Trang 1M ANAGEMENT S YSTEM AND
QCP-01
SHIMIZU CORPORATION
PACKAGE D CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
b) Each copy is issued to a particular person or organization If the
document is no longer required it should be returned to the relevant person;
c) It is not to be photocopied either in whole or in part Additional copies are available on request;
d) Copy holders will be automatically issued with any amendments
Responsibility for incorporating such amendments rests with the copy holder.
1 15 / 11/ 06
Trang 3PART 2 - QUALITY CONTROL PLAN PROCEDURES AND DOCUMENTATION 27
Trang 4TABLE OF CONTENTS (CONT’D)
2 FLOWCHART FOR DECREE NO 209/2004/ND-CP
3 TRANSLATED COPY OF DECREE NO 209/2004/ND-CP
4 TRANSLATED COPY OF DECREE NO 209/2004/ND-CP INSPECTION FORMS
5 DAILY SITE USED FORMS
6 MONTHLY SITE USED FORMS
7 FORMS USED AT CONSTRUCTION WORK COMPLETION STAGE
8 FORMS SUBMITTED AS PARTOF MONTHLY REPORT
9 PRELIMINARY INSPECTION AND TEST PLAN FOR MAJOR ELEMENTS OF THE
WORKS
10 PRELIMINARY INSPECTION AND TEST PLAN FOR OTHER ELEMENTS OF THE
WORKS
Trang 61 CONVEYANCE SEWER CONSTRUCTION
2 EXISTING COMBINED SEWER IMPROVEMENT
3 SECONDARY INTERCEPTOR SEWER CONSTRUCTION
The location of the Project is:
HO CHI MINH CITY - PEOPLE’S SOCIALIST REPUBLIC OF VIETNAM
The Employer is:
• GOVERNMENT OF THE SOCIALIST REPUBLIC OF VIETNAM PEOPLE’S
COMMITTEE OF HO CHI MINH CITY
• EAST-WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT
UNIT OF HO CHI MINH CITY;
The Engineer is:
• PACIFIC CONSULTANTS INTERNATIONAL (PCI) IN ASSOCIATION WITH
VIETNAM WATER, SANITATION, AND ENVIRONMENT CORPORATION(VIWASE) AND WATER AND SANITATION ENGINEERING CONSULTANT(WASE)
Notwithstanding the abovementioned, it should be further noted that other Civil Engineering Construction and Design works would be carried out in the region These, not in any particular order, include, but are not limited to the following:
HIGHWAY CONSTRUCTION
BRIDGE CONSTRUCTION
TUNNEL CONSTRUCTION
GENERAL INFRASTRUCTURE CONSTRUCTION
GENERAL SUPERSTRUCTURE CONSTRUCTION
Trang 7In the event of such undertaking of any of these Projects this document and the general principal of the application shall be implemented with the necessary revisions, where and if necessary, required.
The document is divided into two parts:
Part 1 MANAGEMENT SYSTEM
Part 2 QUALITY CONTROL PLAN (PROCEDURES AND DOCUMENTATION)
Part 1 of this document describes how the Management System is organized, defined and structured to ensure that the Project is operated and delivered in accordance with this document.
Part 2 of this document describes the practical implementation of the Management System through the Quality Control Plan It describes the appropriate procedure(s) and the necessary documentation
In addition to the Conditions of Contract that require compliance with ISO
9001, the Quality Control Plan shall comply with requirements of the Government Decree No 209/2004/ND-CP (on Quality Management of Construction Works).
By virtue of this document, Shimizu Corporation shall ensure the generic application of the provisions contained herein to ensure an efficient, effective Management System and Quality Control Plan that shall deliver a quality product to meet the Employer’s requirements.
Trang 8PART 1
Trang 91 OVERALL OBJECTIVE
1.1 Philosophy and Objective
“To Meet the Requirement of the Employer and Society”.
