• The Quality Control Manager shall coordinate with the Project Manager, site staff on ways of resolving quality-related production problems.. • The Quality Control Manager shall review

Trang 1

QUANLITY CONTROL METHOD

Trang 2

TABLE OF CONTENTS

1 DESCRIPTION OF WORK

2 QUALITY ORGANIZATION

3 BIDDER'S QUALITY CONTROL PLAN

4 QUALITY CONTROL LIST

Trang 3

1 Description of Work

The Bidder will be committed to a Quality Control with the aim to ensure conformance with contractual requirements, and to provide Employer's confidence, that the products and services are fit for their intended purposes

It is part of the Bidder's overall and ongoing development to implement and maintain quality to give effect the Employer's expectation of optimum price, timely delivery, construction quality and conformity to specifications are all fulfilled

In the first instance, quality means the successful realization of contractual requirement, including technical specifications and the meeting of deadlines, all done in an economic manner The quality requirements stated in the contract thus delegate a very high responsibility to individual staff

In order to measure and attain of these goals a "Quality Control Plan" is established This system is advantageous to the Engineer, the Employer as well as the Bidder The Quality Control Plan ensures simple and logical documentation which shall help the Engineer in his control as well as the: Bidder in the execution of the works, and is particular helpful in'… minimizing the cost of extra work

Quality Control Plan should not just be a slogan It should be a positive procedure, willingly accepted by all staff as their responsibility, with which they identify the procedures and goals, and act accordingly

The development of procedures have been defined and integrated within our Quality Control Plan in accordance with ISO 9001 This will ensure that required quality levels are achieved on overseas construction sites by careful planning as well as early identification and elimination 'of problems

The introduction of the Quality Control Plan is dependent upon the member of the Management Team fulfilling his duties conscientiously -every staff must not only know the system, but must practice and carry out This will result in a smooth operation and a satisfied to the Engineer and the Employer

Trang 4

Quality Manager

Construction Manager

Road Construction

Structure Construction Drainage Construction

Other items Construction

Project Manager

Lab Manager

Lab Quality supervision

Staf

2 Quality Organization

2.1 Quality Organization chart

Quality Organization chart

The Quality Control will be established independently of the other functions Decision made by the Quality Control Manager concerning appliance shall not be ignored or overridden by other sections

Quality audit is carried out during the execution of the project to ensure that the quality effectively meet the construction specifications and contractual requirement

The Quality Control shall be related to the planning, management, implementing and evaluating quality for the construction of project

2.1 Tasks for Each Organization and Personnel

Project Manager

Trang 5

The Project Manager is responsible for execution of the project and to ensure that the quality system is carried out at site He shall ensure that the right resources are allocated to the project

Quality Control Manager

The Quality Control Manager is the authority on all quality matters about the project He is to provide the authority and necessary assistance to solve quality problem

The Quality Control Manager is responsible for compliance with the requirements

of the Contract, approved drawings for the areas of site works in his control and for the quality of workmanship For the Bidder, he is the authority to lead, instruct, supervise and direct the execution of the works under his control and he will interface with the Engineer on all questions regarding organization of quality system and control including the establishment of quality assurance and control procedure

The Quality Control Manager's responsible works are followings

• The Quality Control Manager is responsible for the proper implementation, management and organization of on-site Quality Control Plan with respect to the project and its requirements cooperating with Project Manager

• The Quality Control Manager shall lead, instruct advice and supervise the site staff in all matters relating to quality system / quality control

• The Quality Control Manager shall implement, control, revise and maintain complete inspection records for the project

• The Quality Control Manager shall insure that the site superintendent and site staff are informed of and receive copies of amendments and revisions to drawings, specifications and contract requirements

• The Quality Control Manager shall coordinate with the Project Manager, site staff on ways of resolving quality-related production problems

• The Quality Control Manager shall review incoming notification from the Engineer relating to quality control procedures and to suggest or approve remedial action

• The Quality Control Manager shall coordinate with the Engineer on the ways

of resolving quality-related procedure problems

• The Quality Control Manager shall review incoming notification from Engineer relating to quality control procedures and to suggest and implement revisions

• The Quality Control Manager shall review and approve submissions from suppliers and sub- Bidders relating to product/service quality

Trang 6

• The Quality Control Manager shall review and certify shop drawing, certificates and other data prior to submissions to the Engineer

The Quality Control Manager shall delegate such authority as deemed appropriate for the effective implementation of procedures and requirements to the

QC staff without, however, relieving him from his overall responsibility

Quality Control Staff

The Quality-Control Staff is the coordinator and supervisor of all matters relating

to compliance with contract drawings and specifications, codes and standards as applicable He is independent from the Site Engineer and the production team regarding any matters related to quality control / quality procedures He shall be reliable assistance to the Quality Control Manager and perform under QCM's direction and instruction

The Quality Control Staff's works are followings

• The Quality, Control Staff is responsible for the management and organization

of Quality Control Plan with respect to the project and its requirements

• The Quality Control Staff shall lead, instruct and supervise the development

of the detailed inspection system

• The Quality Control Staff shall establish, revise and material testing records for the project

• The Quality Control Staff shall insure that the Project Manager and all staff concerned are informed of and receive copies of amendments and revisions

to drawings, specifications and contract requirements

• The Quality Control Staff shall insure that internal and external laboratories and testing systems are selected and maintained as required by applicable regulations

• The Quality Control Staff shall review throughout the project cycle, the effectiveness of the inspection plan, procedures and documentation and to propose changes or amendments for optimization

