1. Trang chủ
  2. » Thể loại khác

Form cv for bui nguyen pho envir engineer

8 22 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 8
Dung lượng 366,36 KB

Các công cụ chuyển đổi và chỉnh sửa cho tài liệu này

Nội dung

Detailed Tasks Assigned on Consultant’s Team of Experts  Inspection of the works according to the Environmental Impact Assesment, Environmental Management Program, Regulations of Viet

Trang 1

C URRICULUM V ITAE (CV)

Position Title & No Environmental Specialist

Name of Expert Bui Nguyen Pho

Education:

 Master`s Degree of Environmental Science and Sustainable Development - Viet Nam National University, 2012

 Bachelor`s Degree of Environmental Science - Hanoi University of Science, 2008

 Bachelor`s Degree of Mathematics and Physics - Hung Yen Teachers Training College, 2002

 Certificate for Safety, Health and Environment (EHS) includes: ISO14001:2015, OHSAS18001,…

 Training for Safety and Environmental protection: 2014, 2015, 2016

 Training for presentation skills: 2010

Employment Record Relevant to the Assignment

Period Employing organization & title/position,

contact information for references

Country Summary of Activities performed

relevant to the Assignment

June 2015 -

Present

NKV (Nippon Koei Vietnam) - APAVE,

A2Z join venture

Environmental/ HSE Specialist

Vietnam

Environmental Specialist: Reviewing EIA, EMP, EPC report

Supervising environmental protection works

Review and Approve Environmental reports

Guide contractors to setup environment treatment items

Supervising the implementation of environmental monitoring during project construction

Identify safety hazards and propose preventive measures

March 2014

- June 2015

Oriental Consultants Co., Ltd - TEDI,

APECO, ITST joint venture

Environmental/ HSE Specialist

Vietnam

Environmental Specialist: Reviewing Environmental reports

Supervising environmental protection works

Guide contractors to setup environment protection items

Supervising the implementation of environmental monitoring during project implementation

July 2009 -

March 2014

Environmental Consultancy Center -

Transport Engineering Design Inc

Environmental specialist

Vietnam

Environmental specialist: Environmental condition survey and monitoring

Investigation and consultation Socio-Economic condition in the project area Establish, writing Environmental Impact Assessment (EIA), Environmental Management Plan (EMP) and EPC report June 2008 –

July 2009

Centre for Natural Resources and

Environmental Studies (CRES) - Viet Nam

National University

Environmental Reseacher

Vietnam

Environmental Reseacher: Survey, interview, collect documents

Writing some parts of Social Impact Assesment report

Membership in Professional Associations & Publications:

 Viet Nam Association for Conservation of Nature and Environment (VACNE),

 Vietnam Bridge and Road Association

Language Skills:

Adequacy for the Assignment

Trang 2

Detailed Tasks Assigned on Consultant’s Team of Experts

 Inspection of the works according to the Environmental Impact Assesment, Environmental Management Program, Regulations of Viet Nam and Other Organization such as: JICA, ADB, WORLD BANK;

 Record the daily activities, Environment and Socio-Economic condition survey;

 Communicate with the Client and contractor for environmental protection regulation during construction;

 Coordinate with project owners to report to agencies and complete environmental procedures of projects;

 Review and Approve Environmental reports of contractor;

 Periodically patrol on Safety and environmental, Report the inspection result to the Resident Engineer, Clients;

Summarize the monthly accomplishment and report to Resident Engineer;

Writing Environmental reports (EIA, EMP, EPC…, monthly report, semi - monthly and annual… reports)

Work/ Assignments that Best Illustrates Capability to Handle the Assigned Tasks Reference to Prior

(1) Name of Assignment or project : Ca Pass Road Tunnel Construction Project- NH1A, Phu Yen and Khanh

Hoa Provinces in the form of BOT and BT

Year: June 2015 - present (17 months)

