Installing the Cabinet Installation of boards and functional modules in the cabinet Installation of cabinet cables Installation of iSite... Installing the Cabinet Cabinet placeme
Trang 1Course No : EQA R1 008
Composer : Engineering Quality
Dept.
Trang 2BTS Introduction
Dimensions of BTS312 cabinet: 1880mmx650mmx500mm
Dimensions of BTS30 cabinet: 1600mmx600mmx450mm
Trang 4 Installing the Cabinet
Installation of boards and
functional modules in the cabinet
Installation of cabinet cables
Installation of iSite
Trang 5Installing the Cabinet
Cabinet placement principle
Cabinet installation flow
Trang 6Cabinet Placement Principle
Reserve at least 0.8m between
the side face of the cabinet and
the wall
Reserve at least 1m between
the rear side of the cabinet
and the wall
Reserve an aisle at least 1m in
width in the equipment room
Minimize the distance between
the cabinet and the feeder
window to reduce the length of
feeder
Terminal maintenance
Trang 7Determining the Installation Position
Determine the cabinet installation position based on the design drawings
If no design drawing is available, confirm the position with the customer
The cabinet may be installed on the cement floor or anti-static floor This slide only introduces how to install the cabinet on the cement floor
Key points:
1 Take the future expansion into consideration
2 Pay attention to the positions where the power supply, grounding cable, and antenna feeder are lead in and adjust them when necessary
Trang 8Cement Floor Installation Flowchart
Flowchart of accessory
installation on the
cement floor
Trang 9Note that the notch on the template coincides with the front side of the cabinet.
Holes and border lines
of the cabinet marked according to the line drawing template
Positioning the Cabinet
1 Determine the position of the cabinet
Key points:
Comply with the design
Reserve proper space around the
cabinet to facilitate the maintenance
Meet the space requirement for
Positions of holes are correct Pay
attention to the position of combined
cabinet
Trang 10Note that the notch on the template coincides with the front side of the cabinet.
Holes and border lines
of the cabinet marked according to the line drawing template
Positioning the Cabinet
Remove the dust
Verify dimensions of the
hole.
4 Install the expansion bolt
Key points:
The guiding rib is properly
inserted to the guiding slot
of the expansion tube.
Trang 11Mount Set
The mount set is generally used
for cabinet installation The
mount set is composed of upper
and lower frames The upper
frame must be fixed to the bottom
of the cabinet and the lower
frame to the cement floor
1
2
3 4 5
(1) Lower frame (2) Upper frame (3) Flat washer 12 (4) Φ 12 spring
washer (5) Bolt (M12x30)
Trang 12Installing the Frame
1 Install the lower frame
Key points:
The insulation plate is installed correctly
The fixing hole of the lower frame is aligned with
the hole of the expansion bolt
Ensure the space between the two lower frames
2 Level the lower frame.
Key points:
Use the horizontal ruler.
Ensure that two directions of the cabinet are level
The leveling pad is inserted to the correct place.
Trang 13Insulation Test and Cabinet Installation
1 Insulation test:
Key points:
Use the mega ohm range of the
multimeter
Test the insulation between the cabinet
and the floor.
The test is passed if the resistance is
larger than 5 mega ohm
2 Level and fasten the cabinet.
Key points:
Place the cabinet in position and push
the cabinet in horizontally
Use the horizontal ruler.
