1 - General note MC during construction stage Construction hoarding Site Preparation Site Office and Office Facility Site Security & Management team Traffic, road maintenance and transpo

Trang 1

Issuance date: 30-Oct-2017

Revision: 0A SUMMARY

Section No 1 - General note

(MC) during construction stage

Construction hoarding Site Preparation Site Office and Office Facility Site Security & Management team Traffic, road maintenance and transportation

HSE Construction method Bonds and insurance Authorities Approval Additional works

Concrete works Reinforcement works

Formworks Additional works

owner including roofing works, the landscape works

Masonry works Waterproofing works Tiling, hardener, stone, timber works Skimcoat and Emulsion painting works

Ceiling / False ceiling works

Roofing Doors and Windows works

Metal works Kitchen Cabinets and Mirror cabinets

Signage works Loose furniture for public areas, security room, Building Management

Office Additional works

Lift works Plumbing works MVAC works Fire Fighting and Prevention works

Electrical works Additional works

including landscape Leveling grading works

Road, pavement, out side corridor floor works

Gate & fence works Stormwater drainage system works

Landscape works Swimming pool, balance tank, pool deck, water fountain playground,

children's playround works Canopy main entrance works Loose furniture for pool deck, changing room, out door gym

equipment and children playround

MEP infrastructure works

PACKAGE: SUPERSTRUCTURE SCOPE OF WORKS

171030

BM ART

P03 TEN RFI

001

App 02-171030

BM ART

P03 TEN DOC SOW REV A

Trang 2

Issuance date: 30-Oct-2017

Revision: 0A SUMMARY

PACKAGE: SUPERSTRUCTURE SCOPE OF WORKS BAO MINH EZLAND APARTMENT District 9, HCMC

River clearance, cleaning and other

171030

BM ART

P03 TEN RFI

001

App 02-171030

BM ART

P03 TEN DOC SOW REV A

Trang 3

SECTION NO 1 - GENERAL NOTE

A

The Bill of Quantities are to be read in conjunction with all other sections contained in these documents

which shall be construed as being complementary to one another The Quantities given are for

information only and shall be checked and verified by the Contractors No Claim shall be allowed for

errors or omissions int his Bill of quantities.

B

Allow against the items or in the prices for everything contained in these Bill of Quantities which has a

monetary value Items which are not priced or have dashes or other like marks inserted in the cash

columns will be deemed to be of no value or included elsewhere in the tender and no Payment

whatsoever will be included in Interim Payment in the event of no amounts being inserted Lump sums are

not to be given when unit rates are applicable.

C

All rates, amounts and / or percentage values in these Bills shall be entered up to two decimal places gor

United States Dollars and no decimal places for Vietnamese Dong In cases where more than two

decimal places are entered, only the first two decimals will be used.

D The rates and prices entered in the Bill shall be deemed to be the full inclusive value of the work covered

by the several items including the following, unless expressly stated otherwise;

(i) Labour and costs in connection therewith.

(ii) The supply of materials, equipment, plant, goods storage and cost in connection therewith including

waste and delivery to Site.

(iii) All construction equipment plant and costs in connection therewith.

(iv) Fixing, erecting and installing or placing of materials, equipment, plant and goods in position including

all necessary temporary works and materials.

(v) Movement of piling frames into position and about the Site, any necessary excavation or filling

required to place the frames, raising or lowering the frames and any staging, barges or the like required to

support the frames.

(vi) Driving/boring through and/or breaking up any soil material, sandstone, shale, rock or boulders and

the like at any depth.

(vii) Removal of underground obstructions together and all work in connection therewith.

(viii) Removing all surplus spoil due to piling works from Site.

(ix) Replacing incorrectly piles, damaged piles and piles which fail under tests.

(x) Safety equipment and measures such as oxygen tanks, breathing apparatus, etc for workers operating

below the surface.

(xi) The cost of any additional work due to eccentricity of piles and/or damaged or displaced piles.

