Relevant Clause Original Modified Reference: Appendix A of Addendum No.2 Item No.13, Description: Track bed - starter barViaduct, Elevated station and cut and cover tunnel The “Descripti
Trang 1Ben Thanh - Suoi Ti 5en Section (Line 1)
Contract Package 3: E&M, Rolling Stock, Trackwork, Maintenance
This Addendum No.2 shall be construed as an integral part of the Tender Documents
Volume 1
1
ITT Item A8.4 The first paragraph:
The Tenderer shall note that for his reference only in Annexure 6 there is a spread sheet that outlines the Vietnamese Regulations for Approval and Certification of Projects
The first paragraph: “The Tenderer shall note that for his reference only in Annexure 6 there is a spread sheet that outlines the Vietnamese Regulations for Approval and Certification of Projects.” shall be deleted
to those specified in the Employer’s Requirements,
2nd paragraph shall be revised as follows:
The Tenderer shall provide justification, in accordance with Clause 32.1 of the General Specifications, for any codes
or standards it proposes in its list as alternatives or additions to those specified in the Employer’s
Trang 2No Relevant Clause Original Modified
General Specifications Requirements, General Specifications
3
ITT Annexure 1 4 The Tenderer’s Technical Proposals shall cover:
4.3 plan, organization and methodology to approach maintenance of Railway System during the 5 years after the date of issue of the Taking Over Certification and additional maintenance supervision and/or works after the first 5 years if necessary;
4.6 plan, organization and methodology to approach knowledge/skill transfer for maintenance of Railway System during 5 years after commencement of revenue service;
4.3
<Add following sentence at the end of sub-clause 4.3> Since the Employer gives importance to actual experiences of the Contractor in the maintenance of railway system, the Tenderer is requested to clearly demonstrate the following issues:
- The maintenance experiences of the Tenderer for the following seven railway sub-systems, and/or
- The maintenance experiences of his subcontractors and their future involvements in the 5 year maintenance works (refer to the contents of Annexure 9), for the following seven railway sub-systems:
i) Signalling System ii) Telecommunication System iii) Rolling Stock
iv) Power Supply and Distribution System v) OCS
vi) Trackwork” and vii) AFC
The Commitment letters from the sub-contractors to the Tenderer on the above involvement shall be attached 4.6
<Add following sentence at the end of sub-clause 4.6> Since the Employer gives importance to actual experiences of the Contractor in the knowledge/skill
Trang 3No Relevant Clause Original Modified
transfer, the Tenderer is requested to clearly demonstrate the following issues:
- The experiences of the knowledge/skill transfer of the Tenderer for the following railway sub-systems, and/or
- The experiences of the knowledge/skill transfer of his subcontractors and their future involvement for the knowledge/skill transfer (refer to the contents of Annexure 9) in the 5 year maintenance works, for the following railway sub-systems
i) Signalling System ii) Telecommunication System iii) Rolling Stock
iv) Power Supply and Distribution System v) OCS
vi) Trackwork” and vii) AFC
The Commitment letters from the sub-contractors to the Tenderer on the above involvement shall be attached
4
ITT Annexure 6 Annexure 6 – VIETNAMESE PROCDURES FOR
APPROVAL AND CERTIFICATION OF PROJECTS
“Annexure 6 – VIETNAMESE PROCDURES FOR APPROVAL AND CERTIFICATION OF PROJECTS” shall
be deleted in its entirety
To the last line: “approval of the Employer.”
The full text from the 1st to the last line shall be read as follows:
“Sub-Clause 13.6: Daywork of General Conditions of Contract shall be deleted in its entirety.”
6 PCC Sub-Clause 14.2 Advance Payment Insert the wording “Additional Sub-Clause:” at the top of
Trang 4No Relevant Clause Original Modified
Where applicable, O&M Company will pay all of his staff’s salaries, travelling, subsistence and other related allowances
(The following sentences are added.)
