-CR Aluminium window size 990x1800mm including accessories (WS7) 1.0 set
-CS Aluminium window size 2790x1800mm including accessories
-CV Glass partition, aluminum frame size 7100x2600mm including doorD11 size 2350x2200mm and accessories (WG1) 2.0 set
-CW
Glass partition, aluminum frame size 3825x2600mm including door
D11 size 2350x2200mm and accessories (WG2) 2.0 set
CX
-Glass partition, aluminum frame size 850x2600mm including
accessories (WG3) 3.0 set
CY
-Glass partition, aluminum frame size 2540x2600mm including door
and accessories (WG4) 1.0 set
-CZ
Glass partition, aluminum frame size 3870x2600mm including door
D11 size 2350x2200mm and accessories (WG5) 1.0 set
-Glass partition, aluminum frame size 2790x2600mm including
accessories (WG7) 3.0 set
-DC Glass partition, aluminum frame size 890x2600mm includingaccessories (WG8) 6.0 set
-DD Glass partition, aluminum frame size 4120x2600mm including doorD11 size 2350x2200mm and accessories (WG9) 5.0 set
-DE Glass partition, aluminum frame size 4120x2600mm includingaccessories (WG10) 1.0 set
-DF Glass partition, aluminum frame size 7055x2600mm includingaccessories (WG11) 1.0 set
-DG Glass partition, aluminum frame size 3870x2600mm including doorD11 size 2350x2200mm and accessories (WG12) 2.0 set
-DH Glass partition, aluminum frame size 5740x2600mm includingaccessories (WG13) 1.0 set
-DI Glass partition, aluminum frame size 4040x2600mm including doorD11 size 2350x2200mm and accessories (WG14) 1.0 set
-DJ Glass partition, aluminum frame size 5715x4550mm including doorD11 size 2350x2200mm and accessories (WG15) 2.0 set
-DK Glass partition, aluminum frame size 2275x2600mm including doorand accessories (WG16) 1.0 set
-DL Glass partition, aluminum frame size 3825x2600mm includingaccessories (WG17) 2.0 set
-DM Aluminium louvers 39.6 m2
-DN Apartment shower partition by glass for master bathroom of
arpartment, including accessories, h= 2000mm 755.2 m2
-
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 13Item Description Reference in Scope Qty Unit Rate Amount Remarks
PACKAGE: SUPERSTRUCTURE
SECTION NO 4 - ARCHITECTURAL WORKS
DR Steel fire rated door size 900 mm x 2200 mm including accessories
-SUB TOTAL for the Doors and Windows VND DIVISION H - METAL WORKS
-DY Steel railing and handrail to staircases 255.0 m
-DZ Railing of loggia, yard, private balcony for shophouse, apartment 1,928.7 m
-EA Steel Staircase for arpartment 38.0 nos
-EB Steel Staircase for shophouse 8.0 nos
-EC Allow for steel protection angle for column parking area (V50x50X5,
-ED Wall by Steel frame for parking area 123.1 m2
-EE Steel frame lavabo including granit for Wc of changing room,
kindergarten room,… 7.1 m
-EF Steel frame including granit for BBQ kitchen of 11F 3.0 m
-EG Steel grating for ramp (Including angle steel V50x50x5) 10.4 m
-EH Steel grating for garden 11F (including angle steel V50x50x5) 71.5 m
-EI Stainless steel ladder for lift 4.0 nos
-EJ Ladder for STP, Septic tank 9.0 nos
-EK Ladder for Domestic water tank + Fire tank 3.0 nos
-EL Logo "Housneo" of lobby rooms 2.0 set
-EM Steel frame, glass canopies at GF including accessories 152.6 m2
-EN Steel frame, glass canopies roof garden at 11F including
accessories 98.8 m2
-EO Speed reducer of parking 22.8 m
-EQ Door mats in carpet at entrances 1.0 sum
-ER Partition laminat for Wc, changing room 5.0 m2
-ES Supply & install convex mirror for parking area 7.0 nos
-SUB TOTAL for the Metal works VND DIVISION I - KITCHEN CABINETS MIRROR CABINETS
-ET Moisture resistant MFC with melamine finish to kitchen cabinet,
L=3.05 m, including stone counter top 368.0 set
-EU Moisture resistant MFC with melamine finish to upper kitchencabinet, L=3.05 m 368.0 set
-EV Moisture resistant MFC with melamine finish to kitchen cabinet,
L=2.25 m, including stone counter top 192.0 set
-EW Moisture resistant MFC with melamine finish to upper kitchen
cabinet, L=2.25 m 192.0 set
-EX Moisture resistant MFC with melamine finish to kitchen cabinet of
kindergarten room 1.0 set
EY
-Moisture resistant MFC with melamine finish to mirror cabinet for
master barthroom 560.0 set
