Our Project Title On: Effect of work study & time study on production and quality... Objectives of project work:To implement of work study charts to obtain maximum utilization of the re
Trang 1Our Project Title On:
Effect of work study & time study on production
and quality
Southeast University
Trang 3Objectives of project work:
To implement of work study charts to obtain maximum utilization of the resources( Man, Machine & Materials) and to optimize workplace by changing The plant layout & workstation, using the process charts
Southeast University
Trang 4Role of industrial engineering department in apparel industry:
Importance of industrial engineering (IE) tools that can be used to improve upon the productivity of their factories and thus enhance the profits Very few companies have been operating with a full fledged industrial engineering department and even those which boast of as an industrial engineering department(IED) in their factories are not allowing freedom and scope to function to its full capabilities The role of IED is important for the garments industry for the following two reasons:
garments manufacturing industry.
Trang 5Garments manufacturing diagram:
Fabric from stores
Trang 6Topics covered during the project work:
• Plant layout & workstation design.
• work study & time study concepts on production and quality
Trang 7Workstation Design:
Workstation Design are described
below-1 Space requirements
2 Consideration of the space requirement for the movement of
material handling equipment
3 Easy access to safety stops in case of emergency
4 Easy access to machine for inspection and lubrication,
maintenance and repair
5 Space between one machine to another machine
6 Appropriate ventilation, lighting & safety
Southeast University
Trang 8Cutting Section
Trang 10Work Study
Measurement
What is work study?
Work study is mainly concerned with the examination of human work.
There are two parts of work study:
Trang 11• To eliminate wastage of time and labor.
• To reduce fatigue and boredom of work by avoiding unnecessary
movements.
• To find a best way of doing a job.
• To have more utilization of materials, machines and workers.
• To improve the design of work place layout.
• To standardize the method, obtained after conducting the motion
Trang 13Work Measurement Techniques
Time Study: Directly observing an operator.
Pre-Determined Motion Time Study System: Analyzing the motions
used to carry out the activity.
Analysis of Past Records: Using previous records/ Studies available
in the factory.
Southeast University
Trang 14To determine the time it should take
for a qualified worker to perform a
specific task using a specified method
by directly observing an operator.
Trang 15Time Study Sheet of IE Department: Southeast University
Trang 16Observed time X
1 Compute the basic time
Basic Time =
2 Compute the standard minute value
SMV = Basic Time + Allowance
Standard rating Observed rating
Trang 17GSD layout of IE:
Southeast University
Trang 18SL Operation Observed time Standard time
Trang 19SI Operator Process Observed time Rating Basic time Allowance time Standard time
Trang 20For this process operation is 2, but making time taking around 10 min seam joining uneven, seam, broken stitch, puckering needle hole and down grade quality etc defects are coming more which clearly indicate that garment piece handling by the operator are not proper, they need to trained how to handle the fabric or the proper method of stitching the garment
Trang 22 PDCA
Figure : The Shewhart Cycle is a fundamental idea for continuous process improvement.
Trang 23The benefits of TQM can be classified into the following two categories:
1 Customer satisfaction oriented benefits.
2 Economic improvements oriented benefits.
1 Customer satisfaction oriented benefits: The benefits under this category are listed below:
(a) Improvement in product quality.
(b) Improvement in product design.
(c) Improvement in production flow.
(d) Improvement in employee morale and quality consciousness.
(e) Improvement of product service.
(f) Improvement in market place acceptance.
2 Economic improvements oriented benefits: The benefits under this category are as follows:
(a) Reductions in operating costs.
(b) Reductions in operating losses.
(c) Reductions in field service costs.
Trang 24Process Name = Side Seam
Observed Time = 35.27 Sec
Trang 25Some suggestions:
Trang 26 Operation are not
Material movement is minimized
Material handling is minimized
Trang 27APPAREL MANUFACTURING, THE EFFECTIVE UTILIZATION OF
RESOURCES ( MAN, MATERIAL & MACHINES) CAN BE
ACHIEVED
MINIMUM AND A SOLUTION CAN BE DERIVED IN A SHORT
PERIOD OF TIME
Southeast University
Trang 28EVERYBODY