Location : Phu Yen and Khanh Hoa Provinces, Vietnam

Client : Deo Ca Investment Joint Stock Company/ Funded by BOT and BT

- Main project features: Total length of project is 13.4km; in which: Ca Pass tunnel length 3.9km Co Ma

tunnel length 0.5km and Approach road and bridges on route 9.0Km Tunnel: 02 single tubes (one way traffic

on each tube) at 30m distance Each tube has two lanes of 10.9m wide, covering 02 lanes of carriageway 2x3.5m + 2 safety strips + 1.0m + 2 service ways 2x1.18m Road: Embankment width Bn=24m Pavement width Bm=22.5m, including: 4 lanes carriageway x 3.75m + median strip width 1.5m + shoulder width 2x0.5m + emergency lane 2x2.5m Bridge deck: Bdeck = 24m and divided into two one-way sections Design speed: 80km/h

Position held : Environmental Specialist

Activities performed: Reviewing Environmental reports, Supervising environmental protection works

Review and Approve Environmental reports Coordinate with project owners to report agencies (monthly, semi-annual reports Guide contractors to setup environment treatment items, Supervising the implementation

of environmental monitoring during project implementation, Identify safety hazards and propose preventive measures…

- Communicate with the Client for environmental protection regulation during constrution

- Reviewing Environmental Impact Assessment, Environmental Management Plan reports of the project and Environmental reports of contractors Review and Approve Environmental reports of Contractors Supervising environmental protection works (including solid waste, hazardous waste, disposal, periodical environment monitoring ) and environmental protection compliance of contractors

- Recommended and guideline for contractors to implement measures to minimize the environmental impact

of the construction (the mitigation of environmental impacts such as noise, dust, vibration, water, soil )

- Guide contractors to setup environment treatment items (ventilation and dust filter in the tunnel, sewage disposal systems and wastewater treatment, sludge collection system, the storage areas for solid waste, household waste and hazardous waste) and monitoring the operation of items related to environmental

- Supervising the implementation of environmental monitoring during project implementation Coordinate with project owners to report agencies (monthly, semi-annual reports) and complete environmental procedures (water extraction permits, discharge permits, environmental periodic reporting ) in the construction process

- Identify safety hazards and environmental impacts and propose preventive measures Periodic Safety, Environmental and fire prevention Patrol in the construction process of the project, periodic EHS reports

(2) Name of Assignment or project: National Highway No 5 and Thanh Tri Bridge Interchange Project/ JICA

Year : March 2014 - June 2015 (16 months)

Location : Ha Noi, Vietnam

Client : Thang Long PMU - MOT/ Funded by JICA

Main project features: The project includes components: (i) Build up the ramps for going up and down at

the intersection between Thanh Tri Bridge and National highway No.5; (ii) Expanding the overpass of NH5 from 4 into 6 lanes; (iii) Implementing relocation of 2km of railway

Position held : Environmental Specialist

Trang 3

Activities performed: Reviewing Environmental reports, Supervising environmental protection works

Review and Approve Environmental reports Coordinate with project owners to report agencies (monthly, semi-annual reports) Guide contractors to setup environment treatment items, Supervising the implementation of environmental monitoring during project implementation, Identify safety hazards and propose measures to minimize unsafety issues

- Review environmental impact assessment report, environmental management plan of the project Supervise and inspect the environmental compliance of contractors Proposed solutions to minimize environmental pollution during construction; Supervising, monitoring the environmental condition in the construction stage

of the project

- Coordinate with project owners to report to agencies and complete environmental procedures during construction of the project Implement environmental procedures according to policy of environmental and safety of regulations

- Guide contractors to setup environment treatment items (wastewater treatment systems, sludge collection system, the storage areas for solid waste, household waste and hazardous waste) and monitoring the operation

of items related to environmental protection

- Recommended and guideline for contractors to implement measures to minimize the environmental impact

of the construction process (the mitigation of environmental impacts such as noise, dust, vibration, water, soil, traffic accidents )

- Responsible for weekly reporting to the project manager Cooperating with Japanese experts for site inspection