(xii) Idling time for all equipment, plant and labour for whatever reason, except on particular instruction

from the Construction Manager

(xiii) Sampling and testing materials, equipment, plant and goods, testing, workmanship, providing,

storing, packing and transporting samples to and from the place of testing

(xiv) General obligations, liabilities and risks involved in the execution of the Works set forth or reasonably

implied in the tender documents including procurement of all necessary insurances.

(xv) Establishment charges, overheads and profit.

(xvi) Payment of all taxes, fees, charges as maybe imposed on the Contractor or due to the Works.

(xvii) Items against which no price or rate is entered shall be deemed to be covered by the other rates and

prices in the Bill of Quantities.

(xviii) All rates and prices entered here inbelow shall be deemed to be in Vietnam Dongs.

E

The Contractor is deemed to have read all other related documents, Specflcations and Bills of Quantities,

etc and in particular to have studied the tender drawings to be fully aware of the full extent of the Works

described under each Direct Contractor's Works and the corresponding interface with the Contractor's

own Work.

PACKAGE: SUPERSTRUCTURE

171030

BM ART

P03 TEN RFI

001

App 02-171030

BM ART

P03 TEN DOC SOW REV A

Trang 4

SECTION NO 2 - CONSTRUCTION PRELIMINARIES

Employer Contractor

1.1

Hoarding, Entrance gates, Billboard for main façade building

(follow axis A)

Main Contractor will be handed over by Substrucutre Contractor

x

1.2 Fence for the rest of the sides surrounding the Site Main Contractor will be handed over by Substrucutre Contractor x

1.3

Fence and hoarding during construction time Maintain and repair it as necessary to keep this condition during the

1.4

Supply maintain and removal Sign board with name of

Employerr, CM, PM, QS, Architect and M&E Consultant

Maintain and repair it as necessary to keep this condition during the

Include connection with Service providers (EVN) installation, maintenance, consumption, remove but not including temporary Transformer for construction, Allowance for stand-by generator will use during the construction period, as long as full back up peractivities on site, lighting for night shift

x

Temporary Earthing system including supply, install, remove,…fee during construction time

2.2 Temporary water for construction time

Include connection with Service providers (SAWACO) installation, maintenance, consumption, remove as long as full back up peractivities

2.3 The water drainage system

Include connection, installation, maintenance, removeas well as for construction and testing & commissioning

The water drainage system must be separate from the construction drainage system

And Comply with DTM accessment & DTM approval for construction stage and EZLAND Method Statement Guidelines

x

2.4 Telephone - internet system

Include connection with Service providers (Viettel, )

- Number of telephone lines: 04 line, including connecting

- LAN system and fiber internet with wifi, including connecting Following TCVN/codes/norms/Manufacturer requirements Communication charges

x

Site Arrangement

Safety training, rebar workshop, rebar fabrication yard, formwork workshop area, stores for materials

All must ensure the sufficient area for use

Finishing base made of concrete with 100 mm thick Following TCVN/codes/norms/Manufacturer requirements

x

Canteen If canteen is installed, it shall be located outside the building, with tight

control of cleanliness and and approved by the authorities x

2.8 Guard post Location anear Entrance gate, included: table, chair, light, fan,… x

2.9 Washing bay

Main Contractor will be handed over by Substrucutre Contractor, maintain and repair it as necessary to keep this condition during the construction period

x

2.10 Temporary accommodation for workers Not allowed inside the Project and no any worker is allowed to stay on

2.11 All other work that the contractor deems necessary to serve

3.1 The Employer Office

* Provide and maintain temporary site Office, for the Employer staff and Consultant, with private room for PD/PM with surficient working spaces for 20 staff minimum

Meeting room with whiteboard for 30 people Temporary toilet

Sample room, store rooms

* Provide the private motorbike parking with roof

* Daily cleaning

x

3.2 Facilities for Employer Office

Provide and maintain:

- A3, A4 photocopier with functioning of color printing and color scanning, printing via wifi

