Trang 2K.Y.Hwang
CONTENTS
Trang 3Scaffolding Time Line
Wooden Plank
Domestic Plywood
Exterior Form
Exterior Form
Steel Form
Steel G/F
Trang 41 K-AL FORM Outline
1 Spec : Aluminium A6061-T6
2 Product : Aluminium System Form
3 Composition
① Inner Wall Panel
② Slab Panel & Support
③ Slab Corner & Beam
④ In, Out Corner, Hunch
⑤ Accessory : Wall Tie, Round Pin, Wedge Pin
4 Normal Module
Wall Panel: 600mm x Wall Height(2,300 or 2,450) x 63.5thk
Slab Panel: 600mm x 1,200 x 63.5thk
5 Production
① Extruded Aluminum Form & Reinforced Aluminum Process & Welding
② Valid Area On Coating (KOTEC-701SN)
1.1 K-AL FORM Specification and Composition
Trang 51 WALL PANEL (Used with ROCKER]
1.2 List of names and usage
15.120 14.730 18.060 17.590 20.250 19.730 26.645 25.940 Weight (Kg)
15.040
300 x 2300 30230
18.480
400 x 2450 40245
20.730
450 x 2450 45245
27.300
600 x 2450 60245
15.440
300 x 2450 30245
400 x 2300
450 x 2300
600 x 2300
Width( ㎜ ) x Length( ㎜ )
20.200 45230
18.010 40230
26.590 60230
Name & Weight
Trang 75 PROP HEAD (PH)
Supports the weight of E/B and Slab Panel which is reserved until Concrete is completely dry (Remained until 3 Floors are completed)
6 MIDDLE BEAM (MB)
Connected by Slab Panel and Slab Panel and it is placed between P/H and P/H
7 END BEAM (EB)
Connected by Slab Panel and Slab Panel and it is placed between P/H and SC or P/H and Slab Panel
1.2 List of Names and Usage
Trang 88 JOINT BAR
Used to joint End Beam, Middle Beam and Prop Head
9 Special PROP HEAD
Used where Prop Head cannot be used which supports the Slab concrete until it is dry (Remained until 3 Floors are
Trang 92 AL FORM’s Features
1. Manufactured and used similar as to Euro-Form but
round-shaped for precision
2. Assemble Wall and Slab by Slab corner,
monolithically
3. Support is the Pre-Shoring System which
requires 1 set of Formwork;
Reserve shoring for 3 sets
4. To change the height of floor, extension form is available to
assemble with ease
5. Used with Rocker to straighten root ground to reduce labor
workers
Triangular Pin (Wedge Pin)
Round Pin (Φ16)
Trang 10K-AL FORM SYSTEM
SLAB PANEL
SUPPORT
JOINT BAR SLAB CORNER
WALL PANEL
MIDDLE BEAM(MB) PROP HEAD
END BEAM(EB)
Assembling of materials
Trang 11WALL PANEL+SLAB CORNER Assembly Order
Trang 12WALL PANEL LAYOUT
Trang 13BEAM PANEL LAYOUT
Trang 14SLAB CORNER LAYOUT (SC)
Trang 15SLAB PANEL LAYOUT
Trang 16STAIR PANEL LAYOUT
Trang 17WALL PANEL LAYOUT IN DETAIL
Wall Product Description Size Description Product Applied Area
W O (ROCKER PANEL) W600 RockerPanel Standard Wall(Attached Rocker)
N/A B (BEAM PANEL) B Width x Length Beam Panel Beam
W C (CUT PANEL) WC600 Section Panel Balcony or Low, High Elevated Area
W K (Condensation
Conden- sation Panel Condensation & Lower Part
W A (CHAMFER PANEL) WA600 Chamfer Panel Chamfer Part
W D (Waterproof Panel) WD600 Waterproof Balcony
W E (W E P) WE200x0000 W E P Wall End Part
W W (Wooden PANEL) WW600 WoodenPanel Conventional Slab (Wood) applied
Trang 18Slab Product Upwards (Height) Description Product Details
Trang 19Dis tance
N A M E
Ins cription Product Details Applied Areas
D
O N / A D600 StandardPanel Standard SLAB (Bedroom, Living room….)
