Construction Methodology for Transfer Beams – System support... Formwork Methodology for Transfer Beams – Sequences... Construction Methodology – Step 2: Testing load to system support..

Trang 1

VIETTEL OPERATION & TRADE CENTER

BIM

Trang 2

Block B – 4 star Hotel

Transfer beam area

Trang 3

Transfer beam 3 .00m x 3.70m

Trang 4

Viettel Operation & Trade Center Project  Item: Block B – 4 Star Hotel, 

 24 floors and 03 basements

 Main scope : Structural works 

& Finish works M&E, not yet nominated

 Total height : 93.90 m

 Commencement : 02/01/2013

 Expected completion : 23/09/2014

Trang 5

F HC

F HC

F HC P&D HVAC

SE OA

KE TE KE CW CHW

FS SP

P&D

P&D ELE

P&D P&D

R S

T U

V W

Trang 6

Construction Methodology for Transfer Beams – System support

Trang 7

Formwork Methodology for Transfer Beams – Sequences

Trang 8

Formwork Methodology for Transfer Beams – Sequences

Trang 9

Construction Methodology – Step 1: Erecting system support

Trang 10

Construction Methodology – Step 2: Testing load to system support

Trang 11

Construction Methodology – Step 3: Installing rebars

Trang 12

Construction Methodology – Step 4: Installing post tension cable

Trang 13

Construction Methodology – Step 4: Installing post tension cable

Trang 14

Construction  Methodology – Step 5: Installing cooling system & temperature sensor

Trang 15

Construction Methodology – Step 6: Finishing beam side formwork for 1st casting

Trang 16

Construction Methodology –  Step 7: 1st Casting

Trang 17

Construction Methodology – Step 8: Curing the 1st Casting 

Trang 18

Construction Methodology – Step 9: Finishing beam side formwork for 2nd casting

Trang 19

Construction Methodology – Step 10.1: 2nd casting

Trang 20

Construction Methodology – Step 10.2: Checking temperature after concreting

Trang 21

Construction Methodology – Step 11: Post tension

Trang 22

Construction Methodology – Step 12: Dismantling support + formwork and Finishing

Trang 23

With practical experiences, we are considering how BIM to support us IMPROVING ???

Trang 24