1. Trang chủ
  2. » Giáo Dục - Đào Tạo

HA south site visit 20170210 r00

25 30 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 25
Dung lượng 40,79 MB

Các công cụ chuyển đổi và chỉnh sửa cho tài liệu này

Nội dung

1 | PROJECT INTRODUCTION LOCATION MAP MAJOR PACKAGES IN PHASE 1 TENDER -Package 1 - Welcome Boulevard -Package 2 - 5 Star New World Hotel, All-Suite Hotel and Casino Complex - Package 3

Trang 1

1 | PROJECT INTRODUCTION

LOCATION MAP

MAJOR PACKAGES IN PHASE 1 TENDER

-Package 1 - Welcome Boulevard

-Package 2 - 5 Star New World Hotel, All-Suite Hotel and Casino Complex

- Package 3 - Condo Hotel

-Lagoon

Hoi An South Development Phase 1, Tay Son Tay Hamlet, Duy Hai

Commune, Duy Xuyen District, Quang Nam Province, Vietnam

Trang 2

2 | PACKAGE 1 – Welcome Boulevard & Site Infrastructure

Trang 3

3 | PACKAGE 2 – 5 Star New World Hotel, All-Suite Hotel and Casino Complex

ALL SUITES HOTEL (ASH)

17 STOREYS

NEW WORLD HOTEL (NWH)

13 STOREYS

CASINO PODIUM

Trang 4

3 | PACKAGE 2 – 5 Star New World Hotel, All-Suite Hotel and Casino Complex

Trang 5

3 | PACKAGE 2 – 5 Star New World Hotel, All-Suite Hotel and Casino Complex

ALL SUITES HOTEL (ASH)

NEW WORLD HOTEL (NWH) L13 - FFL +66.10

ROOF - FFL +69.85

L17 - FFL +82.10 LOW ROOF - FFL +87.10 FFL +96.86

SOL +22.96

Trang 6

4 | PACKAGE 3 – Condo Hotel

Trang 7

4 | PACKAGE 3 – Condo Hotel

FFL +63.25

Trang 8

5 | LAGOON

- The purpose is to pump sand from existing Lagoon area to land filling area;

- The Lagoon area in the drawing is indicative only The depth of Lagoon is NOT YET fixed;

- Excavation of Lagoon is under separate contract

- The Scope of work in this Tender package is Slope protection only

Trang 9

1/ Soil Investigation Works

6 | WORKS UNDER PREVIOUS / SEPARATE CONTRACT

Trang 10

7 | TIME FOR COMPLETION OF THE WORKS

8 MONTHS | CRITICAL !!!

(INCLUDING TET HOLIDAYS)

TOTAL: 19.5 MONTHS

Trang 11

MASTER SITE PLAN

8 | SITE VISIT PHOTOS - 10 FEB 2017

Trang 12

TEMPORARY SITE OFFICE & EXISTING ROAD PATH

8 | SITE VISIT PHOTOS - 10 FEB 2017

Trang 13

EXISTING ROAD PATH

8 | SITE VISIT PHOTOS - 10 FEB 2017

Trang 14

EXISTING ROAD PATH

8 | SITE VISIT PHOTOS - 10 FEB 2017

Trang 15

PACKAGE 2 - 5 Star New World Hotel, All-Suite Hotel and Casino Complex

8 | SITE VISIT PHOTOS - 10 FEB 2017

Trang 16

PACKAGE 2 - 5 Star New World Hotel, All-Suite Hotel and Casino Complex

8 | SITE VISIT PHOTOS - 10 FEB 2017

Trang 17

PACKAGE 2 - 5 Star New World Hotel, All-Suite Hotel and Casino Complex

8 | SITE VISIT PHOTOS - 10 FEB 2017

Trang 18

PACKAGE 2 - 5 Star New World Hotel, All-Suite Hotel and Casino Complex

8 | SITE VISIT PHOTOS - 10 FEB 2017

SITE OFFICE

Trang 19

PACKAGE 3 - Condo Hotel

8 | SITE VISIT PHOTOS - 10 FEB 2017

SITE OFFICE

Trang 20

PACKAGE 3 - Condo Hotel

8 | SITE VISIT PHOTOS - 10 FEB 2017

SITE OFFICE

Trang 21

PACKAGE 3 - Condo Hotel

8 | SITE VISIT PHOTOS - 10 FEB 2017

SITE OFFICE

Trang 22

8 | SITE VISIT PHOTOS - 10 FEB 2017

SITE OFFICE

Trang 23

8 | SITE VISIT PHOTOS - 10 FEB 2017

Trang 24

WELCOME BOULEVARD AT PACKAGE 8

8 | SITE VISIT PHOTOS - 10 FEB 2017

Trang 25

PACKAGE 8 – SEWARAGE TREATMENT PLANT

8 | SITE VISIT PHOTOS - 10 FEB 2017

Ngày đăng: 03/11/2019, 08:24

w