PROP HEAD PHSupports the weight of E/B and Slab Panel which is reserved until Concrete is completely dry Remained until 3 Floors are completed 6.. MIDDLE BEAM MB Connected by Slab Panel

Trang 1

Kumkang Ind BLDG 1445-2 Seocho Dong, Seocho Ku, Seoul, Korea Tel: +82-2-3415-4104 Fax +82-2-3415-4165

http://www.kumkangind.com

Trang 2

K.Y.Hwang

CONTENTS

Trang 3

Scaffolding Time Line

Wooden Plank

Domestic Plywood

Exterior Form

Exterior Form

Steel Form

Steel G/F

Trang 4

1 K-AL FORM Outline

1 Spec : Aluminium A6061-T6

2 Product : Aluminium System Form

3 Composition

① Inner Wall Panel

② Slab Panel & Support

③ Slab Corner & Beam

④ In, Out Corner, Hunch

⑤ Accessory : Wall Tie, Round Pin, Wedge Pin

4 Normal Module

Wall Panel: 600mm x Wall Height(2,300 or 2,450) x 63.5thk

Slab Panel: 600mm x 1,200 x 63.5thk

5 Production

① Extruded Aluminum Form & Reinforced Aluminum Process & Welding

② Valid Area On Coating (KOTEC-701SN)

1.1 K-AL FORM Specification and Composition

Trang 5

1 WALL PANEL (Used with ROCKER]

1.2 List of names and usage

15.120 14.730 18.060 17.590 20.250 19.730 26.645 25.940 Weight (Kg)

15.040

300 x 2300 30230

18.480

400 x 2450 40245

20.730

450 x 2450 45245

27.300

600 x 2450 60245

15.440

300 x 2450 30245

400 x 2300

450 x 2300

600 x 2300

Width( ㎜ ) x Length( ㎜ )

20.200 45230

18.010 40230

26.590 60230

Name & Weight

Trang 7

5 PROP HEAD (PH)

Supports the weight of E/B and Slab Panel which is reserved until Concrete is completely dry (Remained until 3 Floors are completed)

6 MIDDLE BEAM (MB)

Connected by Slab Panel and Slab Panel and it is placed between P/H and P/H

7 END BEAM (EB)

Connected by Slab Panel and Slab Panel and it is placed between P/H and SC or P/H and Slab Panel

1.2 List of Names and Usage

Trang 8

8 JOINT BAR

Used to joint End Beam, Middle Beam and Prop Head

9 Special PROP HEAD

Used where Prop Head cannot be used which supports the Slab concrete until it is dry (Remained until 3 Floors are

Trang 9

2 AL FORM’s Features

1. Manufactured and used similar as to Euro-Form but

round-shaped for precision

2. Assemble Wall and Slab by Slab corner,

monolithically

3. Support is the Pre-Shoring System which

requires 1 set of Formwork;

Reserve shoring for 3 sets

4. To change the height of floor, extension form is available to

assemble with ease

5. Used with Rocker to straighten root ground to reduce labor

workers

Triangular Pin (Wedge Pin)

Round Pin (Φ16)

Trang 10

K-AL FORM SYSTEM

SLAB PANEL

SUPPORT

JOINT BAR SLAB CORNER

WALL PANEL

MIDDLE BEAM(MB) PROP HEAD

END BEAM(EB)

Assembling of materials

Trang 11

WALL PANEL+SLAB CORNER Assembly Order

Trang 12

WALL PANEL LAYOUT

Trang 13

BEAM PANEL LAYOUT

Trang 14

SLAB CORNER LAYOUT (SC)

Trang 15

SLAB PANEL LAYOUT

Trang 16

STAIR PANEL LAYOUT

Trang 17

WALL PANEL LAYOUT IN DETAIL

Wall Product Description Size Description Product Applied Area

W O (ROCKER PANEL) W600 RockerPanel Standard Wall(Attached Rocker)

N/A B (BEAM PANEL) B Width x Length Beam Panel Beam

W C (CUT PANEL) WC600 Section Panel Balcony or Low, High Elevated Area

W K (Condensation

Conden- sation Panel Condensation & Lower Part

W A (CHAMFER PANEL) WA600 Chamfer Panel Chamfer Part

W D (Waterproof Panel) WD600 Waterproof Balcony

W E (W E P) WE200x0000 W E P Wall End Part

W W (Wooden PANEL) WW600 WoodenPanel Conventional Slab (Wood) applied

Trang 18

Slab Product Upwards (Height) Description Product Details

Trang 19

Dis tance

N A M E

Ins cription Product Details Applied Areas

D

O N / A D600 StandardPanel Standard SLAB (Bedroom, Living room….)