- A3 and A4 paper

- Telephone: 4 lines, full internet

- Shelf, cabinets tables, chairs which is sufficient for working and meeting of 20 poeple

- Walkie-Talkie: 6 sets

- Electric water heater including drink water

x

4 Security & Management team Following TCVN/codes/norms/Manufacturer requirements

BAO MINH EZLAND APARTMENT District 9, HCMC

PACKAGE: SUPERSTRUCTURE

Remarks

* To be provided for temporary toilets, cleaning, etc

And Comply with DTM accessment & DTM approval for construction stage and EZLAND Method Statement Guidelines

2.7

2.1 Temporary power for construction time, including power

network

171030

BM ART

P03 TEN RFI

001

App 02-171030

BM ART

P03 TEN DOC SOW REV A

Trang 5

SECTION NO 2 - CONSTRUCTION PRELIMINARIES

Employer Contractor

PACKAGE: SUPERSTRUCTURE

Remarks

4.2 Management team

Allowance for site management staff mobilization and demobilization (including expat If any) including travelling, accommodation, out-of-pocket expenses

x

5 Traffic, road maintenance and transportation

5.1 Internal Traffic and maintenance

Main Contractor can use internal road from substructure package and can propose additional road to make sure site transportation as required

Temporary road need to be strong and clean during construction stage Maintain and repair during the construction period

x

5.2 External traffic and maintenance

Control external traffic for trucks coming to site Periodic check the status of external road and repair immediately in during construction stage

x

6 HSE

6.1 Hygiene

* Time to time cleaning all site including roads surrounding site

* Clean all dump truck before going out of site

* Provide sufficient number of WC for workers

* Organize regular pest control including mosquito, termite

x

6.2 Safety

Including but not limited

* Safety staff

* First Aid

* Safety instruction signage at all locations can be dangerous

* Safety plan, evacuation plan, tools PPE for contractor

* Safety walk way

* Tools PPE for Employer staff and Consultant: 20 sets (included safety helmets, safety boots, reflective jackets)

* Tools PPE for guests: 20 sets (included safety helmets, safety boots, reflective jackets)

* Periodic inspect/test the machines, tower crane, hoist, etc

x

6.3 Environment

* Control and limit dust continously

* Provide temporary septic tank before discharging

* The water drainage system must be separate from the construction drainage system

* And Comply with DTM accessment & DTM approval for construction stage and EZLAND Method Statement Guidelines

x

6.4 Rubbish cleaning * Provide center point for rubbish stores, discharge daily

* Time to time cleaning the site out of water, rubbish x 6.5 Site fire fighiting system Provision of site security services during the Contract period x

All construction methods will be submitted for approval prior to commence works on site

7.1 General

7.1.1 Works protections

Works need to be protected prior to carry our next works

Hardener slab:

- Surface protection: recommended to cover, protect the surface to avoid staining, discoloration, or mechanical impact

All exposed sleeves / cables:

- Proper boxes & cap to cover and secure to floor

x

7.1.2 Durable and long term use

Works are designed and constructed well to make sure they are durable for long term use

The nature of works should be designed based on location eg outdoor works and indoor works to make sure all works are suitable for respective areas,

x

7.1.3 Survey & mornitoring Main Contractor to propose report of observation of subsidence and

inclination for the building and neighbor buildings x 7.1.4 Scaffolding system and surrounding scaffolding The scaffolding must be comply to safety requirement and adapted to

7.1.5 All necessary works independent checking of construction

method

Allowance for all necessary works independent checking of

7.1.6 Submission of materials' sample for approval including

resubmision of alternatives and lor substitution

Allowance for any cost in connection herewith for submission of materials' sample for approval including resubmision of alternatives and lor substitution

x

7.1.7 Preparing and submission all as buili drawings Including but not limited x

7.21 Excavation * Provide adapted construction method to make sure there is no any

inclinations and displacements of compressed piles x

7.22 Formwork for slab & Beam

* To ensure the surface of areas that are not covered by false ceiling, are flat for direct putty and painting eg living room, bed room