• The Quality Control Staff shall coordinate with the Project Manager and site staff on ways of resolving quality-related procedure-problems

• The Quality Control Staff shall be delegated by such authority as deemed appropriate for the effective implementation of procedures and requirements This, however, shall not relieve him from his overall responsibility

Trang 7

Before construction

During the construction

After construction Project manager

QC division

SECTION

Construction quality control diagram

3 Bidder's Quality Control Plan

3.1 QC Coordination Meeting

Before start of construction, and prior to approval by the Engineer of the Quality Control Plan, the QC Coordination Meeting shall be performed as follow

The Bidder with his QC Engineer shall meet with the Engineer and discuss the Bidder's quality control system During the meeting, a mutual understanding of the system details shall be developed, including the forms for recording the QC operations, control activities, testing, administration of the system for both on-site and off-site work, and the interrelationship of Bidder's Management and control with the Engineer's Quality Assurance requirements Minutes of meeting shall be prepared by the Bidder's QC Engineer and be signed by the Bidder's QC Engineer, the Bidder's Project Manager, and the Engineer The minutes shall become a part of the Contract file There may be occasions when subsequent conference will be called by either party to reconfirm mutual understandings and/or address deficiencies in the QC system of procedures, which way require corrective action by the Bidder

3.2 QC Documentation

The QC Organization shall maintain current records of quality control operations, activities, and tests performed, including the work of SubBidders and suppliers These records shall be on a daily report from acceptable to the Engineer and shall include factual evidence that required quality control activities and/or tests have been performed, including but not limited to the following:

• Work performed each day, giving location, description, and by whom Type and number of control activities and tests involved

Trang 8

• Results of control activities or tests

• Deficiencies noted along with proposed remedial action of corrective action

• Control activities performed with results and references to specifications and/or Drawing requirements

3.3 QC Tests and Testing

3.3.1 Testing Procedures

Tests specified or required shall be performed to verify that control measures are adequate to provide a product that conforms to Contract and specification requirements Testing includes operation and/or acceptance tests when specified or required A list of test to be performed shall be furnished as a part of QC plan The list shall give the test name, frequency, specification paragraph containing the test requirements, the personnel and laboratory responsible for each type of test, and

an estimate of the number of tests required

3.3.2 Independent Testing Laboratory

The Independent Testing Laboratory shall be provided The Independent Testing Laboratory shall be noted in the Quality Control Plan, as well as necessary information and data to evaluate the laboratory's qualifications and proposed personnel to be assigned to the Works The Independent Testing Laboratory shall maintain and operate a laboratory on site during the duration of the construction activities of the Works to accomplish all on-site testing

The Independent Testing Laboratory shall be fully equipped with all necessary equipment and trained personnel to properly conduct all on-site testing in accordance with specified and appropriate materials testing procedures and shall meet appropriate criteria

In the Quality Control Plan, all on-site testing by the Independent Testing Laboratory shall be noted, as well as any testing the Bidder propose to accomplished off-site by the laboratory or other laboratories

In the Quality Control Plan, a complete listing of the proposed on-site testing equipment and available off-site testing equipment of the Independent Test Laboratory shall be noted

The on-site Independent Testing Laboratory will be a part of the Construction Quality Control operation and will independently, but under the jurisdiction of the Quality Control Engineer

3.3.3 Site laboratory control

The Bidder is responsible for field control laboratory The specific work are as follows:

• Control the time to re-calibration the testing equipment

Trang 9

Submission of material resources

Taking and testing sample

Putting into use of construction

Taking and testing sample

As required

Checking material resources

Fall App

Fall App

Fall App

Fall App

SECTION

• Control the testing Engineer & Technical

• Control the testing procedure based on the testing standard

• Control the status of the testing machine

3.3.4 Quality control of material input

Trang 10

Quality control of material input sequence

3.3.5 Sampling

A material sampling schedule noting time and frequency of testing and sampling

of all materials shall be fully detailed in the Quality Control Plan

Any material that appears defective or inconsistent with similar material being produced shall be sampled, unless such material is voluntarily removed and replaced or corrected

Sampling procedure:

• A material sampling schedule shall be informed to the Engineer by Inspection request before 24 hours

• Sampling procedure shall be complied with current TCVN standard under the supervision of the Engineer

3.3.6 Transmittal of Test Report

The testing laboratory shall furnish three copies of test results The Bidder shall submit to the Engineer 01 copy by official letter within 3 days after finish the test

3.3.7 Inspection and Testing

Inspection testing is divided into two categories: (1) job site inspection and testing and (2) off-site inspection and testing

3.3.8 Manufacture's Certification

Manufacturer certification will be furnished on items of materials and equipment

to the satisfaction of the Engineer

All certification shall be originals The original of manufacturers or independent laboratory certifications shall name the appropriate item of equipment and material, specifications, standards or other document specified as controlling the quality of that item and shall have attached thereto certified copies of test reports upon which the certifications are based

3.3.9 Off-site Testing and Inspection

Off-site or factory inspection shall be the inspection at the point of manufacture

or production of the various products or materials which are shipped to the Sites Appropriate written notice shall be submitted to the Engineer not less than 28 days before off-site inspection services, and shall be provided for the producer, manufacturer, and fabricator to furnish safe access and proper facilities and to cooperate with the inspecting personnel in the performance of their duties

3.3.10 Certified Laboratory Tests

Laboratory tests may be certified test made by approved testing agencies on materials and equipment that will be incorporated into the Works under the