5.1.5 BIỆN PHÁP CỐP PHA GIẢI PHÁP CỐP PHA CHO CÔNG TRÌNH1... MÓNG: CỐP PHA VÁN... 2 CỘT, VÁCH: CỐP PHA VÁN LÕI THANG: CỐP PHA VÁN... DẦM CHUYỂN: CỐP PHA VÁN MẶT BẰNG DẦM CHUYỂN MẶT BẰNG
Trang 15.1.5 BIỆN PHÁP CỐP PHA GIẢI PHÁP CỐP PHA CHO CÔNG TRÌNH
1 TẦNG HẦM / KHỐI ĐẾ / TẦNG KHÔNG ĐIỂN HÌNH
2 TẦNG ĐIỂN HÌNH
VÁCH VÀ LÕI THANG : CỐP PHA NHÔM
TẦNG KHÔNG ĐIỂN HÌNH (Tầng Tum ~ Tầng Mái)
(T1 ~ T5) TẦNG HẦM
TẦNG KHÔNG ĐIỂN HÌNH
(T26 ~ Mái)
TẦNG ĐIỂN HÌNH (T6 ~ T29)
THÁP A1.1
THÁP A1.2
THÁP A1.4
THÁP A1.3
TẦNG KHÔNG ĐIỂN HÌNH (Tầng Tum ~ Tầng Mái)
TẦNG ĐIỂN HÌNH (T6 ~ T30)
Trang 25.1.5 BIỆN PHÁP CỐP PHA GIẢI PHÁP CỐP PHA CHO TẦNG HẦM VÀ KHỐI ĐẾ GHI CHÚ:
CỘT: CỐP PHA VÁN
LÕI THANG: CỐP PHA VÁN CẦU THANG BỘ: CỐP PHA VÁN DẦM SÀN: CÔP PHA VÁN
4
MẶT BẰNG TẦNG HẦM
2
3
4 5
1 MÓNG: CỐP PHA VÁN
1
MẶT BẰNG KHỐI ĐẾ (T1 ~ T5)
2 1
1
Trang 3MÓNG: CỐP PHA VÁN
Trang 42
CỘT, VÁCH: CỐP PHA VÁN
LÕI THANG: CỐP PHA VÁN
Trang 54
DẦM, SÀN: CỐP PHA VÁN
CẦU THANG BỘ: CỐP PHA VÁN
Trang 6DẦM CHUYỂN: CỐP PHA VÁN
MẶT BẰNG DẦM CHUYỂN MẶT BẰNG GIÀN GIÁO CHỐNG DẦM CHUYỂN
MẶT CẮT GIÀN GIÁO CHỐNG DẦM CHUYỂN
MẶT BẰNG ĐỊNH VỊ
Trang 75.1.5 BIỆN PHÁP CỐP PHA GIẢI PHÁP CỐP PHA CHO TẦNG ĐIỂN HÌNH
3
KHU VỰC KHỐI ĐẾ
GHI CHÚ:
VÁCH: CỐP PHA NHÔM LÕI THANG: CỐP PHA NHÔM
CẦU THANG BỘ: CỐP PHA NHÔM DẦM, SÀN: CỐP PHA NHÔM
2
3 4
MẶT BẰNG TẦNG ĐIỂN HÌNH
1
1
2
4
THÁP A1.2
THÁP A1.1
THÁP A1.3
THÁP A1.4
Trang 81
VÁCH: CỐP PHA NHÔM
LÕI THANG: CỐP PHA NHÔM
Trang 9CẦU THANG BỘ: CỐP PHA NHÔM
Trang 10DẦM, SÀN: CỐP PHA NHÔM
Trang 115.1.7 HỆ BAO CHE AN TOÀN GIÀN GIÁO BAO CHE BÊN NGOÀI
MẶT CẮT HỆ BAO CHE
Trang 125.1.7 HỆ BAO CHE AN TOÀN CHI TIẾT HỆ BAO CHE AN TOÀN