Tài liệu Mortar pptx

2 199 0
Tài liệu đã được kiểm tra trùng lặp

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Tiêu đề Tiger Drylac Resistance Against Mortar
Người hướng dẫn Ing. Holzberger
Chuyên ngành Quality Control
Thể loại Test instruction
Năm xuất bản 1993
Định dạng
Số trang 2
Dung lượng 24,93 KB

Các công cụ chuyển đổi và chỉnh sửa cho tài liệu này

Nội dung

TIGER DRYLACQuality Control Test instruction Approved by: Ing.. Outline: 1.1 Test standard • ASTM C 207 • ASTM D 3260 1.2 Explanation This test should guarantee the resistance against

Trang 1

TIGER DRYLAC

Quality Control

Test instruction

Approved by:

Ing Holzberger

Issue date January 93

Update status

00

Folder - Nr

HQ 03 - 18

page 1/3

1 Outline:

1.1 Test standard

• ASTM C 207

• ASTM D 3260

1.2 Explanation

This test should guarantee the resistance against mortar

2 Work instruction

2.1 Brief description of the procedure

Mortar mixed accordingly to ASTM C 207 is put on the coated test sheet metal The test has

to take place accordingly to ASTM D 3260

2.2 Requirements

After 24 hours the mortar should be removed easily and without arrears Mechanical violations of the coating are not to be considered by grains of sand

3 Test intervals

3.1 Original inspection

At the time of the termination of a development a check is to be executed before the mass production

3.1 Repeat inspection

The check is to be executed in an interval of one year Those products, which pass through annual system inspections of the GSB or Qualicoat, are excluded

4 Analysis

The analysis has to take place without consideration from possibly occurring scratches The removal of the mortar must be easily possible, there mustn’t be any color modification in the powder coating

If the requirements are not fulfilled all loads are to be locked and the customer about the lack

to be informed

Trang 2

TIGER DRYLAC

Quality Control

Test instruction

Approved by:

Ing Holzberger

Issue date January 93

Update status

00

Folder - Nr

HQ 03 - 18

page 2/3

5 Responsibility

5.1 Original inspections

• The internal checks are passed on by the laboratory conductor or in its absence by its deputy to the laborants trusted with the check

• The results are in that above mentioned sequence to transmit

• With negative results the product may not become certified for the sales The prescription should accordingly be improved

5.2 Repeat inspections

• The inspection results are to be transmitted to the responsible laboratory conductor or in its absence to its deputy, in order to initiate, if necessary, following steps

• With a negative result the barrier of the product is to be arranged by the QA and a recheck from the above mentioned initiated

This product is locked out from the GSB till repeat inspections

The sales conductor and its deputies are informed about the product barrier

5.3 Customer information

• The sales department has to inform the customers about the loss of the GSB - permission

• All customers which purchased this product are to be informed about the result