- Supervising sub-contractor on periodic environmental monitoring and propagation of HIV/AIDS prevention

- Identify risks and the impacts on the environment and propose measures to prevent, minimize with the aim to ensure safety and environmental protection in the construction process of the project

(3) Name of Assignment or project : National Highway No 1 Expansion Through Quang Ngai Province Project

Year: January 2014 – March 2014

Location: Quang Ngai Province , Vietnam

Client: Quang Ngai Department of Transportation

Main project features: Project will enhance the pavement of NH No.1 from Km1027+000 - Km1063 +877;

expand from Km1092 +000 - Km1110+000 and adjust from Km1110+000- Km1125 +000

Position held: Environmental Expert

Activities performed: Research, review and exalted additional pavement problems affect on the residential

areas along roadsides Studying problems of erosion, deposition in the horizontal position sewer lines Provide mitigation measures and reasonable compensation

(4) Name of Assignment or project: National Highway No.1 Expansion Through Ha Tinh Province

Year : December 2013

Location: Ha Tinh Province

Client: Ha Tinh Department of Transportation

Main project features: Expansion National Highway 1 Construction from Km517+950 – Km556+000

Position held : Environmental Expert

Activities performed: Establish EIA report

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area

- Establish Environmental Impact Assessment (EIA) report

- Submit and complete the EIA report to the authority agencies

(5) Name of Assignment or project: Construction of Viaduct Section Mai Dich – South Thang Long /JICA

Year : October 2013 – December 2013

Location : Ha Noi

Client : PMU Thang Long/ Funded by JICA

Main project features: Total length of project is 6.1km, cross section B = 24m, Design speed: 120km/h

Position held : Environmental Expert

Activities performed : Investigate and study environmental and socio-economic condition in the residence

area of the Project Establish Social Impact Assessment (SIA) and Resettlement Action Plan (RAP) report

Trang 4

(6) Name of Assignment or project: Viet Tri and Ninh Phuc Port Improvement - Northern Delta Transport

Development Project

Year: May 2013 – October 2013

Location: Phu Tho and Ninh Binh province

Client: Waterways PMU/ Funded by World Bank

Main project features : Strengthening the capacity to receive and transport in the port area of Viet Tri and

Ninh Phuc through Dredging of the port, upgrade infrastructure sector as wharves, warehouses construction,

roads to the port

Position held: Environmental Specialist

Activities performed: Supervise and inspect the environmental compliance of contractors

- Supervising and monitoring the environmental condition (dust PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey) in the construction stage of the project

- Submit and complete reports to the authority agencies

- Proposed solutions to minimize environmental pollution during construction

(7) Name of Assignment or project: Subproject component of NH39-1 rehabilitation, Trieu Duong – Hung Ha section (Km42+714 - Km64+000) and 3 bridges on alignment include Nai, Dong Tu and Go belong to Component C of Vietnam Road Asset Management Project

Year: May 2013

Location: Hung Yen, Thai Binh Provinces

Client: Project Management Unit 3, Ministry of Transport/ Funded by Asian Development Bank (ADB)

Main project features: The project is implemented aiming at following objectives: Improvement of

efficiency of Northern transport service; Reduction of traffic accident and Enhancement of institutional framework and finance for sustainable maintenance activity of Vietnam’s road network

- This Project has total length of around 20.18km spread on 12 communes/towns, Broad-bed = 12m according

to class III of highway, the sections go through the residential areas are applied the urban road standards with designed velocity Vtk = 80km/hr (for section passing residential areas,Vtk=60km/hr)

Position held: Environmental Specialist

Activities performed: Establish Environmental Impact Assessment (EIA) and Environmental Management

Plan (EMP) report

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area

- Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to agencies

- Establish Environmental Management Plan (EMP) report

- Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB)

(8) Name of Assignment or project: Sub-Project of NH38 Improvement, Section from Quan Goi - Yen Lenh (Km33+963-km52+716) and 2 Bridges including Sat Bridge and Bun Bridge belonging to Component C, Vietnam Road Asset Management