-SUB TOTAL for the Kitchen Cabinets, Mirror Cabinets VND
-DIVISION J - SIGNAGE
EZ Beacons on roof top (including structure & architecture) 1.0 sum
-FA Entrance signage at GF (including structure & architecture) 1.0 sum
-Directional signage to public areas and address signage to all rooms
FB Apartment of Block A (1a) 280.0 nos
-FC Apartment of Block B (1b) 280.0 nos
-FD Lift symbol of Block A (2a) 57.0 nos
-FE Lift symbol of Block B (2b) 57.0 nos
-FF Floor number symbol and apartment instruction at lift lobby (3) 38.0 nos
-FG Exit outline of Block A (4a) 19.0 nos
-FH Exit outline of Block B (4b) 19.0 nos
-FJ Number of Floor inside staircase (6) 80.0 nos
-FK Restroom (Male-Female) (7) 2.0 nos
-FL Entrance symbol of Block A (8a) 1.0 nos
-FM Entrance symbol of Block B (8b) 1.0 nos
-FN Entrance symbol into Lift lobby of Block A (9a) 6.0 nos
-FO Entrance symbol into Lift lobby of Block B (9b) 38.0 nos
-FP Entrance into fire-escape (10) 80.0 nos
-FR Toilet - Male (12) 3.0 nos
-FS Toilet - Female (13) 3.0 nos
-ST Waste water treament (14) 1.0 nos
-FV Generator room (16) 1.0 nos
-FW Power station (17a) 1.0 nos
-FX Illustration of Electric danger caution (17b) 3.0 nos
-FY Electric Room (18) 1.0 nos
-GA Communication room (20) 2.0 nos
-GB Car Packing (21) 5.0 nos
-GC Entrance - Exit (22a) 4.0 nos
-GD Parking instruction (22b) 1.0 nos
-GE Fire Fighting (23) 76.0 nos
-GF Garbage room (24) 70.0 nos
-GG Electric box (25) 36.0 nos
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 14Item Description Reference in Scope Qty Unit Rate Amount Remarks
PACKAGE: SUPERSTRUCTURE
SECTION NO 4 - ARCHITECTURAL WORKS
-GI Management room (27) 2.0 nos
-GK No-smoking (29) 38.0 nos
-GM Guard house (31) 1.0 nos
-GN Shopehouse (32) 18.0 nos
-GP Swimming pool for adult (34a) 2.0 nos
-GQ Swimming pool for kid (34b) 2.0 nos
-GR Lift technical room (35) 1.0 nos
-SUB TOTAL for the Signage VND DIVISION K - LOOSE FURNITURE FOR PUBLIC AREAS
-Building Management Office
GY Hight cabinet (HC1) 1.0 nos
-The Contractor can add here any items that he considers missing
from this bill
-SUB TOTAL for Additional works VND
-S ECTION NO 4 - ARCHITECTURAL WORKS Total of the section: -
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 15SECTION NO 5.1 - MEP WORK-LIFTS
A
EL-01: Passenger/Service/Fire lifts
1200x2100x2500(WxDxH),19 stops, load 1000 kg, spec
2.5m/s incl granite floor finish
See drawing & Spec fordetail Section 5 items 1.1 ~ 1.7 lot 2.00 -
Included Steel beamsfor hoistway
B EL-02: Passenger lift 1400x1500x2500(WxDxH), 19 stops,
load 1000 kg, spec 2.5m/s incl granite floor finish
See drawing & Spec fordetail Section 5 items 1.1 ~ 1.7 lot 4.00 -
Included Steel beamsfor hoistway
-DIVISION B - ADDITIONAL WORK
The Contractor can add here any items that he considers
missing from this bill
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 16SECTION NO 5.2 - MEP WORK: PLUMBING WORKS
-F Other acessories:( Towel handle + Paper handle + Soap
handle + Clothes handle + Glass shelves) lot 8.00
-
L Other acessories:( Towel handle + Paper handle + Soap
handle + Clothes handle + Glass shelves) lot 928.00
8.1 ~ 8.5
Equipments
roofR
roof
-AB Anti Vibaration Unit & inertia blocks for Pumps lot 8.00
-Domestic Water Tank
-Group of Pressure Reducing Valve DN125, Including
-Group of Pressure Reducing Valve DN100, Including
-BD Pipe Fittings : Elbow, bend, tee, reducer, screw cap,
connector, coupling, end cap, union, flange… lot 1.00
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 17SECTION NO 5.2 - MEP WORK: PLUMBING WORKS
Remarks
PACKAGE: SUPERSTRUCTURE
-CA Pipe Fittings : Elbow, bend, tee, reducer, screw cap,
connector, coupling, end cap, union, flange… lot 1.00
-CE Pump “Badu” 90/25, output
-CF Filter Nozbart Ø760mm, made of
laminated GRP with multiport
-CI Return wall inlet made of ABS,
-CJ Vacuum connector for cleaning purpose made of ABS,
-CK Cone foot valve DN65 PVC for
-CM Salt chlorinator “Zodiac” TRI-XO
Large self-cleaning, with timer &
super-chlorinating feature (for
pool using salt water, no need to
put chlorine daily into the pool)
set 2.00
-CN Ladder “Club”, 3 safety steps,
-CR Cleaning accessories (telescopic
