Trang 1C URRICULUM V ITAE (CV)
Position Title & No Environmental Specialist
Name of Expert Bui Nguyen Pho
Education:
Master`s Degree of Environmental Science and Sustainable Development - Viet Nam National University, 2012
Bachelor`s Degree of Environmental Science - Hanoi University of Science, 2008
Bachelor`s Degree of Mathematics and Physics - Hung Yen Teachers Training College, 2002
Certificate for Safety, Health and Environment (EHS) includes: ISO14001:2015, OHSAS18001,…
Training for Safety and Environmental protection: 2014, 2015, 2016
Training for presentation skills: 2010
Employment Record Relevant to the Assignment
Period Employing organization & title/position,
contact information for references
Country Summary of Activities performed
relevant to the Assignment
June 2015 -
Present
NKV (Nippon Koei Vietnam) - APAVE,
A2Z join venture
Environmental/ HSE Specialist
Vietnam
Environmental Specialist: Reviewing EIA, EMP, EPC report
Supervising environmental protection works
Review and Approve Environmental reports
Guide contractors to setup environment treatment items
Supervising the implementation of environmental monitoring during project construction
Identify safety hazards and propose preventive measures
March 2014
- June 2015
Oriental Consultants Co., Ltd - TEDI,
APECO, ITST joint venture
Environmental/ HSE Specialist
Vietnam
Environmental Specialist: Reviewing Environmental reports
Supervising environmental protection works
Guide contractors to setup environment protection items
Supervising the implementation of environmental monitoring during project implementation
July 2009 -
March 2014
Environmental Consultancy Center -
Transport Engineering Design Inc
Environmental specialist
Vietnam
Environmental specialist: Environmental condition survey and monitoring
Investigation and consultation Socio-Economic condition in the project area Establish, writing Environmental Impact Assessment (EIA), Environmental Management Plan (EMP) and EPC report June 2008 –
July 2009
Centre for Natural Resources and
Environmental Studies (CRES) - Viet Nam
National University
Environmental Reseacher
Vietnam
Environmental Reseacher: Survey, interview, collect documents
Writing some parts of Social Impact Assesment report
Membership in Professional Associations & Publications:
Viet Nam Association for Conservation of Nature and Environment (VACNE),
Vietnam Bridge and Road Association
Language Skills:
Adequacy for the Assignment
Trang 2Detailed Tasks Assigned on Consultant’s Team of Experts
Inspection of the works according to the Environmental Impact Assesment, Environmental Management Program, Regulations of Viet Nam and Other Organization such as: JICA, ADB, WORLD BANK;
Record the daily activities, Environment and Socio-Economic condition survey;
Communicate with the Client and contractor for environmental protection regulation during construction;
Coordinate with project owners to report to agencies and complete environmental procedures of projects;
Review and Approve Environmental reports of contractor;
Periodically patrol on Safety and environmental, Report the inspection result to the Resident Engineer, Clients;
Summarize the monthly accomplishment and report to Resident Engineer;
Writing Environmental reports (EIA, EMP, EPC…, monthly report, semi - monthly and annual… reports)
Work/ Assignments that Best Illustrates Capability to Handle the Assigned Tasks Reference to Prior
(1) Name of Assignment or project : Ca Pass Road Tunnel Construction Project- NH1A, Phu Yen and Khanh
Hoa Provinces in the form of BOT and BT
Year: June 2015 - present (17 months)
Location : Phu Yen and Khanh Hoa Provinces, Vietnam
Client : Deo Ca Investment Joint Stock Company/ Funded by BOT and BT
- Main project features: Total length of project is 13.4km; in which: Ca Pass tunnel length 3.9km Co Ma
tunnel length 0.5km and Approach road and bridges on route 9.0Km Tunnel: 02 single tubes (one way traffic
on each tube) at 30m distance Each tube has two lanes of 10.9m wide, covering 02 lanes of carriageway 2x3.5m + 2 safety strips + 1.0m + 2 service ways 2x1.18m Road: Embankment width Bn=24m Pavement width Bm=22.5m, including: 4 lanes carriageway x 3.75m + median strip width 1.5m + shoulder width 2x0.5m + emergency lane 2x2.5m Bridge deck: Bdeck = 24m and divided into two one-way sections Design speed: 80km/h
Position held : Environmental Specialist
Activities performed: Reviewing Environmental reports, Supervising environmental protection works
Review and Approve Environmental reports Coordinate with project owners to report agencies (monthly, semi-annual reports Guide contractors to setup environment treatment items, Supervising the implementation
of environmental monitoring during project implementation, Identify safety hazards and propose preventive measures…
- Communicate with the Client for environmental protection regulation during constrution
- Reviewing Environmental Impact Assessment, Environmental Management Plan reports of the project and Environmental reports of contractors Review and Approve Environmental reports of Contractors Supervising environmental protection works (including solid waste, hazardous waste, disposal, periodical environment monitoring ) and environmental protection compliance of contractors
- Recommended and guideline for contractors to implement measures to minimize the environmental impact