D A DA600 Chamfer Applied to Water Stop Groove (Water Drip) except

balcony and fit to outer part

D B DB600 Stop Water Running Applied to Balcony or outer part

End Beam Panel (Including Angle)

Beam or Lower Layer (End Beam) Applied

D S DS600 SPCIAL SLAB PANEL Applied when hole is Different

D D DD600 SPECIAL SLAB PANEL

D T DT600 STEEL PANEL Steel Panel Applied

SLAB PANEL LAY OUT IN DETAIL

Trang 20

3 AL FORM SETUP AND DISMANTLE

1 INKING LINE (Draw Line)

☞ After checking level of slab floor, Inking line is started as architectural and section drawing

Trang 21

2 WALL FORM SETUP

☞ Every time before concreting Form oil is applied on panel

3 AL FORM SETUP AND DISMANTLE

Trang 22

3 BEAM PANEL SETUP

3 AL FORM SETUP AND DISMANTLE

Trang 23

4 STAIR AND ELEV-PIT SETUP

3 AL FORM SETUP AND DISMANTLE

Trang 24

5 SLAB FORM SETUP

3 AL FORM SETUP AND DISMANTLE

Trang 25

6 SLAB FORM COMPLETED

3 AL FORM SETUP AND DISMANTLE

▣ Heat Insulating Material Setup

Trang 26

7 FIXED ELECTRICITY AND EQUIPMENT AND SUPPLY

REINFORCING BAR

3 AL FORM SETUP AND DISMANTLE

Trang 27

9 CONCRETE QUALITY

3 AL FORM SETUP AND DISMANTLE

Trang 29

10 Working tools

3 AL FORM SETUP AND DISMANTLE

Panel puller

Function:

To strike out formwork panels

upon dismantling process

Trang 30

10 Working tools

3 AL FORM SETUP AND DISMANTLE

Poacher

Function:

To align and adjust holing

position for pin to be inserted between panels

Trang 31

10 Working tools

3 AL FORM SETUP AND DISMANTLE

PVC Sleeve (tie bar shield)

Function:

To protect tie bar (re-usable)

Trang 34

K-AL FORM SETUP AND REMAINED SUPPORT DRAWING

Trang 35

4.1 K-AL FORM & EURO FORM Comparison Chart

4 ADVANTAGES AND DISADVATAGES OF EURO FORM & AL FORM

Trang 36

SECTION EURO FORM AL FORM

DESCRIPTION Joint line of Plywood and Frame

Trang 37

Section AL FORM EURO FORM

CON’C Condition Working on concrete surface is much smaller Working on concrete surface is too much

(Coating is applied)

CON’C & AL FORM surface quality lowers

when oxidation occurs

2 CON’C Condition

4.2 The Description of Detail Items

Trang 38

Section EURO FORM AL FORM

Description 1 Falls off due to thin welding

2 Surface of Steel Form is slippery but crack occurs

Surface is slippery and less falling

Trang 39

EURO FORM AL FORM

Advantage

☞ Changeable Plywood available depending on floor ( Cost Reduction )

(TEGO P/W – Low Floor, Woodstock– High-rise BLDG.)

☞ Low heat transmission.

☞ Cheap Form oil.

☞ Form Oil applied less damage in structures after rain.

☞ Water prevention part handled at site

( Plywood available )

☞ Higher Durability

☞ Low concrete finishing work.(Form Oil is Necessary)

☞ High elasticity.

☞ Environment friendly and reusable.

☞ Number of used times is less limited in a single site ( 120-150 Times )

☞ Low bending when welding.

Disadvantage

☞ (Used Times at Site) Frame and Plywood shape

is changed after one time use (Low Durability)

☞ Hard to put together if frame is fallen off and bent.

(Low Elasticity)

☞ Wasted plywood occurs (Polluted Environment)

☞ Number of used times is limited in a single site.

(15Times)

☞ Waterproof cut surface of plywood needed

☞ Elasticity is low that in narrow area conventional filler is needed

☞ More cracks take place.

☞ When Water prevention part is broken exchange work is slower.

☞ High heat transmission.

(High temperature rise in summer)

☞ Expensive Form oil.