Year: April 2013 - May 2013

Location: Hai Duong, Hung Yen, Thai Binh, Ha Giang, Nghe An, Tuyen Quang and Bac Ninh Provinces

Client: No.2 Project Management Unit, Ministry of Transport/ Funded by World Bank

Main project features: The project is implemented aiming at following objectives: Improvement of

efficiency of Northern transport service; Reduction of traffic accident and Enhancement of institutional framework and finance for sustainable maintenance activity of Vietnam’s road network The main objective

of the project is to enhance traffic capacity of the NH38

- The project shall be studied in investment in: Improving of NH38 Quan Goi - Yen Lenh section with a total length of about 29.5km, of which: Construction of bypass sections with a total length of about 15.8km; Keeping the existing NH38 of about 5.5km (Km38+325 to Km43+760); Repaving NH38 pavement for Km33+963 - Km38+400; Km43+600 - 47+600 sections with a total length of about 8.2km; Construction of 13 at-grade intersections; Construction of 06 new bridges with each bridge’s length < 200m; Drainage system and traffic safety

Position held: Environmental Specialist

Activities performed: Establish Environmental Impact Assessment (EIA) and Environmental Management

Trang 5

Plan (EMP) report

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area

- Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to agencies Establish Environmental Management Plan (EMP) report

- Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB)

(9) Name of Assignment or project: NH5 - Section from Ha Noi – Hai Duong (Km11+000 – Km93+000), belonging Vietnam Road Asset Management

Year: April 2013

Location: Hai Duong, Hung Yen, Thai Binh, Ha Giang, Nghe An, Tuyen Quang and Bac Ninh Provinces

Client: No.2 Project Management Unit, Ministry of Transport/ Funded by World Bank

Main project features: The subproject will be implemented in thirty-eight communes of the ten districts of

Ha Noi City, Hung Yen Province, Hai Duong Province and Hai Phong City The routine maintenance and emergency repair activities of subproject include managing and maintaining the pavement, bridges, electrical system, taking care the tree and shrub in the separator, protecting the road corridor, emergency repairing the drainage system, slope protection, auxiliary works

Position held: Environmental Specialist

Activities performed: Establish Environmental Protection Commitment (EPC) report

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area

- Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to agencies

- Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB)

(10) Name of Assignment or project: NH.39 section from Vo Hoi – Diem Dien (Km91+000 - Km107+522),

belonging to Component C, Vietnam Road Asset Management

Year: March 2013 - April 2013

Location: Thai Binh Province

Client: No.2 Project Management Unit, Ministry of Transport/ Funded by World Bank

Main project features: The Project locates in 2 districts of Dong Hung and Thai Thuy, Thai Binh province

The Project has total length of around 13.21km, basically it follows existing NH39 route including: Improvement of 10,190m road, starting from Km91+000 (NH39 station) and ending at Km107+519.05 (NH39 station) New construction of 3.020m in sections of Km91+700 - Km92+100, Km93+300 - Km94+400, Km95+000 - Km95+320, Km97+100 - Km97+700, Km99+350 - Km99+700 and Km100+150

- Km100+400 for standard local relocations Improvement of 02 intersections at Km98+576 (crossing road

to Thuy Lien) and Km107+519.05 (Ngoai Trinh crossroads)

Position held: Environmental Specialist

Activities performed: Establish Environmental Impact Assessment (EIA) and Environmental Management

Plan (EMP) report

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area

- Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to agencies

- Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB)

(11) Name of Assignment or project: QL2: Ham Yen – Ha Giang (Km175-Km283) belonging Vietnam Road Asset Management

Year: Fabruary 2013 – March 2013

Location: Ha Giang Provinces

Client: No.2 Project Management Unit, Ministry of Transport/ Funded by World Bank

Main project features: Project categories include: Maintenance, repair and upgrade NH2, Ham Yen – Ha