of the construction (the mitigation of environmental impacts such as noise, dust, vibration, water, soil )
- Guide contractors to setup environment treatment items (ventilation and dust filter in the tunnel, sewage disposal systems and wastewater treatment, sludge collection system, the storage areas for solid waste, household waste and hazardous waste) and monitoring the operation of items related to environmental
- Supervising the implementation of environmental monitoring during project implementation Coordinate with project owners to report agencies (monthly, semi-annual reports) and complete environmental procedures (water extraction permits, discharge permits, environmental periodic reporting ) in the construction process
- Identify safety hazards and environmental impacts and propose preventive measures Periodic Safety, Environmental and fire prevention Patrol in the construction process of the project, periodic EHS reports
(2) Name of Assignment or project: National Highway No 5 and Thanh Tri Bridge Interchange Project/ JICA
Year : March 2014 - June 2015 (16 months)
Location : Ha Noi, Vietnam
Client : Thang Long PMU - MOT/ Funded by JICA
Main project features: The project includes components: (i) Build up the ramps for going up and down at
the intersection between Thanh Tri Bridge and National highway No.5; (ii) Expanding the overpass of NH5 from 4 into 6 lanes; (iii) Implementing relocation of 2km of railway
Position held : Environmental Specialist
Trang 3 Activities performed: Reviewing Environmental reports, Supervising environmental protection works
Review and Approve Environmental reports Coordinate with project owners to report agencies (monthly, semi-annual reports) Guide contractors to setup environment treatment items, Supervising the implementation of environmental monitoring during project implementation, Identify safety hazards and propose measures to minimize unsafety issues
- Review environmental impact assessment report, environmental management plan of the project Supervise and inspect the environmental compliance of contractors Proposed solutions to minimize environmental pollution during construction; Supervising, monitoring the environmental condition in the construction stage
of the project
- Coordinate with project owners to report to agencies and complete environmental procedures during construction of the project Implement environmental procedures according to policy of environmental and safety of regulations
- Guide contractors to setup environment treatment items (wastewater treatment systems, sludge collection system, the storage areas for solid waste, household waste and hazardous waste) and monitoring the operation
of items related to environmental protection
- Recommended and guideline for contractors to implement measures to minimize the environmental impact
of the construction process (the mitigation of environmental impacts such as noise, dust, vibration, water, soil, traffic accidents )
- Responsible for weekly reporting to the project manager Cooperating with Japanese experts for site inspection
- Supervising sub-contractor on periodic environmental monitoring and propagation of HIV/AIDS prevention
- Identify risks and the impacts on the environment and propose measures to prevent, minimize with the aim to ensure safety and environmental protection in the construction process of the project
(3) Name of Assignment or project : National Highway No 1 Expansion Through Quang Ngai Province Project
Year: January 2014 – March 2014
Location: Quang Ngai Province , Vietnam
Client: Quang Ngai Department of Transportation
Main project features: Project will enhance the pavement of NH No.1 from Km1027+000 - Km1063 +877;
expand from Km1092 +000 - Km1110+000 and adjust from Km1110+000- Km1125 +000
Position held: Environmental Expert
Activities performed: Research, review and exalted additional pavement problems affect on the residential
areas along roadsides Studying problems of erosion, deposition in the horizontal position sewer lines Provide mitigation measures and reasonable compensation
(4) Name of Assignment or project: National Highway No.1 Expansion Through Ha Tinh Province
Year : December 2013
Location: Ha Tinh Province
Client: Ha Tinh Department of Transportation
Main project features: Expansion National Highway 1 Construction from Km517+950 – Km556+000
Position held : Environmental Expert
Activities performed: Establish EIA report
- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area
- Establish Environmental Impact Assessment (EIA) report
- Submit and complete the EIA report to the authority agencies
(5) Name of Assignment or project: Construction of Viaduct Section Mai Dich – South Thang Long /JICA
Year : October 2013 – December 2013
Location : Ha Noi
Client : PMU Thang Long/ Funded by JICA
Main project features: Total length of project is 6.1km, cross section B = 24m, Design speed: 120km/h
Position held : Environmental Expert
Activities performed : Investigate and study environmental and socio-economic condition in the residence
area of the Project Establish Social Impact Assessment (SIA) and Resettlement Action Plan (RAP) report
Trang 4(6) Name of Assignment or project: Viet Tri and Ninh Phuc Port Improvement - Northern Delta Transport
Development Project
Year: May 2013 – October 2013
