tel: 0975.928956 email: ANPHU.CEC.jsc@gmail.comNHÀ 12 TẦNG tû lƯ - scale tkbvtc giai ®o¹n thiÕt kÕ - stage KHU ĐƠ THỊ VÀ THƯƠNG MẠI CƠNG TY TNHH ĐẦU TƯ XÂY BUSINESS AND URBAN AREA 12 FLO
Trang 108 - 2015 ECOBA VIETNAM JOINT STOCK COMPANY
Trang 2tel: 0975.928956 email: ANPHU.CEC.jsc@gmail.com
NHÀ 12 TẦNG
tû lƯ - scale
tkbvtc giai ®o¹n thiÕt kÕ - stage
KHU ĐƠ THỊ VÀ THƯƠNG MẠI CƠNG TY TNHH ĐẦU TƯ XÂY
BUSINESS AND URBAN AREA
12 FLOOR BUILDING PHU VINH INVESTMENT BUILDING INFRATRUCTURE CO,LTD
An nh©n-Phĩ doanh
KHÁCH SẠN 12 TẦNG
12 FLOOR HOTEL
lÇn ngµy x¸c nhËn 1
2 3 4
DỰNG HẠ TẦNG PHÚ VINH
CONTRACTOR
ECOBA VIETNAM JSC.,
where your trust stays
C¤NG T¸C CHUÈN BÞ:
BIƯN PH¸P X¢Y:
MéT Sè NGUY£N T¾C C¥ B¶N TRONG C¤NG T¸C X¢Y
PHÂN CHIA ĐỢT TRONG CÔNG TÁC XÂY
PHỐI CẢNH CÔNG TÁC TRÁT NGOÀI
PHỐI CẢNH CÔNG TÁC XÂY
PREPARATION:
method of masonry:
Basic principles in masonry:
Trang 3tel: 0975.928956 email: ANPHU.CEC.jsc@gmail.com
NHÀ 12 TẦNG
b¶n vÏ sè - drawing no
tû lƯ - scale
tkbvtc giai ®o¹n thiÕt kÕ - stage
KHU ĐƠ THỊ VÀ THƯƠNG MẠI CƠNG TY TNHH ĐẦU TƯ XÂY
BUSINESS AND URBAN AREA
12 FLOOR BUILDING PHU VINH INVESTMENT BUILDING INFRATRUCTURE CO,LTD
An nh©n-Phĩ doanh
KHÁCH SẠN 12 TẦNG
12 FLOOR HOTEL
lÇn ngµy x¸c nhËn 1
2 3 4
DỰNG HẠ TẦNG PHÚ VINH
CONTRACTOR
ECOBA VIETNAM JSC.,
where your trust stays
-1
-1
CẮT GẠCH 1/2
MẶT CẮT 1-1
CẮT GẠCH 1/2
MẶT BẰNG LỚP 1
CUT 1/2 BRICK
CUT 1/2 BRICK
LAYER 1
MẶT BẰNG LỚP 2 LAYER 2
HƯỚNG NHÌN DIRECTIO N OF VIEW
HƯỚNG NHÌN DIRECTIO N OF VIEW
GHI CHÚ:
NOTES:
Trang 4tel: 0975.928956 email: ANPHU.CEC.jsc@gmail.com
NHÀ 12 TẦNG
tû lƯ - scale
tkbvtc giai ®o¹n thiÕt kÕ - stage
KHU ĐƠ THỊ VÀ THƯƠNG MẠI CƠNG TY TNHH ĐẦU TƯ XÂY
BUSINESS AND URBAN AREA
12 FLOOR BUILDING PHU VINH INVESTMENT BUILDING INFRATRUCTURE CO,LTD
An nh©n-Phĩ doanh
KHÁCH SẠN 12 TẦNG
12 FLOOR HOTEL
lÇn ngµy x¸c nhËn 1
2 3 4
DỰNG HẠ TẦNG PHÚ VINH
CONTRACTOR
ECOBA VIETNAM JSC.,
where your trust stays
-1
-1
CHI TIẾT GÓC TƯỜNG (TƯỜNG DÀY 220) MẶT ĐỨNG CHI TIẾT BỎ MỎ TƯỜNG 220 TẠI GÓC MẶT ĐỨNG CHI TIẾT MỎ GẠCH CHỜ