In case any supplemental trainings initiated by the Contractor take place outside Ho Chi Minh City, relevant expenses including traveling, subsistence and other related allowances for the staff of O &M Company shall be borne by the Contractor
8
Volume 3
General Specifications
Item 32.4
32.4 Alternative or additional codes, standards and
specifications proposed by the Contractor shall be internationally recognized codes and shall be, or
be equivalent to
The full text shall be substituted with the following:
32.4 Alternative or additional codes, standards and
specifications proposed by the Contractor shall be internationally recognized codes and shall be, or
be equivalent to the same
9
ER APPENDIX 2D 1.1 Item No.4,
Description: Fixings for brackets and hangers for cable and pipe
The “Description” shall be revised as follows;
Fixings for brackets and hangers for cable and pipe Fixing for supporting structure for tunnel lighting Reference: Appendix A of Addendum No.2
Item No.9, Description: All cable recess, troughs, ducts, pipes and
trenches, either across track or parallel to track, in base slab and first stage concrete of the cut and cover tunnels
Including cable ducts and pipes rising from base slab up to a suitable termination point
The contents of “Remarks” shall be replaced with the following;
CP3 to provide the requirement, including size and location
CP1/CP2 and CP3 to co-ordinate and agree on size and location
CP3 to provide tunnel lighting and tunnel socket include
Trang 5No Relevant Clause Original Modified
Reference: Appendix A of Addendum No.2 Item No.13,
Description: Track bed - starter bar(Viaduct, Elevated
station and cut and cover tunnel)
The “Description” shall be revised as follows;
Track bed - starter bar(Viaduct, Elevated station, Underground station and cut and cover tunnel)
Reference: Appendix A of Addendum No.2 Item No.14,
Description: Track bed – concrete (Viaduct, Elevated
station and cut and cover tunnel)
The “Description” shall be revised as follows;
Track bed – concrete (Viaduct, Elevated station, Underground station and cut and cover tunnel)
Reference: Appendix A of Addendum No.2 (Not existing in the present Tender Documents) The following Item shall be added as new Item No 15;
Description Cast-in item into 1st Trackbed
Concrete Sockets for starter bars in concrete segments,
Starter bars connected to sockets,
Starter bars for 2nd Trackbed Design Size & location CP-3 and CP-1/CP-2
requirement, including size and location/arrangement CP-1/CP-2 and CP-3 to co-ordinate and agree on size
Trang 6No Relevant Clause Original Modified
and location/arrangement Reference: Appendix A of Addendum No.2
(Not existing in the present Tender Documents) The following Item shall be added as new Item No 16;
Description 1st Trackbed concrete (Bored
tunnels) Design Size & location CP-1
Reference: Appendix A of Addendum No.2 (Not existing in the present Tender Documents) The following Item shall be added as new Item No 18;
Description Track bed – Construction Joint
treatment (Viaducts, Bridges, Elevated/Underground stations
Trang 7No Relevant Clause Original Modified
and Tunnels) Design Size & location CP3 and CP1/CP2
Remarks CP3 to carry out construction
joint treatment where track bed will be placed
CP1/CP2 and CP3 to agree on the finishing of concrete surface where track bed will be placed
Reference: Appendix A of Addendum No.2 Item No.15, No.16 and No.17 The Item Numbers shall be revised as follows;
ER APPENDIX 2D 2.1 Item No.16,
Description: Cabling from isolators to all pump control panels Control and monitoring cabling from all pump control panels up to interface terminal boxes (ITBs)
The descriptions shall be revised as follows:
(Original) (Revised) Design Size & location CP-3 CP3 and CP1/CP2 Supply CP-3 CP1/CP2 Fix CP-3 CP1/CP2 Reference: Appendix A of Addendum No.2
Item No.18, Description: Earth Mat System
The contents of “Remarks” shall be replaced with the following;
Trang 8No Relevant Clause Original Modified
CP1/CP2 and CP3 to coordinate for the design and agree on size and location
CP1/CP2 to supply earth mats for station and depot CP3 to supply earth mats for substation
The descriptions shall be revised as follows:
(Original) (Revised) Supply CP-3 CP3 and CP1/CP2 Reference: Appendix A of Addendum No.2
(Not existing in the present Tender Documents) The following Item shall be added as new Item No 30;
Description Isolation / Insulation measures
for Platform Screen including insulating membrane beneath platform finish, insulation and surface seal between platform finish and platform screen doors (PSD), platform finish and end returns, , etc
Design Size & location CP-3
Remarks Surfaces of the End Return
Doors of the PSD to be insulated and coated with an insulating material by CP-3 Resistance tests between
Trang 9No Relevant Clause Original Modified
platform finish and earth by CP-3
CP-1, CP-2 to co-ordinate with CP-3 on the detail at the PSD and platform interface
Reference: Appendix A of Addendum No.2 (Not existing in the present Tender Documents) The following Item shall be added as new Item No 31;
Description Top and bottom fixings and
insulation at base of PSD Design Size & location CP-3
Remarks Along platform edge for the
entire length of the PSD Resistance tests between PSD and earth and between PSD and platform finish by CP-3 Reference: Appendix A of Addendum No.2