Location: Phu Tho and Ninh Binh province
Client: Waterways PMU/ Funded by World Bank
Main project features : Strengthening the capacity to receive and transport in the port area of Viet Tri and
Ninh Phuc through Dredging of the port, upgrade infrastructure sector as wharves, warehouses construction,
roads to the port
Position held: Environmental Specialist
Activities performed: Supervise and inspect the environmental compliance of contractors
- Supervising and monitoring the environmental condition (dust PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey) in the construction stage of the project
- Submit and complete reports to the authority agencies
- Proposed solutions to minimize environmental pollution during construction
(7) Name of Assignment or project: Subproject component of NH39-1 rehabilitation, Trieu Duong – Hung Ha section (Km42+714 - Km64+000) and 3 bridges on alignment include Nai, Dong Tu and Go belong to Component C of Vietnam Road Asset Management Project
Year: May 2013
Location: Hung Yen, Thai Binh Provinces
Client: Project Management Unit 3, Ministry of Transport/ Funded by Asian Development Bank (ADB)
Main project features: The project is implemented aiming at following objectives: Improvement of
efficiency of Northern transport service; Reduction of traffic accident and Enhancement of institutional framework and finance for sustainable maintenance activity of Vietnam’s road network
- This Project has total length of around 20.18km spread on 12 communes/towns, Broad-bed = 12m according
to class III of highway, the sections go through the residential areas are applied the urban road standards with designed velocity Vtk = 80km/hr (for section passing residential areas,Vtk=60km/hr)
Position held: Environmental Specialist
Activities performed: Establish Environmental Impact Assessment (EIA) and Environmental Management
Plan (EMP) report
- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area
- Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to agencies
- Establish Environmental Management Plan (EMP) report
- Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB)
(8) Name of Assignment or project: Sub-Project of NH38 Improvement, Section from Quan Goi - Yen Lenh (Km33+963-km52+716) and 2 Bridges including Sat Bridge and Bun Bridge belonging to Component C, Vietnam Road Asset Management
Year: April 2013 - May 2013
Location: Hai Duong, Hung Yen, Thai Binh, Ha Giang, Nghe An, Tuyen Quang and Bac Ninh Provinces
Client: No.2 Project Management Unit, Ministry of Transport/ Funded by World Bank
Main project features: The project is implemented aiming at following objectives: Improvement of
efficiency of Northern transport service; Reduction of traffic accident and Enhancement of institutional framework and finance for sustainable maintenance activity of Vietnam’s road network The main objective
of the project is to enhance traffic capacity of the NH38
- The project shall be studied in investment in: Improving of NH38 Quan Goi - Yen Lenh section with a total length of about 29.5km, of which: Construction of bypass sections with a total length of about 15.8km; Keeping the existing NH38 of about 5.5km (Km38+325 to Km43+760); Repaving NH38 pavement for Km33+963 - Km38+400; Km43+600 - 47+600 sections with a total length of about 8.2km; Construction of 13 at-grade intersections; Construction of 06 new bridges with each bridge’s length < 200m; Drainage system and traffic safety
Position held: Environmental Specialist
Activities performed: Establish Environmental Impact Assessment (EIA) and Environmental Management
Trang 5Plan (EMP) report
- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area
- Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to agencies Establish Environmental Management Plan (EMP) report
- Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB)
(9) Name of Assignment or project: NH5 - Section from Ha Noi – Hai Duong (Km11+000 – Km93+000), belonging Vietnam Road Asset Management
Year: April 2013
Location: Hai Duong, Hung Yen, Thai Binh, Ha Giang, Nghe An, Tuyen Quang and Bac Ninh Provinces
Client: No.2 Project Management Unit, Ministry of Transport/ Funded by World Bank
Main project features: The subproject will be implemented in thirty-eight communes of the ten districts of
Ha Noi City, Hung Yen Province, Hai Duong Province and Hai Phong City The routine maintenance and emergency repair activities of subproject include managing and maintaining the pavement, bridges, electrical system, taking care the tree and shrub in the separator, protecting the road corridor, emergency repairing the drainage system, slope protection, auxiliary works
Position held: Environmental Specialist
Activities performed: Establish Environmental Protection Commitment (EPC) report
- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area
- Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to agencies
- Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB)
(10) Name of Assignment or project: NH.39 section from Vo Hoi – Diem Dien (Km91+000 - Km107+522),
belonging to Component C, Vietnam Road Asset Management
Year: March 2013 - April 2013
Location: Thai Binh Province
Client: No.2 Project Management Unit, Ministry of Transport/ Funded by World Bank
Main project features: The Project locates in 2 districts of Dong Hung and Thai Thuy, Thai Binh province