* Drawings and inspection sheet must be submitted to Consultant/PU for prior to permission to use

* Inspection of formwork is mandatory for each demoulding

* Use aluminum formwork for typical floors and plywood for other floors

x

171030

BM ART

P03 TEN RFI

001

App 02-171030

BM ART

P03 TEN DOC SOW REV A

Trang 6

SECTION NO 2 - CONSTRUCTION PRELIMINARIES

Employer Contractor

BAO MINH EZLAND APARTMENT District 9, HCMC

PACKAGE: SUPERSTRUCTURE

Remarks

7.23 Formwork for shear wall, columns and staircase,…

* Use formwork based on standardized sizes and meets construction standards

* Drawings and inspection sheet must be submitted to Consultant for prior to permission to use

* Inspection of formwork is mandatory for each demoulding

x

7.24 Concrete

* The slab must be poured out of the hot weather and rainy weather

* All tests are required

* Curing concrete is required to prevent hairline crack, using plastic / fabric sheet cover and chemical where required,

x

7.25 Reinforcement Following TCVN/codes/norms/Manufacturer requirements x

7.3 Architecture works

7.31 Bricklaying

Following TCVN/codes/norms/Manufacturer requirements and

"Reference Buiding Method Statement Guidelines" Ref: EZLAND

-BM-2016 - A0 Item 3.1

x

7.3.2 Plastering

Following TCVN/codes/norms/Manufacturer requirements and

"Reference Buiding Method Statement Guidelines" Ref: EZLAND

-BM-2016 - A0 Item 3.2

x

7.3.3 Skim coat

Following TCVN/codes/norms/Manufacturer requirements and

"Reference Buiding Method Statement Guidelines" Ref: EZLAND

-BM-2016 - A0 Item 3.3

x

7.3.4 Screeding/ rendering

Following TCVN/codes/norms/Manufacturer requirements and

"Reference Buiding Method Statement Guidelines" Ref: EZLAND

-BM-2016 - A0 Item 3.4

x

7.3.5 Tiling

Following TCVN/codes/norms/Manufacturer requirements and

"Reference Buiding Method Statement Guidelines" Ref: EZLAND

-BM-2016 - A0 Item 3.5

x

7.3.6 Emulsion Paint

Following TCVN/codes/norms/Manufacturer requirements and

"Reference Buiding Method Statement Guidelines" Ref: EZLAND

-BM-2016 - A0 Item 3.6

x

7.3.7 Aluminum doors & windows

Following TCVN/codes/norms/Manufacturer requirements and

"Reference Buiding Method Statement Guidelines" Ref: EZLAND

-BM-2016 - A0 Item 3.7

x

7.3.8 Wooden laminate flooring

Following TCVN/codes/norms/Manufacturer requirements and

"Reference Buiding Method Statement Guidelines" Ref: EZLAND

-BM-2016 - A0 Item 3.8

x

7.3.9 Cement / concrete block Following TCVN/codes/norms/Manufacturer requirements x

7.3.10 False ceiling Following TCVN/codes/norms/Manufacturer requirements x

7.3.11 Wooden doors Following TCVN/codes/norms/Manufacturer requirements x

7.3.12 Steel doors Following TCVN/codes/norms/Manufacturer requirements x

7.4 MEP works

7.4.1 Quality requirements for MEP works

Following TCVN/codes/norms/Manufacturer requirements and

"Reference Buiding Method Statement Guidelines" Ref: EZLAND

-BM-2016 - A0 Item 4.1

x

7.4.2 Electrical wiring system

Following TCVN/codes/norms/Manufacturer requirements and

"Reference Buiding Method Statement Guidelines" Ref: EZLAND

-BM-2016 - A0 Item 4.2

x

7.4.3 Floor trap

Following TCVN/codes/norms/Manufacturer requirements and

"Reference Buiding Method Statement Guidelines" Ref: EZLAND

-BM-2016 - A0 Item 4.3

x

7.4.4 Drilling and fixing

Following TCVN/codes/norms/Manufacturer requirements and

"Reference Buiding Method Statement Guidelines" Ref: EZLAND

-BM-2016 - A0 Item 4.4

x

7.5 Metal Works