To the uninitiated, the term “Quality Assurance”, “Quality Control”,
“Test” and “Inspection” are often misunderstood Some contractors and craftsmen feel that these terms are directly related to wasted time and money Some believe that the sole intent of the Contractor’s Quality Control Organisation is to find something is incorrect in order to justify their existence This is far from the truth With an effective Management System and Quality Control Plan, rejections are minimized and as a result cost and time is saved The Employer’s acceptance is facilitated and assured to his requirements Defects and subsequent necessary remedies thereof are minimized.
This document is prepared to enable all the personnel of the Main Contractor to understand and be aware of their own duties to ensure that the works are accomplished in strict compliance with the requirements of the Contract, the requirements of ISO 9001 and the Government Decree No 209 where applicable The primary purpose of this document is to guarantee that the quality of materials and workmanship is continuously evaluated; to ensure that the finished product shall conform to the project specification and Contract drawings It shall include pre-construction and in- progress checking, testing and documentation as well as inspection
of the work being performed on Site
This document has been prepared in accordance with the ISO 9001: Quality Management Requirements, the Government Decree No.
209 on Quality Management of Construction Works in addition to the Main Contractor’s own Quality Policies and objectives.
The application of this document shall be in accordance with the requirements of the Contract.
Individual Skills
The Main Contractor will create opportunities for individual action at all levels of the project using the Main Contractor’s combined talents to ensure the projects’ overall success.
Teamwork
In order to develop mutual recognition and trust with all concerned the Main Contractor’s Management System and Quality Control Plan
Trang 10will promote willingness to assume responsibility for specific tasks and the project at large.
Communication
The Main Contractor’s principle is to create and encourage an open dialogue policy that will provide information flow Open communication will promote responsible decision making among employees.
• Satisfy the requirements of the Contract Specification;
• Are available at the required time;
• Developing the approach of recognising and preventing a problem before it occurs;
• Enforcing the policy that each person is responsible for the quality of his or her own work;
• Implementing quality control and assurance throughout the project by a written system of working procedures;
The Main Contractor’s Quality Control Procedures are implemented
to enforce a Quality Policy that is conducive to the requirements of the Contract and are based on the following principles:
• Site procedures that ensure all operations are planned to meet the Employers requirements;
• Formulating systems that identify requirements and that ensures an uninterrupted, accurate, updated flow of information, thus eliminating source of errors;
• The Main Contractor’s Managers and supervisory staff are responsible for issuing instructions and delegating work They
Trang 11also have the responsibility to ensure the execution of works in accordance with the applicable procedures;
• The Main Contractor’s Managers are responsible for ensuring personnel that are under their responsibility perform to the highest level of technical and professional standards;
• Adequate, sufficient and maintained quality control records to demonstrate compliance with the documented quality system and the Employers requirements;
1.5 Scope and Application
The scope of works covered by this document includes:
1.5.1Conveyance Sewer Construction and Existing Combined Sewer Improvement - Package D The main elements of the proposed Works to be completed by the Main Contractor are as follows:
Component Main Elements of Scope of Work
b) Construction of approximately 3 km of road works comprising 6 m wide inspection and maintenance road along the route of the sewer and a 7.5 m wide access road for inspection and
Trang 12Component Main Elements of Scope of Work
1.5.2Design and installation of temporary works The above components include, but are not necessarily limited to, the temporary works noted hereunder:
Component Major Temporary Works
C ONVEYANCE
S EWER
C ONSTRUCTION
• Temporary access road
• Temporary shoring system for excavation;
• Dewatering system during
Trang 13The Main Contractor’s Project Manager through the Site Manager and Area Manager(s) shall implement the Management System philosophy.
The Main Contractor shall appoint Internal Auditors within it’s organisation to carry out periodic audits aimed at ensuring that the works are being performed in accordance with the Management System and Quality Control Plan
The audits shall involve all departments and sections and their respective key personnel
3 RESPONSIBILITIES
3.1 Project Personnel
All project personnel are required to be familiar with the content of this document and to participate in the implementation of the management system Detailed responsibilities are elaborated further hereinafter.