The Project has total length of around 13.21km, basically it follows existing NH39 route including: Improvement of 10,190m road, starting from Km91+000 (NH39 station) and ending at Km107+519.05 (NH39 station) New construction of 3.020m in sections of Km91+700 - Km92+100, Km93+300 - Km94+400, Km95+000 - Km95+320, Km97+100 - Km97+700, Km99+350 - Km99+700 and Km100+150
- Km100+400 for standard local relocations Improvement of 02 intersections at Km98+576 (crossing road
to Thuy Lien) and Km107+519.05 (Ngoai Trinh crossroads)
Position held: Environmental Specialist
Activities performed: Establish Environmental Impact Assessment (EIA) and Environmental Management
Plan (EMP) report
- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area
- Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to agencies
- Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB)
(11) Name of Assignment or project: QL2: Ham Yen – Ha Giang (Km175-Km283) belonging Vietnam Road Asset Management
Year: Fabruary 2013 – March 2013
Location: Ha Giang Provinces
Client: No.2 Project Management Unit, Ministry of Transport/ Funded by World Bank
Main project features: Project categories include: Maintenance, repair and upgrade NH2, Ham Yen – Ha
Giang section
Position held: Environmental Specialist
Activities performed: Establish Environmental Impact Assessment (EIA) and Environmental Management
Plan (EMP) report
Trang 6- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area
- Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to agencies
- Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB)
(12) Name of Assignment or project: Bien Hoa – Vung Tau Expressway
Year: November 2012 – Fabruary 2013
Location : Dong Nai and Bien Hoa – Vung Tau provinces
Client : Bien Hoa – Vung Tau Express Way Joinstock Company
Main project features: Total length is 78km, cross section 25.5÷27.5m, Design speed V=120km/h
Position held : Environmental Specialist
Activities performed: Establish Environmental Impact Assessment (EIA) and RAP report
- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area
- Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to the functional agencies
- Establish Master Plan on Compensation, Support and Resettlement (RAP report)
(13) Name of Assignment or project : Connecting Road between Ha Noi – Hai Phong Expressway and Ninh Binh
- Cau Gie Expressway
Year: September 2012 - October 2012
Location: Hung Yen and Ha Nam province
Client: No.1 PMU, MOT
Main project features: The total length of project is 47km; cross section B=25m and V=80km/h
Position held : Environmental Specialist
Activities performed: Surveying Dumping sites, consult the affected objects Writing EIA report
- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area
- Establish Environmental Impact Assessment (EIA) report
- Submit and complete reports to the authority agencies
(14) Name of Assignment or project: Cao Lanh Bridge Construction Investment Project
Year: May 2012 – August 2012
Location: Dong Thap Province
Client: Cuu Long Corporation for Investment Development and Project Management of Infrastructure (Cuu
Long CIPM)/ Funded by Asian Develope Bank (ADB)
Main project features: The total length of the project is 7.8km (Cao Lanh Bridge has the length of 2.1km);
cross section B=24.5m and Design speed: V=80km/h
Position held : Environmental Specialist
Activities performed: Establish Environmental Impact Assessment (EIA) report
- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area
- Establish Environmental Impact Assessment (EIA) report Submit and complete the report to the agencies
(15) Name of Assignment or project: Chua Boc - Pham Ngoc Thach flyover bridge project
Year: March 2012 – April 2012
Location: Ha Noi city
Client: Hanoi Department of Communication and Transportation
Main project features: The total length of Bridge is 592m; cross section B=12m and Design speed:
V=30km/h Approach road has 314m in length
Position held : Environmental Specialist
Activities performed: Survey and setting out for resettlement plan
Trang 7- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area
- Establish EIA report Submit and complete the EIA report to authority agencies
(16) Name of Assignment or project: Investment projects to expand and improve the Lang – Hoa Lac expressway
Year: October 2010 – February 2012
Location: Ha Noi city
Client: Thang Long PMU, MOT
Main project features: The total length of project is 28.3km and Design speed: V=120km/h
Position held: Environmental Specialist
Activities performed: Establish Environmental monitoring report;
- Supervising and Monitoring environmental condition in the construction stage of project Writing Environmental Monitoring and Supervising Report during construction and operation process of the project
- Reviewing Environmental Impact Assessment, Environmental Management Plan reports of the project and Environmental reports the contractors Supervising environmental protection works (including solid waste, hazardous waste, disposal, periodical environment monitoring ) and environmental protection compliance of contractors; Recommended and guideline for contractors to implement measures to minimize the environmental impact of the construction process (the mitigation of environmental impacts such as noise, dust, vibration, ); Supervising the implementation of environmental monitoring during project implementation Coordinate with project owners to report agencies and complete environmental procedures (water extraction permits, discharge permits, environmental periodic reporting ) in the construction process
