COFICO Copyright © 20181 SINGLE SIDED FORMWORK : PLYWOOD FORMWORK.

Trang 1

COFICO Copyright © 2018

5 4 FORMWORK METHOD

NON-TYPICAL FLOORS

BASEMENTS

NON-TYPICAL FLOORS

TYPICAL FLOORS

 COLUMN, WALL / CORE WALL : PLYWOOD FORMWORK

 COLUMN, WALL / CORE WALL : PLYWOOD FORMWORK

 COLUMN, WALL / CORE WALL : ALUMINIUM FORMWORK

Trang 2

COFICO Copyright © 2018

1

Trang 3

COFICO Copyright © 2018

Trang 4

COFICO Copyright © 2018

2

COLUMN, WALL : PLYWOOD FORMWORK

3

4

1 SINGLE SIDED FORMWORK : PLYWOOD FORMWORK

5

Trang 5

COFICO Copyright © 2018

2

COLUMN, WALL : PLYWOOD FORMWORK

3

4

5

Trang 6

COFICO Copyright © 2018

1 SINGLE SIDED FORMWORK : PLYWOOD FORMWORK

Trang 7

COFICO Copyright © 2018

5.

2 BEAM, SLAB : PLYWOOD FORMWORK

Trang 8

COFICO Copyright © 2018

5 4 FORMWORK METHOD

3 COLUMN, WALL : PLYWOOD FORMWORK

4 CORE WALL : PLYWOOD FORMWORK

FORMWORK FOR COLUMN, WALL / CORE WALL

Trang 9

COFICO Copyright © 2018

5 STAIR : PLYWOOD FORMWORK

Trang 10

COFICO Copyright © 2018

2 COLUMN, WALL : ALUMINIUM FORMWORK

3

4

1

Trang 11

COFICO Copyright © 2018

5.

1 BEAM, SLAB : PLYWOOD FORMWORK

Trang 12

COFICO Copyright © 2018

5.

2 COLUMN, WALL : ALUMINIUM FORMWORK

2 CORE WALL : ALUMINIUM FORMWORK

Trang 13

COFICO Copyright © 2018

4 STAIR : PLYWOOD FORMWORK

Trang 14

COFICO Copyright © 2018

5 6 SAFETY PROTECTION SYSTEM – OPTION 1 EXTERNAL SCAFFOLDING

Trang 15

COFICO Copyright © 2018

5 6 SAFETY PROTECTION SYSTEM – OPTION 1

LƯỚI HỨNG VẬT RƠI BÊN TRONG

Trang 16

COFICO Copyright © 2018

5 6 SAFETY PROTECTION SYSTEM – OPTION 1

LƯỚI HỨNG VẬT RƠI BÊN TRONG

Trang 17

COFICO Copyright © 2018