(Not existing in the present Tender Documents) The following Item shall be added as new Item No 32;
Description All fixings necessary to secure
PSD to the station structures Design Size & location CP-1&CP-2/CP-3
Remarks Along platform edge for the
entire length of the PSD
Trang 10No Relevant Clause Original Modified
CP-1/CP-2 and CP-3 shall ensure the structure can accommodate the fixing Reference: Appendix A of Addendum No.2
(Not existing in the present Tender Documents) The following Item shall be added as new Item No 33;
Description Touch voltage insulation
between PSD header and architectural panels such as cornice, false ceiling, etc Design Size & location CP-3
Description End returns (remote from the
PSD) and glass panels extended from the ends of the PSD
Design Size & location CP-3
Remarks CP-1/CP-2 to co-ordinate with
CP-3 about the interface requirements at the PSD, walls
Trang 11No Relevant Clause Original Modified
and end returns
Reference: Appendix A of Addendum No.2 (Not existing in the present Tender Documents) The following Item shall be added as new Item No 35;
Description Sealing of gap between CP-3
equipment, and wall and floor finishes
Design Size & location CP-3
Remarks Bedding or trims to be
designed, supplied and fixed
by CP-3 Sealing material shall maintain the fire rating of the compartment where applicable
Reference: Appendix A of Addendum No.2 (Not existing in the present Tender Documents) The following Item shall be added as new Item No 36;
Description The cabling from distributing
board in station electrical supply room to each illuminated sign
Design Size & location CP3 and CP1/CP2
Trang 12No Relevant Clause Original Modified
Remarks CP3 to provide requirements,
including size and location CP1/CP2 and CP3 to coordinate and agree on sizes and locations
Reference: Appendix A of Addendum No.2 (Not existing in the present Tender Documents) The following Item shall be added in the table as new Item
No 38;
Description Cable Installation and Routing
of Passenger Gates Design Size & location CP3 and CP1/CP2
Remarks CP3 to provide requirements,
including size and location CP1/CP2 and CP3 to coordinate and agree on sizes
Trang 13No Relevant Clause Original Modified
and locations
CP1/CP2 to provide floor opening for cable routing of passenger gates
CP1/CP2 to supply and fix Pipe/Sleeve for floor opening CP3 to supply and fix cable ducts / conduits / hangers / trays for routing all type of cables beneath passenger gates
CP3 to provide passenger gates and cabling
CP1/CP2 to cover floor opening and finish floor between passenger gates after cable installation work by CP3 Reference: Appendix A of Addendum No.2
k) JIS E 3801-1 Japan Radio Train Control
System-Part 1: General Requirements and Functional Requirements
2nd paragraph shall be revised as follows:
The DTS shall provide sufficient bandwidth to cater for the data loading required at the present implementation stage and shall provide an additional spare bandwidth of at least
Trang 14No Relevant Clause Original Modified
The underlined text shall be added at the end of Item 1) as follows:
110kV cable connection from receiving substations to HCM City Power Company (HCMCPC), including excavation, reclamation and all facilities to be carried out under Provisional Sum;
a) Contact wire height above top of rail on main line
Standard: 5,100mm (inside workshop: 5,500mm) Maximum: 5,800mm
Minimum: 4,400mm
Clause 1.3 (8) a) shall be revised as follows:
1.3 Basic Design (8) The following shall constitute the basis for the designs and equipment ratings:
a) Contact wire height above top of rail on main line Standard: 5,100mm (inside workshop: 5,500mm) Maximum: 5,600mm
2nd paragraph shall be revised as follows:
The door weight shall be kept to a practical minimum
Trang 16The Contractor shall include the following Design, Supply and Fix Items in his Detailed Interface Document:
1 Design, supply and fixing
of Rail system shall be the
sole responsibility of the
CP3 except where
otherwise specified in this
Table
CP3 CP3 CP3
2 Design, supply and fixing
of trackwork items shall be
the sole responsibility of
the CP3 except where
otherwise specified in this
Table
CP3 CP3 CP3
3 Cast-in sockets, cast-in
bolts or blind holes in
tunnels/viaducts for both
CP3 temporary and CP3
permanent services
CP3 to ensure that the
cast-in sockets, etc are
compatible with bracket
fixings, etc to ensure that
corrosion resulting from
dissimilar metals will be
prevented
CP3 and CP1/CP2
CP3 CP1/C
P2
CP3 to provide the requirements, including size and locations CP1/CP2 and CP3 to coordinate and agree size and locations Sockets shall be supplied by CP3 CP1/CP2 and CP3 to coordinate and agree that adequate construction tolerances are allowed between fixing and the mounting slots of the brackets
4 Fixings for brackets and
hangers for cable and
pipe
Fixing for supporting
structure for tunnel lighting
CP3 CP3 CP3 Bolts, anchors, nuts, washers,
packers, shims and the like shall
be supplied by CP3 CP3 to install above to cast-in sockets This arrangement shall also apply to trackside brackets to be installed along station trainways
5 Cable brackets and
hangers, and pipe brackets
attached to walkway
structure (if any)
CP3 CP3 CP3 Brackets, hangers etc shall be
supplied by CP3