All new staff and staff who are delegated new responsibilities will be provided with instructions relating to the requirements of this document and introduced to all relevant personnel by their immediate manager.
3.2 Management Representative
The Quality Control Manager is the Management Representative as required by sub-clause 5.5.2 of ISO 9001:2000
It is the Quality Control Managers mandate to ensure that:
(a) The contents of this document are disseminated to all key personnel;
(b) The contents of this document are updated and revised as necessary and the revisions thereof disseminated;
(c) Ensure that the objectives of this document are met;
(d) To ensure that audits are conducted and the results of the audit are acted upon in a positive pro-active manner;
3.3 Verification Personnel
Responsibilities for verifying the standard of materials and
Trang 143.4 Delegation in Absence
Personnel, when absent from the Project, are responsible for delegating their duties Delegation of duties in a formal written manner shall be provided.
3.5 Key Responsibilities
The following table sets out the management responsibilities for key functions associated with the implementation of the Management System The achievement of these function objectives shall be the collective responsibility of the management team.
AUTHORISED
REPRESENTATIVE
M R M M ORITA
• Report to Senior Management;
• Represent Shimizu Corporation to the Employer, Authorities and any other organisation that may require Shimizu Corporation’s representation;
• Overall responsibility for execution of the Project in accordance with the Contract Documents, budget, programme, quality, health and safety and environmental requirements;
PROJECT MANAGER
M R S S ATO
• Report to the Authorised Representative;
• Represent Shimizu Corporation to the Employer, Authorities and any other organisation that may require Shimizu Corporation’s representation;
• Overall responsibility for execution of the Project in accordance with the Contract Documents, budget, programme, quality, health and safety and environmental requirements Ensure establishment and implementation of the Management System
Trang 15Management System and Quality Control Plan;
• Ensure the appropriate documentation is maintained by the Construction Team;
• Guide the Construction Team through the Management System and Quality Control Plan;
• Be conversant with all other Management Documentation and contents;
• Review Method Statements and documents that require submission and approval;
• Responsible for planning and execution of the works within his jurisdiction;
• Responsible for execution of the Project in accordance with the Contract Documents, budget, programme, quality, health and safetyand environmental requirements;
• Direct and Manage the Area Manager(s) andother Site Engineers;
• Assist the Project Manager in the equipment, plant and material logistics plan;
• Monitor and report on works progress compared with the Clause 14 Programme;
• Approving Sub-contractor’s work done for payment purposes;
Trang 16Position Responsibility
QUALITY CONTROL
MANAGER
M R L D E O CAMPO
• Report to the Project Manager;
• Establish and maintain a Quality Control Plan in accordance with that of ISO 9001 and prevailing Government Decrees;
• Manage the Quality Department Staff;
• Ensure that the Quality Plan is disseminatedand implemented at all levels;
• Establish and maintain an audit program that facilitates both internal and external audits;
• Organise Quality inspections;
• Organise Quality awareness courses;
• Review non-conformance reports;
• Organise monthly Quality meetings with theEmployer and the Engineer;
• Preparing Monthly executive summary
SAFETY OFFICER
[TBC]
• Report to the Project Manager;
• Be conversant with and administration of allHealth, Safety and Environmental matters related to the Project in accordance with local rules and regulations as well as specific
Employer and the Engineer;
• Prepare a list of Personal Protective Equipment (PPE) and monitor the issuance thereof at Site;
• Establish and maintain a safety induction programme;
• Establish and manage safety and environmental inspections and audits;
Trang 17• Responsible for correct and effective Contract / Sub-Contract administration;
• Liaise with respective managers regarding any contractual disputes of any kind and involving any organisation;
• Responsible for Notification to any organisation regarding any such dispute and /
or claim;
• Preparation and timely submission of complete Monthly Statements, variations, Payment Certificates, Retention Sums and Final Statements;
• Prepare a monthly commercial / financial report;
