Place, date Re : mv “ “ at from to Sept,2002 Dear Sirs, I regret to inform you that on the 4th Sept,2002 , while loading round logs, four meters of bullwalk on the port side were damage
Trang 1Place, date
Re : mv “ “ at from to Sept,2002
Dear Sirs,
I regret to inform you that on the 4th Sept,2002 , while loading round logs, four meters of bullwalk on the port side were damaged because of two loads of logs fell into them The Stevedoring Company at is fully responsible for the
above-mentioned damage they said they would cover all the expenses connected with the repairs
Please arrange the repairs of the bullwalk before the ship’s departure from
If it proves impossible to repair them in such a short time, please arrange the supply the new material on the stevedores’ account
As you know, on leaving we have to comply with the safety rules and regulations
Yours faithfully
Master of
CC