Giang section

Position held: Environmental Specialist

Activities performed: Establish Environmental Impact Assessment (EIA) and Environmental Management

Plan (EMP) report

Trang 6

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area

- Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to agencies

- Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB)

(12) Name of Assignment or project: Bien Hoa – Vung Tau Expressway

Year: November 2012 – Fabruary 2013

Location : Dong Nai and Bien Hoa – Vung Tau provinces

Client : Bien Hoa – Vung Tau Express Way Joinstock Company

Main project features: Total length is 78km, cross section 25.5÷27.5m, Design speed V=120km/h

Position held : Environmental Specialist

Activities performed: Establish Environmental Impact Assessment (EIA) and RAP report

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area

- Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to the functional agencies

- Establish Master Plan on Compensation, Support and Resettlement (RAP report)

(13) Name of Assignment or project : Connecting Road between Ha Noi – Hai Phong Expressway and Ninh Binh

- Cau Gie Expressway

Year: September 2012 - October 2012

Location: Hung Yen and Ha Nam province

Client: No.1 PMU, MOT

Main project features: The total length of project is 47km; cross section B=25m and V=80km/h

Position held : Environmental Specialist

Activities performed: Surveying Dumping sites, consult the affected objects Writing EIA report

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area

- Establish Environmental Impact Assessment (EIA) report

- Submit and complete reports to the authority agencies

(14) Name of Assignment or project: Cao Lanh Bridge Construction Investment Project

Year: May 2012 – August 2012

Location: Dong Thap Province

Client: Cuu Long Corporation for Investment Development and Project Management of Infrastructure (Cuu

Long CIPM)/ Funded by Asian Develope Bank (ADB)

Main project features: The total length of the project is 7.8km (Cao Lanh Bridge has the length of 2.1km);

cross section B=24.5m and Design speed: V=80km/h

Position held : Environmental Specialist

Activities performed: Establish Environmental Impact Assessment (EIA) report

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area

- Establish Environmental Impact Assessment (EIA) report Submit and complete the report to the agencies

(15) Name of Assignment or project: Chua Boc - Pham Ngoc Thach flyover bridge project

Year: March 2012 – April 2012

Location: Ha Noi city

Client: Hanoi Department of Communication and Transportation

Main project features: The total length of Bridge is 592m; cross section B=12m and Design speed:

V=30km/h Approach road has 314m in length

Position held : Environmental Specialist

Activities performed: Survey and setting out for resettlement plan

Trang 7

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area

- Establish EIA report Submit and complete the EIA report to authority agencies

(16) Name of Assignment or project: Investment projects to expand and improve the Lang – Hoa Lac expressway

Year: October 2010 – February 2012

Location: Ha Noi city

Client: Thang Long PMU, MOT

Main project features: The total length of project is 28.3km and Design speed: V=120km/h

Position held: Environmental Specialist

Activities performed: Establish Environmental monitoring report;

- Supervising and Monitoring environmental condition in the construction stage of project Writing Environmental Monitoring and Supervising Report during construction and operation process of the project

- Reviewing Environmental Impact Assessment, Environmental Management Plan reports of the project and Environmental reports the contractors Supervising environmental protection works (including solid waste, hazardous waste, disposal, periodical environment monitoring ) and environmental protection compliance of contractors; Recommended and guideline for contractors to implement measures to minimize the environmental impact of the construction process (the mitigation of environmental impacts such as noise, dust, vibration, ); Supervising the implementation of environmental monitoring during project implementation Coordinate with project owners to report agencies and complete environmental procedures (water extraction permits, discharge permits, environmental periodic reporting ) in the construction process

- Identify safety hazards and environmental impacts and propose preventive measures Periodic Safety, Environmental and fire prevention Patrol in the construction process of the project, periodic EHS reports

- Implement environmental procedures according to policy of authority agencies

(17) Name of Assignment or project: Ninh Binh – Thanh Hoa Expressway

Year: December 2011 – February 2012

Location: Ninh Binh and Thanh Hoa provinces

Client : PMU No.1, MOT

Main project features: Total length is 127km, cross section 35m, Design speed V=120km/h