7.5.1 Installation of anchor bolt, metal works, metal accesories in

wet/outdoor areas Following TCVN/codes/norms/Manufacturer requirements x

7.5.2

Installation of metal accesories in dry/indoor areas such as

Hardware instalation and accessories doors stoppers,locks,

handles, hinges,

Following TCVN/codes/norms/Manufacturer requirements x

Contractor is encouraged to use tower crane #1 which is being used for Substructure package

In case that foundation of crane #1 does not meet Contractor's requirement, Contractor to propose new one to ensure schedule

x

Include: foundation,installation and erection, operation, dismantling and demobilization of tower cranes including licensed driver, banksman and maintenance, foundation and piling, embedded anchor bolts, mast jacking up, bracing, material landing platforms for cranes, power and fuel used for operation

x

Safety inspection cost and approval for use x

As per Method statement by Contractor to make sure safety and construction schedule

Include: foundation,installation and erection, operation, dismantling and demobilization of hoits including licensed driver, banksman and maintenance, foundation and piling, embedded anchor bolts, mast jacking up, bracing, material landing platforms for cranes, power and fuel used for operation

x 7.6.1

7.6.2

Tower cranes # 1, #2

Hoits

171030

BM ART

P03 TEN RFI

001

App 02-171030

BM ART

P03 TEN DOC SOW REV A

Trang 7

SECTION NO 2 - CONSTRUCTION PRELIMINARIES

Employer Contractor

PACKAGE: SUPERSTRUCTURE

Remarks

Safety inspection cost and approval for use x

7.6.3 Equipment and tools Including but not limited: Mobilisation & Demobilization to other

10 Authority Approval

Allowance for obtaining from Authorities all notices,necessary application, licenses or permits for all other matters during Construction time

x

11 On the acceptance for operatuon of project construction

upon its complettion

To estimate cost for testing and commissioning, handover, connect including but not limit MEP systems as Fire Fighting, connect to public transportation, electric, plumbing, garbage, exhausted air,

x

171030

BM ART

P03 TEN RFI

001

App 02-171030

BM ART

P03 TEN DOC SOW REV A

Trang 8

PACKAGE: SUPERSTRUCTURE

1 Concrete, Steel reinforcement Following TCVN/codes/norms/Manufacturer requirements

1.1

Slab, beam Concrete B30- Holcim

Steel reinforcement (SD 390) - Hoa phat/ Mien Nam / Pomina

1.2

Roof slab, beam, tum floor Waterprofing Concrete B30- Holcim

Steel reinforcement (SD 390) - Hoa phat/ Mien Nam / Pomina

1.3

Blade shear walls Concrete B45 (ground floor to 11th floor), B40 (upper floors),

-Holcim Steel reinforcement (SD 390) - Hoa phat/ Mien Nam / Pomina Vinakyoei or or equivalent

x

1.4

Lift Core walls Concrete B45 (ground floor to 11th floor), B40 (upper floors),

-Holcim Steel reinforcement (SD 390) - Hoa phat/ Mien Nam / Pomina Vinakyoei or or equivalent

x

1.5

Staircase * The steps will be casted in concrete, no solid brick steps

Concrete B30- Holcim Steel reinforcement (SD 390) - Hoa phat/ Mien Nam / Pomina Vinakyoei or or equivalent

x

1.6

Steel reinforcement (SD 390) - Hoa phat/ Mien Nam / Pomina

1.7

Parapet wall on roof Concrete B30- Holcim

Steel reinforcement (SD 390) - Hoa phat/ Mien Nam / Pomina

2 Formwork

Following TCVN/codes/norms/Manufacturer requirements '* Use formwork based on standardized sizes and meets construction standards

* Drawings and inspection sheet must be submitted to Consultant for prior to permission to use