☞ Form Oil applied more damage in structure after rain.

☞ High priced raw material.

☞ Welded and Chamfered materials are harder to discompose at site.

☞ Especially in winter, the Al-form and concrete tend to fall lit bit.

4.3 OTHERS

Trang 40

K-AL FORM SYSTEM

5 SAMPLES OF SETUP (CONSTRUCTION PICTURES)

Trang 41

K-AL FORM SYSTEM

5.1 Setup picture of for each part (Material Name)

▣ Wall + Slab CORNER Setup(1) ▣ Wall + Slab Corner Setup(2)

▣ Bedroom Setup ▣ Balcony Setup

Trang 42

K-AL FORM SYSTEM

▣ Living Room + Balcony Setup (1) ▣ Living Room + Balcony Setup (2)

▣ Inner Elevator Pit Setup ▣ Slab Setup

Trang 43

K-AL FORM SYSTEM

▣ Stairs (1) ▣ Stairs (2)

▣ Stairs (3) ▣ Stairs (4)

Trang 44

K-AL FORM SYSTEM

▣ Dismantle of Wall Form (1) ▣ Dismantle of Wall Form (2)

▣ Dismantle of Wall Form (3) ▣ Dismantle of Wall Form (4)

Trang 45

K-AL FORM SYSTEM

5 AL-FORM JOBSITE (DAEWOO PROJECT IN LYBIA)

Trang 46

K-AL FORM SYSTEM

5 AL-FORM JOBSITE (ARC PROJECT IN LYBIA)

Trang 47

K-AL FORM SYSTEM

5 AL-FORM JOBSITE (ARC PROJECT IN LYBIA)

Trang 48

K-AL FORM SYSTEM

6 Pre-check of SITE MANAGEMENT

1 Check of Drawing

1) Confirmation of structure Drawing before delivery of materials (Within 50~60 Days Conformation)

2) After confirming structure drawing, it is sublated for structure drawing

3) Importance check list of Structure drawing

▣ Position of dew condensation & Width Size ▣ Entrance Door Height & Conform Door Opening

▣ Check of Extended Waterproof & Balcony ▣ Check if Architectural Drawing, Structural Drawing

correspond 4) IMPORTANCE check list OF AL FORM DRAWING

▣ Confirming Standard Detailed Section Drawing ▣ Confirming TIE Position & Quantity ▣ Check different part with Structural Drawing ▣ Confirming Input Range & Delivered Goods

2 Preparation

1) Delivery Schedule & Work Chart

2) When Assembling & Disassembling Al-form, aware of warnings and check points

3) Prepare AL FORM PLAN drawings (Final confirmed drawing)

4) Supplier & check A/S staffs’ contact number

5) Secure place for accessories (Tie, Pin…)

3 Additional Labor Plan

: Stair Team, WALL+ SLAB Team, Goods Lift Team, and ETC… Proper Staff Secure Plan

Trang 49

K-AL FORM SYSTEM

7 K-AL Form System Applied Effects & Management Check List

Applied Effects Management Check List

▣ Material Innovation

- Precise construction is available until the top floor

- Reduction of reconstruction & errors

- Used high class materials without any workers’ skills

▣ Cost deduction in overall construction

- Deduction on plastering costs of inner & stairs

- Deduction on Scrap & readjustment costs

▣ Reduction of construction period

- Deduction of disassemble time and lightweight

compared with Euro from.

- Disassemble of Slab Form with Support still used

- Overall deduction of construction period by finishing the

end of construction

▣ Improvement of Working Area

- K-Al Form is 100% reusable

- Clean site without Plywood, Timber, wood

- Very little dust due to reducing talcum

▣ Improvement of industry safety

- Safety management with clean site

- It is easy to ensure working area for working safety

▣ Improved labor workers

- More skilled labor workers

- Special workers not needed

▣ Every floor spread with Form Oil thoroughly (At least 3 floors)

Used after removal (Cement & Aluminum)

▣ Notice Strong Vibration, it occurs in air bubble during curing

▣ Check whether it inserts upper side pin (Causes defect

of Molding) ▣ Flatness by checking Slab Concrete (LEVEL) surface

▣ Check for bending of Long Span wall bending when installing the slab form

▣ Because of carelessness management, it occur in damaged materials

▣ Basement, Piloti, roof house not usable( By site) ▣ Specific instructions and work knowledge to all workers

Trang 50

Thank you!