D A DA600 Chamfer Applied to Water Stop Groove (Water Drip) except
balcony and fit to outer part
D B DB600 Stop Water Running Applied to Balcony or outer part
End Beam Panel (Including Angle)
Beam or Lower Layer (End Beam) Applied
D S DS600 SPCIAL SLAB PANEL Applied when hole is Different
D D DD600 SPECIAL SLAB PANEL
D T DT600 STEEL PANEL Steel Panel Applied
SLAB PANEL LAY OUT IN DETAIL
Trang 203 AL FORM SETUP AND DISMANTLE
1 INKING LINE (Draw Line)
☞ After checking level of slab floor, Inking line is started as architectural and section drawing
Trang 212 WALL FORM SETUP
☞ Every time before concreting Form oil is applied on panel
3 AL FORM SETUP AND DISMANTLE
Trang 223 BEAM PANEL SETUP
3 AL FORM SETUP AND DISMANTLE
Trang 234 STAIR AND ELEV-PIT SETUP
3 AL FORM SETUP AND DISMANTLE
Trang 245 SLAB FORM SETUP
3 AL FORM SETUP AND DISMANTLE
Trang 256 SLAB FORM COMPLETED
3 AL FORM SETUP AND DISMANTLE
▣ Heat Insulating Material Setup
Trang 267 FIXED ELECTRICITY AND EQUIPMENT AND SUPPLY
REINFORCING BAR
3 AL FORM SETUP AND DISMANTLE
Trang 279 CONCRETE QUALITY
3 AL FORM SETUP AND DISMANTLE
Trang 2910 Working tools
3 AL FORM SETUP AND DISMANTLE
Panel puller
Function:
To strike out formwork panels
upon dismantling process
Trang 3010 Working tools
3 AL FORM SETUP AND DISMANTLE
Poacher
Function:
To align and adjust holing
position for pin to be inserted between panels
Trang 3110 Working tools
3 AL FORM SETUP AND DISMANTLE
PVC Sleeve (tie bar shield)
Function:
To protect tie bar (re-usable)
Trang 34K-AL FORM SETUP AND REMAINED SUPPORT DRAWING
Trang 354.1 K-AL FORM & EURO FORM Comparison Chart
4 ADVANTAGES AND DISADVATAGES OF EURO FORM & AL FORM
Trang 36SECTION EURO FORM AL FORM
DESCRIPTION Joint line of Plywood and Frame
Trang 37Section AL FORM EURO FORM
CON’C Condition Working on concrete surface is much smaller Working on concrete surface is too much
(Coating is applied)
CON’C & AL FORM surface quality lowers
when oxidation occurs
2 CON’C Condition
4.2 The Description of Detail Items
Trang 38Section EURO FORM AL FORM
Description 1 Falls off due to thin welding
2 Surface of Steel Form is slippery but crack occurs
Surface is slippery and less falling
Trang 39EURO FORM AL FORM
Advantage
☞ Changeable Plywood available depending on floor ( Cost Reduction )
(TEGO P/W – Low Floor, Woodstock– High-rise BLDG.)
☞ Low heat transmission.
☞ Cheap Form oil.
☞ Form Oil applied less damage in structures after rain.
☞ Water prevention part handled at site
( Plywood available )
☞ Higher Durability
☞ Low concrete finishing work.(Form Oil is Necessary)
☞ High elasticity.
☞ Environment friendly and reusable.
☞ Number of used times is less limited in a single site ( 120-150 Times )
☞ Low bending when welding.
Disadvantage
☞ (Used Times at Site) Frame and Plywood shape
is changed after one time use (Low Durability)
☞ Hard to put together if frame is fallen off and bent.
(Low Elasticity)
☞ Wasted plywood occurs (Polluted Environment)
☞ Number of used times is limited in a single site.
(15Times)
☞ Waterproof cut surface of plywood needed
☞ Elasticity is low that in narrow area conventional filler is needed
☞ More cracks take place.
☞ When Water prevention part is broken exchange work is slower.
☞ High heat transmission.
(High temperature rise in summer)
☞ Expensive Form oil.
☞ Form Oil applied more damage in structure after rain.
☞ High priced raw material.
☞ Welded and Chamfered materials are harder to discompose at site.
