1. TẦNG KHÔNG ĐIỂN HÌNH
CỘT, VÁCH / LÕI THANG : CỐP PHA VÁN
CẦU THANG BỘ : CỐP PHA VÁN
2. TẦNG ĐIỂN HÌNH
. CỘT, VÁCH / LÕI THANG : CỐP PHA NHÔM
CẦU THANG BỘ : CỐP PHA NHÔM
TẦNG ĐIỂN HÌNH
TẦNG KHÔNG ĐIỂN HÌNH
1 BIỆN PHÁP CỐP PHA
Trang 25 GIẢI PHÁP CỐP PHA CHO TẦNG KHÔNG ĐIỂN HÌNH
2 LÕI THANG : CỐP PHA VÁN
CẦU THANG BỘ : CỐP PHA VÁN
DẦM, SÀN : CỐP PHA VÁN
5
4
CỘT, VÁCH : CỐP PHA VÁN 1
MẶT BẰNG TẦNG KHÔNG ĐIỂN HÌNH
1 BIỆN PHÁP CỐP PHA
CỘT TRÒN : CỐP PHA THÉP 3
Trang 3COFICO Copyright © 2017
2
1 CỘT, VÁCH: CỐP PHA VÁN
LÕI THANG: CỐP PHA VÁN
Trang 45 1 BIỆN PHÁP CỐP PHA GIẢI PHÁP CỐP PHA CHO CỘT TRÒN
3 CỘT TRÒN: CỐP PHA THÉP
Trang 5COFICO Copyright © 2017
5.
DẦM SÀN: CỐP PHA VÁN
5
4
CẦU THANG BỘ: CỐP PHA VÁN
Trang 65 1 BIỆN PHÁP CỐP PHA GIẢI PHÁP CỐP PHA CHO TẦNG ĐIỂN HÌNH
2 LÕI THANG : CỐP PHA NHÔM
CẦU THANG BỘ : CỐP PHA NHÔM
3
CỘT, VÁCH : CỐP PHA NHÔM 1
MẶT BẰNG TẦNG ĐIỂN HÌNH
Trang 7COFICO Copyright © 2017
2
1 CỘT, VÁCH: CỐP PHA NHÔM
LÕI THANG: CỐP PHA NHÔM
Trang 8DẦM, SÀN: CỐP PHA NHÔM
3
Trang 9COFICO Copyright © 2017
5.
4 CẦU THANG BỘ: CỐP PHA NHÔM
Trang 105 MẠCH NGỪNG THI CÔNG: CỐP PHA NHÔM
MẶT CẮT TRÌNH TỰ THI CÔNG MẠCH NGỪNG
MẶT BẰNG ĐỊNH VỊ MẠCH NGỪNG THI CÔNG
Trang 11COFICO Copyright © 2017
MẶT CẮT GIÀN GIÁO BAO CHE BÊN NGOÀI PHỐI CẢNH GIÀN GIÁO BAO CHE BÊN NGOÀI