* Inspection of formwork is mandatory for each demouldin

x

SCOPE OF WORKS

Scope of

Remarks Employer's Requirements

SECTION NO 3 - STRUCTURE WORKS

171030

BM ART

P03 TEN RFI

001

App 02-171030

BM ART

P03 TEN DOC SOW REV A

Trang 9

Employer Contractor

1 Masonry works

1.1

Burnt clay Brick works * 200mm thickness burnt brick wall all facades/envelops of building

* Link to concrete wall by tie bar

* Laying bricks must comply with the manufacturer's requirements: the thickness of mortar joints, for laying a tolerance of 4mm on 2 meters

* 1 solid brick line for each 5 hollow brick lines

* No holes of hollow brick facing out the facade,

* solid brick 5 layer for bottom of WC / bathroom wall, , wall all facades, wall for the steel door, aluminum door

* Strengthen concrete beam for every wall which higher than 3m, 80x80x190 - 4 Hollow Clay Brick/ 40x80x190 - 2 Hollow Clay Brick Mac 75

*Wc wall use burnt clay brick Unit rate including Lintel & Stiffener refer to architecture design & structure drawing

x

1.2

Non-burnt blocks * Use for all internal wall (100mm & 200mm thk where applicable),

* Link to concrete wall by tie bar

* Laying bricks must comply with the manufacturer's requirements: the thickness of mortar joints, for laying a tolerance of 3mm on 2 meters (aluminium ruler)

Unit rate including Lintel & Stiffener refer to architecture design & structure drawing,

x

1.3

Plastering to brick wall

* Warterprofing mortar for external side

* Warterprofing mortar for internal wall Wc

* Normal mortar for internal side

* The application of the cement must be by via a layer of scratch coat The dosage should be perfectly quantified by dosing and mechanic mixing

* Wire mesh to prevent crack at corner of wall, surround openings, along MEP conduit, along the joint btw 2 different materials

* Strip lines / joints on facade where applicable

x

1.4

Plastering to non-burnt blocks * Use mortar as stated in specification of non burnt brick

* Plastering must comply with the manufacturer's requirements: the thickness for laying and the flatnesse tolerance

* Wire mesh to prevent crack at corner of wall, surround openings, along MEP conduit, along the joint btw 2 different materials

x

1.5 Concrete louver blocks for façade (hollow type) Refer to architecture design x

2.1

STP, Septic tank Standard waterproofing product

Waterproofing by waterproofing bitimen menbrane layer for internal wall and bottom, top slab

x 2.2 Lift Standard waterproofing product

Waterproofing by waterproofing bitimen menbrane layer for internal wall x 2.3

Domestic water tank, fire tank Standard waterproofing product

Waterproofing by bush cement - based waterproofing layer for internal wall and bottom, top slab

x

2.4

Yard, Balcony, Loggia, aircon ledge, Wc Standard waterproofing product

Waterproofing by bush cement - based waterproofing layer with skirting 300mm- refer architecture drawing

x Including water proofing for open floor 2.5

Terrace garden Standard waterproofing product

* Cementitious or Bitumen membrane with trees, root resistant, with skirting 300mm- refer architecture drawing

* Hairline crack resistant

x

2.6

Roof, tum floor Standard waterproofing product

* Cementitious or Bitumen membrane with skirting 300mm- refer architecture drawing

* Hairline crack resistant

x

3 Tilings, hardener, stone, timber works

3.1

Staircase including padded rooms , steps Hardener- Sikafloor Chapdur Grey (Sika) or equivalent, , including skirting

Hardener direct on concrete steps, cutting the anti-slip line at the corner of

3.2

Parking area, ramp, Hardener direct on concrete floor, , including skirting

Sikafloor Chapdur Grey (Sika) or equivalent

*Ramp including non-slip joint

x

3.3

Domestic water tank, fire tank * Ceramic tile

* water resistant grouting (pointing) x 3.4 GF lobby rooms *Homogenous tiles 600mm x 600mm* Water resistant seals (pointing) , with 70mm in height skirting x

