Our Project Title On: Effect of work study & time study on production and quality... Objectives of project work:To implement of work study charts to obtain maximum utilization of the re

Trang 1

Our Project Title On:

Effect of work study & time study on production

and quality

Southeast University

Trang 3

Objectives of project work:

To implement of work study charts to obtain maximum utilization of the resources( Man, Machine & Materials) and to optimize workplace by changing The plant layout & workstation, using the process charts

Southeast University

Trang 4

Role of industrial engineering department in apparel industry:

Importance of industrial engineering (IE) tools that can be used to improve upon the productivity of their factories and thus enhance the profits Very few companies have been operating with a full fledged industrial engineering department and even those which boast of as an industrial engineering department(IED) in their factories are not allowing freedom and scope to function to its full capabilities The role of IED is important for the garments industry for the following two reasons:

garments manufacturing industry.

Trang 5

Garments manufacturing diagram:

Fabric from stores

Trang 6

Topics covered during the project work:

• Plant layout & workstation design.

• work study & time study concepts on production and quality

Trang 7

Workstation Design:

Workstation Design are described

below-1 Space requirements

2 Consideration of the space requirement for the movement of

material handling equipment

3 Easy access to safety stops in case of emergency

4 Easy access to machine for inspection and lubrication,

maintenance and repair

5 Space between one machine to another machine

6 Appropriate ventilation, lighting & safety

Southeast University

Trang 8

Cutting Section

Trang 10

Work Study

Measurement

What is work study?

Work study is mainly concerned with the examination of human work.

There are two parts of work study:

Trang 11

• To eliminate wastage of time and labor.

• To reduce fatigue and boredom of work by avoiding unnecessary

movements.

• To find a best way of doing a job.

• To have more utilization of materials, machines and workers.

• To improve the design of work place layout.

• To standardize the method, obtained after conducting the motion

Trang 13

Work Measurement Techniques

Time Study: Directly observing an operator.

Pre-Determined Motion Time Study System: Analyzing the motions

used to carry out the activity.

Analysis of Past Records: Using previous records/ Studies available

in the factory.

Southeast University

Trang 14

To determine the time it should take

for a qualified worker to perform a

specific task using a specified method

by directly observing an operator.

Trang 15

Time Study Sheet of IE Department: Southeast University

Trang 16

Observed time X

1 Compute the basic time

Basic Time =

2 Compute the standard minute value

SMV = Basic Time + Allowance

Standard rating Observed rating

Trang 17

GSD layout of IE:

Southeast University

Trang 18

SL Operation Observed time Standard time

Trang 19

SI Operator Process Observed time Rating Basic time Allowance time Standard time

Trang 20

For this process operation is 2, but making time taking around 10 min seam joining uneven, seam, broken stitch, puckering needle hole and down grade quality etc defects are coming more which clearly indicate that garment piece handling by the operator are not proper, they need to trained how to handle the fabric or the proper method of stitching the garment

Trang 22

 PDCA

Figure : The Shewhart Cycle is a fundamental idea for continuous process improvement.

Trang 23

The benefits of TQM can be classified into the following two categories:

1 Customer satisfaction oriented benefits.

2 Economic improvements oriented benefits.

1 Customer satisfaction oriented benefits: The benefits under this category are listed below:

(a) Improvement in product quality.

(b) Improvement in product design.

(c) Improvement in production flow.

(d) Improvement in employee morale and quality consciousness.

(e) Improvement of product service.

(f) Improvement in market place acceptance.

2 Economic improvements oriented benefits: The benefits under this category are as follows:

(a) Reductions in operating costs.

(b) Reductions in operating losses.

(c) Reductions in field service costs.

Trang 24

Process Name = Side Seam

Observed Time = 35.27 Sec

Trang 25

Some suggestions:

Trang 26

 Operation are not

 Material movement is minimized

 Material handling is minimized

Trang 27

APPAREL MANUFACTURING, THE EFFECTIVE UTILIZATION OF

RESOURCES ( MAN, MATERIAL & MACHINES) CAN BE

ACHIEVED

MINIMUM AND A SOLUTION CAN BE DERIVED IN A SHORT

PERIOD OF TIME

Southeast University

Trang 28

EVERYBODY

Ngày đăng: 06/08/2015, 13:08

TỪ KHÓA LIÊN QUAN

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w