☞ Especially in winter, the Al-form and concrete tend to fall lit bit.
4.3 OTHERS
Trang 40K-AL FORM SYSTEM
5 SAMPLES OF SETUP (CONSTRUCTION PICTURES)
Trang 41K-AL FORM SYSTEM
5.1 Setup picture of for each part (Material Name)
▣ Wall + Slab CORNER Setup(1) ▣ Wall + Slab Corner Setup(2)
▣ Bedroom Setup ▣ Balcony Setup
Trang 42K-AL FORM SYSTEM
▣ Living Room + Balcony Setup (1) ▣ Living Room + Balcony Setup (2)
▣ Inner Elevator Pit Setup ▣ Slab Setup
Trang 43K-AL FORM SYSTEM
▣ Stairs (1) ▣ Stairs (2)
▣ Stairs (3) ▣ Stairs (4)
Trang 44K-AL FORM SYSTEM
▣ Dismantle of Wall Form (1) ▣ Dismantle of Wall Form (2)
▣ Dismantle of Wall Form (3) ▣ Dismantle of Wall Form (4)
Trang 45K-AL FORM SYSTEM
5 AL-FORM JOBSITE (DAEWOO PROJECT IN LYBIA)
Trang 46K-AL FORM SYSTEM
5 AL-FORM JOBSITE (ARC PROJECT IN LYBIA)
Trang 47K-AL FORM SYSTEM
5 AL-FORM JOBSITE (ARC PROJECT IN LYBIA)
Trang 48K-AL FORM SYSTEM
6 Pre-check of SITE MANAGEMENT
1 Check of Drawing
1) Confirmation of structure Drawing before delivery of materials (Within 50~60 Days Conformation)
2) After confirming structure drawing, it is sublated for structure drawing
3) Importance check list of Structure drawing
▣ Position of dew condensation & Width Size ▣ Entrance Door Height & Conform Door Opening
▣ Check of Extended Waterproof & Balcony ▣ Check if Architectural Drawing, Structural Drawing
correspond 4) IMPORTANCE check list OF AL FORM DRAWING
▣ Confirming Standard Detailed Section Drawing ▣ Confirming TIE Position & Quantity ▣ Check different part with Structural Drawing ▣ Confirming Input Range & Delivered Goods
2 Preparation
1) Delivery Schedule & Work Chart
2) When Assembling & Disassembling Al-form, aware of warnings and check points
3) Prepare AL FORM PLAN drawings (Final confirmed drawing)
4) Supplier & check A/S staffs’ contact number
5) Secure place for accessories (Tie, Pin…)
3 Additional Labor Plan
: Stair Team, WALL+ SLAB Team, Goods Lift Team, and ETC… Proper Staff Secure Plan
Trang 49K-AL FORM SYSTEM
7 K-AL Form System Applied Effects & Management Check List
Applied Effects Management Check List
▣ Material Innovation
- Precise construction is available until the top floor
- Reduction of reconstruction & errors
- Used high class materials without any workers’ skills
▣ Cost deduction in overall construction
- Deduction on plastering costs of inner & stairs
- Deduction on Scrap & readjustment costs
▣ Reduction of construction period
- Deduction of disassemble time and lightweight
compared with Euro from.
- Disassemble of Slab Form with Support still used
- Overall deduction of construction period by finishing the
end of construction
▣ Improvement of Working Area
- K-Al Form is 100% reusable
- Clean site without Plywood, Timber, wood
- Very little dust due to reducing talcum
▣ Improvement of industry safety
- Safety management with clean site
- It is easy to ensure working area for working safety
▣ Improved labor workers
- More skilled labor workers
- Special workers not needed
▣ Every floor spread with Form Oil thoroughly (At least 3 floors)
Used after removal (Cement & Aluminum)
▣ Notice Strong Vibration, it occurs in air bubble during curing
▣ Check whether it inserts upper side pin (Causes defect
of Molding) ▣ Flatness by checking Slab Concrete (LEVEL) surface
▣ Check for bending of Long Span wall bending when installing the slab form
▣ Because of carelessness management, it occur in damaged materials
▣ Basement, Piloti, roof house not usable( By site) ▣ Specific instructions and work knowledge to all workers