2.3 STRUCTURAL WORKS METHOD FORMWORK PLAN1... CONSTRUCTION METHODOLYGY FOR STRUCTURE WORK 2.3 STRUCTURAL WORKS METHOD COLUMN & COREWALL: CONVENTIONAL FORMWORK FORMWORK APPLICATION FOR NO
Trang 1GENERAL METHOD STATEMENT
PACKAGE :
COFICO Copyright © 2017
Trang 2BAY
WATER
SUNWAH PEARL
BUILDING A BETTER FUTURE
1 P R O J E C T I N F O R M A T I O N
2 O R G A N I Z A T I O N A L C H A R T
3 C O N S T R U C T I O N S I T E P L A N
4 H E A V Y E Q U I P M E N T P L A N
5 C O N S T R U C T I O N M E T H O D S T A T E M E N T
6 C O N S T R U C T I O N P R O G R A M M E
7 H S E M A N A G E M E N T P L A N
Trang 32.3 STRUCTURAL WORKS METHOD FORMWORK PLAN
1 NON – TYPICAL FLOOR
[GROUND FLOOR UP TO L1 FLOOR & ROOF FLOOR]
COLUMN & WALL : CONVENTIONAL FORMWORK
BEAM & SLAB : CONVENTIONAL FORMWORK
STAIR : CONVENTIONAL FORMWORK
2 TYPICAL FLOOR
[TOWER 1: L2 FLOOR UP TO L13 FLOOR]
[TOWER 2: L2 FLOOR UP TO L15 FLOOR]
COLUMN & WALL : ALUMINUM FORMWORK
BEAM & SLAB : CONVENTIONAL FORMWORK
STAIR : CONVENTIONAL FORMWORK
COFICO Copyright © 2017
Trang 4BUILDING A BETTER FUTURE
SUNWAH PEARL
4
2 CONSTRUCTION METHODOLYGY FOR STRUCTURE WORK
2.3 STRUCTURAL WORKS METHOD
COLUMN & COREWALL: CONVENTIONAL FORMWORK
FORMWORK APPLICATION FOR NON - TYPICAL
FLOORS
CONVENTIONAL FORMWORK FOR COLUMN CONVENTIONAL FORMWORK FOR COLUMN
Trang 52.3 STRUCTURAL WORKS METHOD
BEAM & SLAB: CONVENTIONAL FORMWORK
FORMWORK APPLICATION FOR NON - TYPICAL
FLOORS
CONVENTIONAL FORMWORK FOR BEAM & SLAB
CONVENTIONAL FORMWORK FOR BEAM & SLAB
COFICO Copyright © 2017
Trang 6BUILDING A BETTER FUTURE
SUNWAH PEARL
6
2 CONSTRUCTION METHODOLYGY FOR STRUCTURE WORK
2.3 STRUCTURAL WORKS METHOD
COLUMN and COREWALL: ALUMINUM FORMWORK SYSTEM
FORMWORK APPLICATION FOR TYPICAL
FLOORS
AL-FORM FOR COLUMN & WALL
AL-FORM FOR COLUMN & WALL
Trang 72.3 STRUCTURAL WORKS METHOD
BEAM & SLAB: CONVENTIONAL FORMWORK
FORMWORK APPLICATION FOR TYPICAL
FLOORS
CONVENTIONAL FORM FOR BEAM & SLAB
CONVENTIONAL FORM FOR BEAM & SLAB
COFICO Copyright © 2017
Trang 8BUILDING A BETTER FUTURE
SUNWAH PEARL
8
2 CONSTRUCTION METHODOLYGY FOR STRUCTURE WORK
2.3 STRUCTURAL WORKS METHOD
STAIRCASE: CONVENTIONAL FORMWORK
FORMWORK APPLICATION FOR TYPICAL
FLOORS
CONVENTIONAL FORM FOR STAIR
CONVENTIONAL FORM FOR STAIR
Trang 92.3 STRUCTURAL WORKS METHOD TYPICAL FLOOR CYCLE (9 DAYS/ CYCLE) H =
3.65m
A Overall Work Sequence For Typical Floor
1 Survey
2 Column Rebar
3 Column Form
4 MEP Embedment
5 Inspection
6 Slab Form
7 Survey for Slab End Line
8 Slab Rebar
9 MEP Embedment
10 Inspection
11 Pour Concrete Column And Slab
B Overall Work Sequence For Non-Typical Floor
1 Survey
2 Column Rebar
3 Column Form
4 MEP Embedment
5 Inspection
6 Pour Column Concrete
7 Slab Form
8 Survey for Slab End Line
9 Slab Rebar
10 MEP Embedment
11 Inspection
12 Pour Slab Concrete
COFICO Copyright © 2017
Trang 10BUILDING A BETTER FUTURE
SUNWAH PEARL
10
2 CONSTRUCTION METHODOLYGY FOR STRUCTURE WORK
2.4 SAFETY PROTECTION EXTERNAL SCAFFOLDING
SECTION VIEW
Trang 112.4 SAFETY PROTECTION
SAFETY RAILING
SAFETY FACLITIES
SAFETY ROAD
OPENING PROTECTION PERIMETER SAFETY RAILING
EQUIPMENT, PLAN INSPECTION BROAD
SAFETY RAILING
COFICO Copyright © 2017