pole 4.8m, vacuum head, leaf rake,
pool brush)
lot 1.00
-Others quipment:
Underwater light for adult pool:
CS Underwater light Power LED 17W
warm white, made of stainless
steel AISI 316
set 5.00
-CT Wall fitting for underwater light
Power LED 17W, made of
stainless steel AISI 316
set 5.00
-CU Controller for underwater light
-CW Underwater light Power LED 9W
warm white, made of stainless
steel AISI 316
set 2.00
-CX Wall fitting for underwater light
Power LED 9W, made of stainless
steel AISI 316
set 2.00
-CY Controller for underwater light
Wibre Power LED 9W, IP65 (1 for
2 lights)
set 1.00
-DA Pump “Badu” 90/7, output
-DB Filter Nozbart Ø400mm, made of
laminated GRP with multiport
-DE Floor return inlet 8 x 8mm PVC
-DF Cone foot valve DN40 PVC for
171030
P03 TEN
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 18SECTION NO 5.2 - MEP WORK: PLUMBING WORKS
Remarks
PACKAGE: SUPERSTRUCTURE
DR HDPE pipe, PN16, DN32 (Underground pipe from Public
water connection point to Swimming Pool) m 90.00
-DS Installtion for adult and kid pool, fountain plan ground for kid lot 1.00
2.2.1~2.2.4; 2.3 ~2.7 and 8.1 ~ 8.5
-EE Pipe Fittings : Elbow, bend, tee, reducer, screw cap,
connector, coupling, end cap, union, flange… lot 1.00
-EN Pipe Fittings : Elbow, bend, tee, reducer, screw cap,
connector, coupling, end cap, union, flange… lot 1.00
-DIVISION E - SEWAGE TREAMENT PLANT
INSTALLATION
Section 5 items 2.2.1~2.2.4 & 2.3 ~2.7
-EZ Fittings and sub material for installation of pump and
171030
P03 TEN
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 19SECTION NO 5.2 - MEP WORK: PLUMBING WORKS
Remarks
PACKAGE: SUPERSTRUCTURE
-FX Pipe Fittings : Elbow, bend, tee, reducer, screw cap,
connector, coupling, end cap, union, flange… lot 1.00
-GG Coring c/w waterproofing, concreate code 400, thk 13cm D200 set 12.00
-GH Coring c/w waterproofing, concreate code 400, thk 13cm D125 set 120.00
-GI Coring c/w waterproofing, concreate code 400, thk 13cm D110 set 7.00
-GJ Coring c/w waterproofing, concreate code 400, thk 13cm D60 set 16.00
-GO Testing, Commissioning and handover technology for STP lot 1.00
-DIVISION G - ADDITIONAL WORKS
GF The Contractor can add here any items that he considers
missing from this bill
171030
P03 TEN
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 20DIVISION A - MVAC WORKS Section 5 items:
I Support for outdoor unit: fabricated by V40x4 steel and 30x3
-J Accessories (M10 hanger, bolt,…) calculated by 5% total lot 1.00
-K Copper pipe D15.9, 0.8mm thickness+ insulation 16mm
-Accessories (support, M10 hanger, bolt,…) calculated by 5%
-U Accessories (support, M10 hanger, bolt,…) calculated by 5%
- Air FLow : 520L/s
- Pressure Head :100Pa
-X EAF-G-02
- Type : Ceilingmounted
- Air FLow : 430L/s
- Pressure Head :100Pa
-Y EAF-G-03
- Type : Ceilingmounted
- Air FLow : 320L/s
- Pressure Head :100Pa
-Z EAF-G-04
- Type : Ceilingmounted
- Air FLow : 260L/s
- Pressure Head :100Pa
-Amount
PACKAGE: SUPERSTRUCTURE
SECTION NO 5.3 - MEP WORK: MVAC WORKS
171030
P03 TEN
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 21PACKAGE: SUPERSTRUCTURE
SECTION NO 5.3 - MEP WORK: MVAC WORKS
AC TEF-G-03
- Type : Ceilingmounted
- Air FLow : 30L/s
- Pressure Head :60Pa
-Aparment Area
AR TEF
- Type : Ceilingmounted
- Air FLow : 20L/s
- Pressure Head :30Pa
-AS KEF
- Type : Ceilingmounted
- Air FLow : 20L/s
- Pressure Head :30Pa
-AU
Hangers, supports, spring isolator for axial and inline fan lot 1.00
-Public & Other Areas
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 22PACKAGE: SUPERSTRUCTURE
SECTION NO 5.3 - MEP WORK: MVAC WORKS
-Apartment Floor
-Public & Other Areas
-Apartment Floor
-CR Flexible Air Duct c/w insulation and submaterial D100 m 1,530.00
-Reser area
-Reser area
-POWER INSTALLATION
DH Distribution and Control Panel, cable and tray, conduit,…and
Hangers, supports, sub material for complted lot
-DIVISION D - ADDITIONAL WORKS
The Contractor can add here any items that he considers
missing from this bill
171030
P03 TEN
RFI 001
App 03-171030
P03 TEN
DOC
BOQ
REV
A
Trang 23
171030
P03 TEN
DOC
BOQ
REV
A
Trang 24
171030
P03 TEN
DOC
BOQ
REV
A