Biện pháp thi công hoàn thiện Song ngữ Anh - Việt công trình 50 tầng
Trang 1SUNWAH PREAL Project
FINISHING PLAN
Trang 2GENERAL PLAN
1
Trang 31a MOTAR MIXING STATION
Trang 51b STORAGE &TRANSPORT
Trang 61c Man power
Trang 71d Schedule
Trang 81e Work quantity
Trang 91f company
Trang 102 EQUIPMENTS
Trang 112a Mixing machine
Trang 122b Motor pump
Trang 13type S16 Skid-Steer Loader
Rated operating capacity 680 kg Tipping load 1360 kg Max travel speed 10.5 km/h
Trang 143 TEMPORARY FACILITY
Trang 153a layout
GF temporary electricity layout
Trang 16GF temporary water supply layout
3a layout
Trang 173b temporary electricity materials
Trang 183b temporary water supply materials
Trang 194
Trang 204a structure handover to finishing
measurement check and defect repair
Trang 214a structure handover to finishing
Trang 224b layout
Trang 234c.materals
Trang 264d.survey
Trang 274e.Slurry &sample
Trang 284f.preparation
Trang 294g.process
Trang 304h.requirements
Trang 324i.curing&inspection
Trang 345