3.5

GF, 1F, 2F, 3F corridors & all typical corridors

Including water meter rooms, electricity meter rooms,

* Homogenous tiles 600mm x 600mm , with 70mm in height skirting

* Water resistant grouting (pointing)

x 3.6 Lift frame GF Granite stone,hairline stainless steel x

3.7 Lift frame 1F, 2F, 3F, Typical floors (jamb and lintel) Homogenousgranit tiles, only surrounding lift doors x

3.8 Community rooms, children playround room, Gym room, manager room,security room with 70mm height skirting Homogenous tiles 600mm x 600mm, ncl Screeding x

3.9 Apartment - Living room, kitchen area, small bedrooms, including door-sill Homogenous tiles 600mm x 600mm, with 70mm height skirting ncl.Screeding, i x

3.10 Apartment - Master Bedrooms Laminate timber, with 70mm height skirting ncl Screeding x

Apartment - Wc floor, other area, including door-sill * Anti-slip homogenous tiles 300mm x 300mm , ncl screeding

* Water resistant seals (pointing) x Apartment - Bathroom floor for shower area * Anti-slip homogenous tiles 300mm x 300mm , ncl screeding

* Water resistant seals (pointing) x 3.12 Wc wall of Apartment and other area * Homogenous tiles 300mm x 600mm , ncl screeding

* Water resistant seals (pointing) x 3.13 Apartment - Yard, balcony, loggia, aircon ledges, including door-sill Homogenous tiles 300mm x 600mm, with 70mm height skirting ncl.Screeding x

3.14 Rubbish stores floor * Ceramic tiles 300mm x 300mm x

3.15

Garden 11F Bazan stone

Concrete grass block Finish wall by washed stone x 3.16 Door mats in carpet at entrances the carpet tile door mats at GF lobbies x

3.17 Painting line for intrernal parking Epoxy paintFollowing TCVN/codes/manufacturer x

3.11

SECTION NO 4 - ARCHITECTURAL WORKS

Scope of

Remarks

171030

BM ART

P03 TEN RFI

001

App 02-171030

BM ART

P03 TEN DOC SOW REV A

Trang 10

Employer Contractor

PACKAGE: SUPERSTRUCTURE

SECTION NO 4 - ARCHITECTURAL WORKS

Scope of

Remarks

3.18 Ceramic tile backsplash to kitchen of apartment *Finish by tiles* Water resistant seals (pointing) x

3.19 Ceramic tiling to roof of 3F (F8) Ceramic tile

3.20 Other area Refer to architecture design x

4 Putty and Emulsion painting works

4.1 External wall on façade outdoor emulsion paints, special façade, water resistant, washable x

4.2 Finishing layer by spray concrete glue on the wall of façade GF By spray concrete glue

Following TCVN/codes/manufacturer x 4.3

Parkings, technical rooms, corridors, lobby, community rooms, etc Indoor emulsion paints, The areas which are exposed to dirty, the paint has

to be adapted for the intense dirty (washable paint mat, or similar)

*Note: Shear wall of parking area use outdoor emulsion paints x 4.4 Apartment - Living room, bedrooms, kitchen area Indoor low VOC emulsion paints x

4.5

Apartment - Bathroom ceiling and kitchen above the counter kitchen indoor moisture resistant low VOC emulsion paints

All WC and have the access panel with sufficient size for maintenance x 4.6

Apartment - Yard, balcony, loggia, aircon ledges, exter, outdoor emulsion paints

x

5 Ceiling/False ceiling works

5.1

Concealed gypsum ceiling, thickness 9mm 9 mm thick gypsum board incl shadow line

Standard gypsum board by Gyproc or equivalent Frame system Vinh tuong or equivalent

x

5.2

Exposed gypsum ceiling, thickness 9 mm 9mm thickness gypsum board, size 600x600mm