CHI TIẾT PHỐI CẢNH TƯỜNG 220 CHI TIẾT MẶT ĐỨNG TƯỜNG CẮT GẠCH 1/2 MẶT CẮT 1-1 PERSPECTIVE DETAIL OF 220 WALL DETAIL FACADE OF WALL CUT BRICK 1/2 SECTION 1-1
DETAIL OF WALL CONER (220MM WALL) FACADE DETAIL OF 220MM WALL CORNER DETAIL OF FACDE
HƯỚNG NHÌN DIRECTIO N OF VIEW
HƯỚNG NHÌN DIRECTIO N OF VIEW
Trang 5tel: 0975.928956 email: ANPHU.CEC.jsc@gmail.com
NHÀ 12 TẦNG
b¶n vÏ sè - drawing no
tû lƯ - scale
tkbvtc giai ®o¹n thiÕt kÕ - stage
KHU ĐƠ THỊ VÀ THƯƠNG MẠI CƠNG TY TNHH ĐẦU TƯ XÂY
BUSINESS AND URBAN AREA
12 FLOOR BUILDING PHU VINH INVESTMENT BUILDING INFRATRUCTURE CO,LTD
An nh©n-Phĩ doanh
KHÁCH SẠN 12 TẦNG
12 FLOOR HOTEL
lÇn ngµy x¸c nhËn 1
2 3 4
DỰNG HẠ TẦNG PHÚ VINH
CONTRACTOR
ECOBA VIETNAM JSC.,
where your trust stays
DETAIL OF 110-220 WALL CORNER DETAIL OF 110-220 WALL CORNER DETAIL OF 110-220 WALL CORNER
FACADE
CẮT GẠCH 1/4 MẶT BẰNG HÀNG 6
CHI TIẾT GÓC TƯỜNG 220-110 CHI TIẾT GÓC TƯỜNG 220-110 CHI TIẾT GÓC TƯỜNG 220-110
HƯỚNG NHÌN
HƯỚN G NH ÌN
DIREC TION
OF VIEW
MẶT ĐỨNG
Trang 6CỐT SÀN THÔ
CỐT TRẦN HT
CEILING
CỐT TRẦN HT CEILING
CỐT TRẦN HT CEILING
CỐT SÀN THÔ
CỐT SÀN THÔ
tel: 0975.928956 email: ANPHU.CEC.jsc@gmail.com
NHÀ 12 TẦNG
tû lÖ - scale
tkbvtc giai ®o¹n thiÕt kÕ - stage
KHU ĐÔ THỊ VÀ THƯƠNG MẠI CÔNG TY TNHH ĐẦU TƯ XÂY
BUSINESS AND URBAN AREA
12 FLOOR BUILDING PHU VINH INVESTMENT BUILDING INFRATRUCTURE CO,LTD
An nh©n-Phó doanh
KHÁCH SẠN 12 TẦNG
12 FLOOR HOTEL
lÇn ngµy x¸c nhËn 1
2 3 4
DỰNG HẠ TẦNG PHÚ VINH
CONTRACTOR
ECOBA VIETNAM JSC.,
where your trust stays
Trang 7SÀN BÊTÔNG CONCRETE SLAB
CỐT TRẦN HT CEILING
CỘT(VÁCH) KẾT CẤU
COLUMN(WALL) RC
CỘT KẾT CẤU COLUMN RC
CỐT SÀN THÔ
CỐT SÀN THÔ
CỐT SÀN THÔ CAO ĐỘ TRÁT
tel: 0975.928956 email: ANPHU.CEC.jsc@gmail.com
NHÀ 12 TẦNG
b¶n vÏ sè - drawing no
tû lÖ - scale
tkbvtc giai ®o¹n thiÕt kÕ - stage
KHU ĐÔ THỊ VÀ THƯƠNG MẠI CÔNG TY TNHH ĐẦU TƯ XÂY
BUSINESS AND URBAN AREA
12 FLOOR BUILDING PHU VINH INVESTMENT BUILDING INFRATRUCTURE CO,LTD
An nh©n-Phó doanh
KHÁCH SẠN 12 TẦNG
12 FLOOR HOTEL
lÇn ngµy x¸c nhËn 1
2 3 4
DỰNG HẠ TẦNG PHÚ VINH
CONTRACTOR
ECOBA VIETNAM JSC.,