Position held : Environmental Specialist

Activities performed: Survey and setting out for resettlement plan Establish Environmental Impact

Assessment (EIA) report

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area

- Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report to authority

(18) Name of Assignment or project: Ben Luc – Hiep Phuoc component project (Belonging to the Ho Chi Minh

City Ring Road Project No.4)

Year: November 2011 – December 2011

Location: Long An province and Ho Chi Minh city

Client : PMU My Thuan

Main project features: Total length is 34.7km, cross section 35m, Design speed V=120km/h, 6 - 8 lanes

Position held : Environmental Specialist

Activities performed: Establish Environmental Impact Assessment (EIA) report.

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area

- Establish Environmental Impact Assessment (EIA) report Submit and complete the EIA report

(19) Name of Assignment or project: Component projects/ Southern of Hau River road project

Year: May 2011 – August 2011

Location: Hau Giang and Soc Trang Province

Client : PMU My Thuan

Trang 8

Main project features: Total length is 15.45km, Plain level is 4, speed design Vtk=60km/h

Position held : Environmental Specialist

Activities performed: Establish Environmental Impact Assessment (EIA) report

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition survey), Investigation and survey the socio-economic condition in Project area

- Establish Environmental Impact Assessment report Submit and complete the EIA report to the agencies

(20) Name of Assignment or project: Dinh Vu Polyester manufacturing Plant

Year: June 2008 – June 2009

Location: Hai An province – Hai Phong city

Client: Petrovietnam Petrochemical and Textile Fiber Joint Stock Company

Main project features: Building internal roads 1,860m length; building office, factories, power stations, storage, installation structures, machinery and equipment Building electrical systems, lighting, drainage systems, landscaping, trees, hills and scenery Building auxiliary systems: wastewater treatment facilities, drinking water, cooling water, gas stations, chemical grade, heat, heating systems, fire protection systems Commissioning, project test run Operating project official

Position held: Environmental Engineer

Activities performed:

- Implementation of records, procedures, legislation on environment under the provisions of the EIA report and other legal provisions involved Monitoring environmental compliances by the contractor

- Develop plans / measures to the authorities and approval in accordance with law; develop procedures / plans for the approval of leaders to manage and apply to environment Safety and fire prevention work of the factories

- Monitoring operation of wastewater treatment facilities in the plant Monitoring environmental protection work of the units in the plant

- Management of waste generated at the factory (emissions, noise, vibration, waste water, hazardous waste, solid waste, domestic waste, ); implementation of environmental monitoring plan periodically; prepare documents and environmental reports during project operation

- Study and propose solutions to limit waste generation, collection methods, waste treatment and solutions together with environmental protection works during officially put into operation of factory to ensure

compliance with the provisions the legislation on environmental protection

Expert’s Contact Information:

Certification:

I, the undersigned, certify to the best of my knowledge and belief that

(i) This CV correctly describes my qualifications and experience

(ii) I am not a current employee of the Executing or the Implementing Agency

(iii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of the inputs specified for me in Form TECH 6 provided team mobilization takes place within the validity of this proposal (iv) I was not part of the team who wrote the terms of reference for this consulting services assignment

(v) I am not currently debarred by a multilateral development bank

(vi) I, as the authorized representative of the firm submitting this Proposal for the Contract Package C1 Construction Supervision Consulting Services for Ben Luc - Long Thanh Expressway, certify that I have obtained the consent of the name expert to submit his/her CV, and that s/he will be available to carry out the assignment in accordance with the implementation arrangements and schedule set out the Proposal, and confirm his/her compliance with paras(i) and (v) above

I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged

Date: 01/November/2016 [Signature of Expert or authorized representative of the firm] Day/Month/Year

Full name of authorized representative:

Ngày đăng: 03/06/2021, 01:03

TỪ KHÓA LIÊN QUAN

w