Standard gypsum board by Gyproc or equivalent Frame system Vinh tuong or equivalent

x

5.3

Apartment - WC 9mm thickness moisture resistant gypsum board

Standard gypsum board by Gyproc or equivalent Frame system Vinh tuong or equivalent

x

5.4

Apartment - bulk head, ME pile system * 9mm thickness gypsum board to hide copper pipes for aircon

Standard gypsum board by Gyproc or equivalent Frame system Vinh tuong or equivalent

x 5.5 Bare soffit concrete slab & beam No plastering x

6 Roofing

6.1

Roof Heat tile- U 200x200x75mm

Crushed concrete-mesh steel, makes area slope thickness layer around

7.1

Apartment - entrance door MDF door with melamine surface, fireproof

Hardwares are in Germany brands like ABUS, WUERTH, HAFELE or equivalent

Note: Door lock with 3 modes: key lock, number lock, card

x

7.2

Apartment - bedrooms door MDF door, 900mm x 2200mm

With stopper, door locks in Germany brands like ABUS, WUERTH, HAFELE or equivalent

Other hardwares are standard equipments

x

7.3

Apartment - bathroom door Moisture resistant MDF door, 800mm x 2200mm

With stopper, door locks in Germany brands like ABUS, WUERTH, HAFELE or equivalent x

7.4

General Aluminum doors and windows Size of aluminum doors and windows as architectural design

8.36mm laminated tempered glass thickness minimum Hardware are in Germany brands like ABUS, WUERTH, HAFELE or equivalent

x

7.5

Glass partition, aluminum frame Size of Glass partition as architectural design

8.36mm laminated tempered glass thickness minimum Hardware are in Germany brands like ABUS, WUERTH, HAFELE or equivalent

x

7.6

Shower screen * Fixed tempered glass panel for shower screen excluding glass door,

height= 2000mm

* Only master bathroom

x 7.7

Fire rated doors Staircase doors, technical room doors, doors for the GF lift lobby

x 7.8

Where fire rated door is not required such as riser for water meter,

electricity meter, etc

MDF door with veneer surface, wood frame, fireproof Hardwares are in Germany brands like ABUS, WUERTH, HAFELE or equivalent

x 7.9 Roller shutter doors * For ramp of parking x

7.10 Aluminium louvers and louver Following TCVN/codes/manufacturer x

8.1 FF Staircase, and Community rooms 60mm diameter steel handrail x

8.2 Loggia, private loggia Steel plate 70mm x 5mm for handrail of all loggia, yard, private balcony (

8.3 Out side corridor floor Steel plate 70mm x 5mm for handrail of all corridor ( H= 1.3m) x

8.4 Steel Staircase for aparment Steel staircase with steel handrail x

8.5 Steel Staircase in shophouse Steel staircase with steel handrail x

8.6

Ramp and handicaped ramp * 60mm diameter steel handrail

* Follow TCVN/codes/norms and any specific requirement from Authorities

on Handicaped

x 8.7 Stainless steel for lift, tanks Following TCVN/codes/manufacturer x

8.8 V-protection for all columns/shear wall in parking area Galv V steel, x

8.9 Steel grating for ram wide 300mm, (Included angle steel V50x50x5) Following TCVN/codes/manufacturer x

8.10 Steel grid for parking area Following TCVN/codes/manufacturer x

8.11 Steel frame lavabo include granit for changing room Following TCVN/codes/manufacturer x

8.12 Partition laminat for Wc for changing room Following TCVN/codes/manufacturer x

Other

8.13

Canopy at GF walkway, drop-off and roof garden 11F * Steel frame, glass roof, including accessories

* Canopy at GF is designed to protect the pedestrial walking from the entrance to GF lobbies

* All canopies are designed for the long term used and durable in outdoor condition,

* The width of canopy is wider than width of walkway below

x

8.14 Speed reducer of parking Following TCVN/codes/manufacturer x

8.15 Car stop Following TCVN/codes/manufacturer x

8.16 Door mats in carpet at entrances Following TCVN/codes/manufacturer x

171030

BM ART

P03 TEN RFI

001

App 02-171030

BM ART

P03 TEN DOC SOW REV A