• Preparation of claim documentation;
• Obtaining full recovery of contractual entitlements;
• Effective identification, response and control of contractual risks;
• Conversant with Contract, safety, quality and environmental documentation as well as local rules, regulations and legislation;
• Coordinate / manage all matters related to new staff with accounts section;
• Coordinate / manage all personnel related issues with respective department / sections;
Trang 18Position Responsibility
AREA MANAGER(S)
M R V U G IA K IM
[TBC]
• Report to the Site Manager;
• Responsible for planning and execution of all construction works within his jurisdiction;
• Conversant with Contract, safety, quality and environmental documentation as well as local rules, regulations and legislation;
• Manage and direct site supervisory staff and sub-contractors to ensure all construction works are to the approved drawings and relevant specifications;
• Implement the Quality Control Plan;
• Conversant with the Safety and Environmental Managements Plans;
• Preparation of Method Statements, Inspection and Test Plans and Risk and Hazard Analysis;
• Responsible for safe working practices within his zone of control;
• Active participation in daily site inspections
4 AUTHORITY MATRIX
The following pages (15 ~ 18 inclusive) illustrate Shimizu Corporation’s Management Authority Matrix which will be applied throughout the duration of the execution of the Works.
Trang 19P URCHASING AND S UB -C ONTRACTING
P ERSONNEL
Trang 20D ESIGN
Authorise design change (If
Authorise design principles (If
Authorise design submissions (If
C ONTRACT / C OMMERCIAL
Authorise variations to
Authorise variation submission to the
Trang 21Authorise monthly statements to the
Authorise claim notifications to the
P ERFORMANCE
Approve Inspection & Testing Plans Yes Yes Yes No No Yes No Yes
Trang 22Close Out Accident Investigation
Authorise Monthly Reports of any
Trang 235 COMPARISON WITH ISO 9001
The following table cross-references the system element requirements of ISO 9001 with the Management System and Quality Control Plan provisions contained herein This is intended to demonstrate the compliance of this document with the requirements of ISO 9001 : 2000.
Trang 24Management
System ISO 9001
Shimizu Corporation’s Management
Plan and Procedures ISO Reference Reference Objective / Statement
employees shall be inducted into theteam by the Project Manager and provided, if necessary, with a controlled copy of the Management System and Quality Control Plan
indicates the commitment of ShimizuCorporation towards Customer Satisfaction
complaints resulting in a Conformance are dealt with promptlyand closed out with the Employer’s consent
Non-5.3
Quality Policy
ManagementPlan
developed with an objective that is fully compatible for the Project and confirms Shimizu Corporation’s commitment to the same
also provides a mechanism for establishing and reviewing the objectives
prepared in comprehensible English that allows it to be concise and understood
the policy every six (6) months to ensure its continuous compatibility5.4
Trang 25Management
System ISO 9001
Shimizu Corporation’s Management
Plan and Procedures ISO Reference Reference Objective / Statement
employees shall be inducted into theteam by the Project Manager and provided, if necessary, with a controlled copy of the Management System and Quality Control Plan
indicates the commitment of ShimizuCorporation towards Customer Satisfaction
complaints resulting in a Conformance are dealt with promptlyand closed out with the Employer’s consent
Non-5.3
Quality Policy
ManagementPlan
developed with an objective that is fully compatible for the Project and confirms Shimizu Corporation’s commitment to the same
also provides a mechanism for establishing and reviewing the objectives
prepared in comprehensible English that allows it to be concise and understood
the policy every six (6) months to ensure its continuous compatibility5.4
Trang 26Management
System ISO 9001
Shimizu Corporation’s Management
Plan and Procedures ISO Reference Reference Objective / Statement
employees shall be inducted into theteam by the Project Manager and provided, if necessary, with a controlled copy of the Management System and Quality Control Plan
indicates the commitment of ShimizuCorporation towards Customer Satisfaction
complaints resulting in a Conformance are dealt with promptlyand closed out with the Employer’s consent
Non-5.3
Quality Policy
ManagementPlan
developed with an objective that is fully compatible for the Project and confirms Shimizu Corporation’s commitment to the same
also provides a mechanism for establishing and reviewing the objectives