Ensure that two directions of the cabinet
are level
Ensure that the cabinet is installed
vertically
The installation order of the insulation
covering, spring washer, and flat washer
is correct
The expansion bolts are diagonally
fastened in turn
The installation order of the insulation covering, spring washer, and flat washer is correct
Trang 14Installing the Air Breaker Box, Fan Box, and Sub racks
From top to bottom, the cabinet is installed with:
1 Air breaker box
2 Sub racks
3 Fan box
Trang 15Installing the Air Breaker Box
Slide in the air breaker box along the
guide rail After it is in position, fasten
the screws on the panel
Trang 16Installing Sub racks
Before installing or removing
the CDU sub rack, TRX sub
rack, or common unit sub rack,
remove the rear door of the
cabinet, and unplug all power
connectors on the backplane of
the sub rack The installation
procedure is opposite to the
removal procedure
Trang 17Installing Sub racks
Trang 18Installing the Fan Box
Slide the fan box in along the
guide rail After it is in position,
fasten the screws on the panel
Fan box
Fan box
Trang 19Installation of Boards and Functional Modules in the Cabinet
Key points:
Confirm that the settings of DIP switch on
the backplane are correct
If you bring the board into the equipment
room from outside in winter, do not
unpack and install the board immediately
Check that the installation slot is correct
The fastening screws of the board must
be tightened
Empty slots must be installed with
dummy panels
Trang 20Installing Boards and Functional Modules in the Cabinet
CDUs are installed in the
CDU sub rack, TRXs in the
TRX sub rack, and PSUs ,
PMUs in the common unit sub
rack
You may need to remove the
front and rear doors of the
cabinet when installing the sub
racks
Trang 21Installing Boards and Functional Modules in the Cabinet (Precautions)
Anti-static requirements:
Boards and modules have
electrostatic sensitive
components Thus, observe the
anti-static requirements when
installing or replacing boards or
modules
Trang 22Installing Boards and Functional Modules in the
Cabinet (Precautions)
Before installing a board or module:
Confirm whether you need to set the DIP switch or the jumper on the backplane
Confirm whether you need to set the DIP switch or the jumper on the board or module
Trang 23Installing Cables
Install power cables
Install grounding cables
Installing transmission cables
Install jumpers of the antenna
feeder
Attach and bundle the labels
After the external cables are
installed, check whether the ports
not in used are properly capped and
whether the connector water-proof
measures for the external cables
are effective
Trang 24Installing power cables of the cabinet
- 48V - GND - PGND power supply installation:
Key points:
The route is correct and conforms to the manual
The polarities are correct and correspond to the labels
Screws are fastened
Connections are reliable
The radius of the curve meets the requirements
Labels are in order
Contents of the labels are legible
Trang 25Cabinet External Cable Installation
— Power Grounding Cable
Lay and install the power cables and grounding cables
Installation order: 1) Prepare the connectors of the cables on the BTS side 2) Attach labels 3) Install the cables and top-set box 4) Bundle the
cables 5) Connect the power cabinet and indoor ground bars
Trang 26Cabinet External Cable Installation — PGND Cable
Key points:
1 Crimp the lug reliably No cooper wire should be exposed
2 The labels are correct and legible
3 Cable ties are bound towards the same direction Spaces between cable ties must be consistent No sharp edge should be exposed
Trang 27Cabinet External Cable Installation
— Signal Transmission Cable
Install the top-set box: signal cable with
E1 connector on the top of the cabinet
Install the match head on the top of the
cabinet
Lay the 2M transmission cables: DDF box
(DDF frame)
Key points:
1 The label is legible and consistent
2 Power cables are separately bundled
3 Cable ties are bundled in compliance
with specifications
Trang 28Installation of iSite
iSite can be mounted on the wall or on the mast
These two installation modes differ in the installation method of the iSite cavity, and are the same in installation and requirements of other parts, including boards and cables
Trang 29Installation of iSite Cavity: Wall-Mounted Method
Determine the installation position
Drill the holes and install the bracket
Install the iSite main sub rack
Key points:
1 The bracket is level and secured
2 The main sub rack is reliably fixed
to the bracket
Trang 30Installation of iSite Cavity: Mast-Mounted Method
Install the U-shape clamp on the mast
Install the bracket on the mast
Install the main sub rack
Key points:
1 The U-shape clamp is in close and
reliable contact with the mast
2 The sun shelter is installed at an
appropriate height
Trang 31Installation of iSite: Boards and Cable Connection
Install the boards properly
Ensure the close contact between boards and cavity
Distribute and connect board cables
Carry out water-proof measures
Install the chassis
Trang 32Installation of iSite: Boards and Cable Connection
Point
The transmission mode
setup dial code is correct
Outside the metal label
binds solid, is easy to distinguish
After measured, the cabinet
shell installation gap conforms to the standard, the outer covering screw screws tight and locked
Trang 33www.huawei.com Thank You