ADC’s Cable Management "hoe KRONE Generally, there are two phases to cable management: First, there ts the initial Then follows the cross-connects installation of permanent semi-perman
Trang 2What is Cable Management? ye Why is it important?
KRONE
(|
management = — Cable management is
and why is it “2 ~ the system utilized to
control the routing and important?
Trang 6
Cable Management?
Trang 7
Cable Management?
:
'
Trang 8ADC s Cable Management
10/5/2006
Trang 10ADC’s Cable Management "hoe
KRONE
Generally, there are two phases to cable management:
First, there ts the initial Then follows the cross-connects installation of permanent (semi-permanent cabling) from
Trang 11
ADC s Cable Management
Trang 12
ADC’s Cable Management "hoe
KRONE
A All jumpers in the left hand Upper
side of the cross connect field Jumper
should enter and leave the bay Wireways
from the left vertical wireways
B All jumpers in the right hand Cross
side of the cross connect field Connect
should enter and leave the bay Jumper
from the right vertical
wireways
C All intrabay cross connects
should use the vertical rings
except when the terminations
are in the same panel Vertical
Jumper
D All interbay cross connects Wireways
should use the horizontal
wireways
E All jumpers originating in the
upper half of the cross connect
field should route via the upper
horizontal wireways Lower
Jumper
F All jumpers originating in Wireways
the lower half of the cross
connect field should route via
the lower horizontal wireways
Trang 13
`
COLMA EET Uy BIEL ED
LAMM LASSI IIE
Trang 15DSX Evolution W
Trang 17
Bantam Plug Construction UF
Trang 18
RN = Ring Normal Contact
TN = Tip Normal Contact
10/5/2006 ADC Proprietary and Confidential 24
Trang 20DSX Jackfield Cover off
Trang 21
DSX Module close up
KRONE
Trang 22¢ Add Jack Field
¢ Two terminations per circuit
XMT/OUT rh X-con X-con | XMT/OUT
Field (u) e G (u) Field
Trang 23
DSX — E1 PCM application
KRONE
Trang 25
KRONE
Trang 26
KRONE
33
Trang 27
KRONE
Trang 2810/5/2006
ADC Proprietary and Confidential 35
Trang 29
KRONE
Trang 3010/5/2006
Trang 3210/5/2006
ADC Proprietary and Confidential 39
Trang 33FlexDSX™ Super High Density Bay
Trang 36âm
KRONE
Basic Methods:
¢ In Service Testing/Monitoring - Non-Intrusive Access - MON Jack
¢ Out of Service Testing - Intrusive Access - IN or OUT Jack
Test Elemen
Trang 37
Monitor Signal Monitor Signal
Test DSX DSX CO CO DSX DSX —
Trang 38
KRONE
Out of Service Testing Methods
¢ Point to Point (Testing the Span)
Test DSX DSX CO CO DSX DSX —
ry M 6 M b Xmit regenerator Xmit d OO `)
IOS ark [st 7 <a Te] (oR OC |
10/5/2006 ADC Proprietary and Confidential
Trang 39DSX Functions - Testing
Out of Service Testing Methods
¢ Testing the Network Elements
Trang 40DSX Functions - Testing
Out of Service Testing Methods
¢ Looping (Plug or Code)
Trang 41âm
KRONE
Problem: Network Element connect to location 1 fails
Solution: Patch to Spare NE connected to location 10
Test Box
Xmit
Xmit
Trang 42
Restoration Using a Maintenance Line WP
KRONE Problem: Span Line Connected to Location 20 Cut by Rod Solution: Patch to Spare Span Connected to location 40
Test CO CO Test Box O O Repeater Repeater |@ O Box xi M D M ° Xmit Revers or Xmit c Sì xi TAROT] | 5 =| |e TT 2 -ọc ee Rec Rec Loc g
Test DSX DSX Box @ @ Xmit 3 My Ly C H-2 O [Eo We < x Noi © /2 > ng Loc Loc Loc ec 10 40 40
Trang 43
Box O O Repeater Repeater ® ©®
Trang 45
Mixed Solution of Copper and Fiber "hoe
KRONE
DFX-RSFA0S (4.5ft HIGH SKELETON BAY — DS1/FLEX)
—=— _ AUX-FP10AF (10 POS FUSE PANEL)
~=— DFX-1FA064 (64 CKT DS1/FLEX MODULE)
m=— DSX4E-E01C (24 CKT DS3 CHASSIS) E/W (24) DSX-4E-MBFA (DS3 FRONT ACCESS — BNC)
ì =ấ | =——— FMD-DRSSTR-1 (BULK PATCHCORD STORAGE)
= —_—
— =“j =—— FVM-19X350 (4 POS VALUE ADDED MODULE)
— GROWTH AREA (9 RACK UNITS — 15.75”)