prepared in comprehensible English that allows it to be concise and understood
the policy every six (6) months to ensure its continuous compatibility5.4
Trang 27Management
System ISO 9001
Shimizu Corporation’s Management
Plan and Procedures ISO Reference Reference Objective / Statement
employees shall be inducted into theteam by the Project Manager and provided, if necessary, with a controlled copy of the Management System and Quality Control Plan
indicates the commitment of ShimizuCorporation towards Customer Satisfaction
complaints resulting in a Conformance are dealt with promptlyand closed out with the Employer’s consent
Non-5.3
Quality Policy
ManagementPlan
developed with an objective that is fully compatible for the Project and confirms Shimizu Corporation’s commitment to the same
also provides a mechanism for establishing and reviewing the objectives
prepared in comprehensible English that allows it to be concise and understood
the policy every six (6) months to ensure its continuous compatibility5.4
Trang 28Management
System ISO 9001
Shimizu Corporation’s Management
Plan and Procedures ISO Reference Reference Objective / Statement
employees shall be inducted into theteam by the Project Manager and provided, if necessary, with a controlled copy of the Management System and Quality Control Plan
indicates the commitment of ShimizuCorporation towards Customer Satisfaction
complaints resulting in a Conformance are dealt with promptlyand closed out with the Employer’s consent
Non-5.3
Quality Policy
ManagementPlan
developed with an objective that is fully compatible for the Project and confirms Shimizu Corporation’s commitment to the same
also provides a mechanism for establishing and reviewing the objectives
prepared in comprehensible English that allows it to be concise and understood
the policy every six (6) months to ensure its continuous compatibility5.4
Trang 296 PLANNING AND REVIEW
Review of the Management system will be undertaken twice a year and
on the substantial completion of the works The Project Manager along with the Quality Control Manager shall attend the review The review meeting shall be minuted and recorded.
The review shall analyse the effectiveness of the management system in achieving the projects objectives and will also identify ways in which the Management System and / or Organisation structure can be improved The review meeting shall be chaired by the Quality Control Manager and will proceed in accordance with the following agenda:
• Time:
- Achievement of Main Construction Programme
- Forecast of the Main Construction Programme
• Cost:
- Budget / Cost comparison
- Final Cost Forecast
• Quality:
- Results and findings of audit report
(Note: Following the results of the review, the overall management plan and the relevant sections will be updated where considered necessary.)
Trang 30conformance is anticipated to take longer than 24 hours to rectify it is considered a Major Non-Conformance Report and shall be documented and actioned accordingly If it takes less than 24 hours to rectify then it
is considered as a Minor Non-Conformance.
• Defines the projects Organisation and responsibilities.
b) Quality Control Plan
• Defines the practical implementation of the Management System and Quality Control Plan, the appropriate procedures and the necessary documentation.
c) Management Procedures
• Supplements the Management System and Quality Control Plan
by defining detailed instructions on how specific processes are
to be implemented.
• Defines what records are to be maintained.
• Defines the principle parameters applied in the design process.
• In particular, for temporary works construction the design principles will form the basis for preparing Method Statements for execution of operations.
• Defines the method and stages of the relevant construction activity as well as the necessary safety precautions and quality procedures;
f) Inspection and Testing Procedures
• Defines the responsibilities, inspection and testing methods, frequencies, acceptance criteria and verification documentation.
Trang 31g) Conformance Reports / Check Sheets
• Provides the record for the inspection checks and tests on the works / materials as required in the Inspection and Testing Procedures.
• Provides certification that specific elements of the project satisfy the contractual requirements.
Where an improvement is identified, the respective personnel should advise the Quality Control Manager The improvement may be documented in any form
Trang 32PART 2
Trang 331 INTERNAL PROCEDURES MATRIX
Where no procedure is referred to the process is controlled as described
in the “Notes” column.