- Identify safety hazards and environmental impacts and propose preventive measures Periodic Safety, Environmental and fire prevention Patrol in the construction process of the project, periodic EHS reports
- Implement environmental procedures according to policy of authority agencies
(17) Name of Assignment or project: Ninh Binh – Thanh Hoa Expressway
Year: December 2011 – February 2012
Location: Ninh Binh and Thanh Hoa provinces
Client : PMU No.1, MOT
Main project features: Total length is 127km, cross section 35m, Design speed V=120km/h
Position held : Environmental Specialist
Activities performed: Survey and setting out for resettlement plan Establish Environmental Impact
Assessment (EIA) report
- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area
- Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to authority
(18) Name of Assignment or project: Ben Luc – Hiep Phuoc component project (Belonging to the Ho Chi Minh
City Ring Road Project No.4)
Year: November 2011 – December 2011
Location: Long An province and Ho Chi Minh city
Client : PMU My Thuan
Main project features: Total length is 34.7km, cross section 35m, Design speed V=120km/h, 6 - 8 lanes
Position held : Environmental Specialist
Activities performed: Establish Environmental Impact Assessment (EIA) report.
- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area
- Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report
(19) Name of Assignment or project: Component projects/ Southern of Hau River road project
Year: May 2011 – August 2011
Location: Hau Giang and Soc Trang Province
Client : PMU My Thuan
Trang 8 Main project features: Total length is 15.45km, Plain level is 4, speed design Vtk=60km/h
Position held : Environmental Specialist
Activities performed: Establish Environmental Impact Assessment (EIA) report
- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area
- Establish Environmental Impact Assessment report Submit and complete the EIA report to the agencies
(20) Name of Assignment or project: Dinh Vu Polyester manufacturing Plant
Year: June 2008 – June 2009
Location: Hai An province – Hai Phong city
Client: Petrovietnam Petrochemical and Textile Fiber Joint Stock Company
Main project features: Building internal roads 1,860m length; building office, factories, power stations, storage, installation structures, machinery and equipment Building electrical systems, lighting, drainage systems, landscaping, trees, hills and scenery Building auxiliary systems: wastewater treatment facilities, drinking water, cooling water, gas stations, chemical grade, heat, heating systems, fire protection systems Commissioning, project test run Operating project official
Position held: Environmental Engineer
Activities performed:
- Implementation of records, procedures, legislation on environment under the provisions of the EIA report and other legal provisions involved Monitoring environmental compliances by the contractor
- Develop plans / measures to the authorities and approval in accordance with law; develop procedures / plans for the approval of leaders to manage and apply to environment Safety and fire prevention work of the factories
- Monitoring operation of wastewater treatment facilities in the plant Monitoring environmental protection work of the units in the plant
- Management of waste generated at the factory (emissions, noise, vibration, waste water, hazardous waste, solid waste, domestic waste, ); implementation of environmental monitoring plan periodically; prepare documents and environmental reports during project operation
- Study and propose solutions to limit waste generation, collection methods, waste treatment and solutions together with environmental protection works during officially put into operation of factory to ensure
compliance with the provisions the legislation on environmental protection
Expert’s Contact Information:
Certification:
I, the undersigned, certify to the best of my knowledge and belief that
(i) This CV correctly describes my qualifications and experience
(ii) I am not a current employee of the Executing or the Implementing Agency
(iii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of the inputs specified for me in Form TECH 6 provided team mobilization takes place within the validity of this proposal (iv) I was not part of the team who wrote the terms of reference for this consulting services assignment
(v) I am not currently debarred by a multilateral development bank
(vi) I, as the authorized representative of the firm submitting this Proposal for the Contract Package C1 Construction Supervision Consulting Services for Ben Luc - Long Thanh Expressway, certify that I have obtained the consent of the name expert to submit his/her CV, and that s/he will be available to carry out the assignment in accordance with the implementation arrangements and schedule set out the Proposal, and confirm his/her compliance with paras(i) and (v) above
I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged
Date: 01/November/2016 [Signature of Expert or authorized representative of the firm] Day/Month/Year
Full name of authorized representative: