Agenda - Highband Highband Principle Performance Results Why Highband?. Contact Principle B® 30% reduction in contact mass m Transmission length reduced from 72mm to 13mm Series 2 HIG
Trang 1KRONE RIGHBAND
KRONE Communications
Trang 2the wire firmly in_position and
isolate the contact area from vibration and other forms of mechanical stress
Trang 4Agenda - Highband
Highband Principle Performance Results Why Highband?
Applications Reference Sites Next Generation
Trang 54 Highband, the Challenge
Trang 6Contact Principle
B® 30% reduction in
contact mass
m Transmission length reduced from 72mm to 13mm
Series 2 HIGHBAND 8
Trang 712.6mm
Trang 9
4 Features and Benefits?
One Tool Will Do Range - 8, 10, 16, 20 Compact 8
Accessories
Test Cords, Disconnect Plugs
m Patch By Exception
Trang 11Auckland University Glaxo Smith Kline UK
Trang 12> HIGHBAND The Next Generation
Trang 13
Agenda - ULTIM 8
Why Develop ULTIM 8?
Mechanically - How We Did It Electrically - What We Achieved
Features and Benefits Applications
Trang 144 Why Develop ULTIM 8?
m= HIGHBAND well exceeded the standard requirements m™ HIGHBAND offered maximum headroom to the standard requirements m@ HIGHBAND could supportll applications - existing and on the horizon
Trang 15Category 6 was proposed Full duplex transmission systems desired
Gigabit and Tetrabit
Who says it wont happen!
Trang 16> Mechanical - How we did it
Trang 17Electrically - What we achieved
ULTIM8 CAT 6 Test
Trang 18
Features and Benefits
m@ Backward Compatibility ->Gost Saving
— Mounting
— Tooling
— Termination Method
Installer Familiarity -> -Productivity Savings Patch By Exception ->' Productivity Savings
KRONE ULTIM 8, The Most Cost Effective Solution!
Trang 19Applications
All Legacy systems 10BT
100BT 1000BT ATM155 ATM655 Tetrabit Solutions Any System Designed to ISO 11801:2002 & EIA/TIA 568 B otandards
Trang 20
4 A Typical PremisNET Application
KRONE
RJ45 to RJ45 Patch Cord
Patch Panel
HUB Cable HIGHBAND Work-station
Modules Riser Cable
KRONE
Optical Fibre Distributor
Copper MDF KRONE Module
Fibre Backbone
Trang 21PremisNET: A typical TrueNet C6T Application
((IDC to RU45 Solution)
4
trueNet C6T Cable
+=
Hub/Switch TruePatch
Con
HighBand to HignBand
Trang 23
Reference Sites
(ULTIM 8 was released in March 1999)
m A Very Large American Bank, London
# Glaxo Smith Klein G€ompany, London
Trang 25Agenda - Patch By Exception
What is Patch By Exception?
How Does It Work?
Features and Benefit Reference Sites
Trang 26> How Does It Work?
Normal Hardwired Solution
Trang 277 ” a,
How Does lt Work? '(cont)ˆ P A #£
OUT
HIGHBAND &
MODULE
Trang 28“ r
nF
Well This Is What You Do! T A #£
HIGHBAND PATCH CORD
Trang 29Features and Benefits
— Frame Always Neat and Tidy
— Record (Asset) Keeping
— Adds, Moves and Changes
— Eliminates Unauthorised Changes Easier Fault Finding
Improved Pair Utilisation
Trang 30a PBE - A New Cable Management Concept!
Trang 3242 RU Rack
84
22 2,000
Trang 35KRO/99
Typical Application AccessNET
Trang 364 Features and Benefits (cont)
— Mounting
— Tooling
— Termination Method
m@ Installer Familiarity -> Productivity Savings
Trang 37> Major Reference Sites
Hong Kong Telecom has standardised on the
HIGHBAND 10 product
Starhub (Singapore)
TELSTRA (Australia) HIGHBAND 10 for Standard termination
Trang 38Summary
HIGHBAND
m Based on the KRONE LSA-Plus contact principle (45° angle)
m CAT 5E ULTIM 8
= Maximum headroom beyond CAT 6, class E transmission performance
8 pair disconnect module enables high speed LAN and WAN Patch By Exception - A new cable management concept Supports any system designed to ISO 11801 (2000)
HIGHBAND 10 m@ CAT 5E