•
Chief Q.S
review of contract documents shall be conducted to determine any ambiguities that may require resolution 1.2
Variations
Procedure
No 2Contract Review and Variations
Includes identifying scope, pricing, review and submission to the Engineer and the Employer of all project
monitoring purposes The Clause 14
Programme and a 2
Trang 34Site Manager
he Contractual Construction Programmewill be updated every month
he present status of the Contractual ConstructionProgramme will be reported to the Engineer and the Employer If 2.3
Progress
Monitoring
Procedure No
3 Planning andScheduling
- Extensions of time
- Construction sequence changes
- Delays including 2.5
Trang 35Design
Verification
Procedure No
5 Design Management
Design
Changes
Procedure No
5 Design Management
•
Project Manager
he Chief Q.S is responsible for 3.4
Document
Control
Procedure No
1 Document ControlProcedure No
5 Design
•
Site Manager
•
Document controller
efines the process for ensuring the necessary appropriate review and approval of the project technical documents / drawings and defines the
•
Project Manager
accepted Design Principles
•
Project Manager
•
esign principles shall be established for all major and sensitive activities
Trang 36Project Manager
•
Project Manager
Traffic
Schemes
Procedure No
8Traffic Management
•
Project Manager
Relinquishmen
t of Site Area
•
Project Manager
4.7
Utilities
Procedure No
10Utility Management
•
Site Manager
•
Area Manager(s)
ordination with the 4.8
Environment
al
Procedure No
11EnvironmentalMonitoring
•
Project Manager
•
Area Manager(s)
•
Quality Control Manager
efines the process for calibration and
maintenance of all measuring and testing equipment used to verifythe works
Trang 37Project Manager
Relinquishmen
t of Site Area
•
Project Manager
•
Site Manager
•
Area Manager(s)
efines the process for thehandover and return of worksite areas or areas
of the completed structure to allow interface contractors (include sub-contractors,4.12
•
Project Manager
reparation of monthly statement and
•
Project Manager
package will be dependent upon the following:
- Quantum of package
- Value of package
Trang 38Project Manager
contractors based on:
- Experience of similarworks
- Assignment of capable equipment and personnel5.3
•
Project Manager
•
Project Manager
•
• Defines the procedure and documentation necessary to form a sub-5.5
Trang 39• Administrative Manager
• Chief Q.S
• Defines the process for the management of:
- Registration of equipment and vehicles
- Utilities registration and installation
- Logistic control of stock in all stores
- Import of materials, plant and equipment
- Attending to all localduties and taxation6.2
Public
Relations
Procedure No
15Administration
•
Project Manager
•
Site Manager
•
AdministrativeManager
• Defines the process for dealing with claims or issues from third parties
• Also defines the process for
communication with the Engineer and the
Employer with respect to6.3
•
Project Manager
• Defines the process for provision of contractual and legal obligations to maintain insurance cover and indemnity for:
- Plant & Equipment
- Motor Vehicles
- Fire
- Office Buildings
- Third Parties
- Contractors all risk
• Defines the process
of managing and administering any claims, including reports,
Trang 40substantial completion (or issuance of Taking-Over Certificate) of the project in a safe and
• Administrative Manager
efines the process for establishing project positions and
•
Site Manager
•
Area Manager(s)
•
efines the process for appraisal of performanceagainst project
objectives for position7.3
Training of
Personnel
See Notes •
Project Manager
•
Site Manager
•
Area Manager(s)
•
Administrative
ll employees shall be introduced and inducted into the Management System and Quality Control Plan by the Quality Control Manager
pecific project training shall be identified and 7.4
Insurance
and Taxation
Procedure No
15Administration
•
AdministrativeManager
Visa
Formalities
Procedure No
15Administration
•
AdministrativeManager
efines the process for obtaining work permits, visas, licences and relevant documentation