The following will be discussed in this chapter: Expediting a project, resource loading, resource leveling, allocating scarce resources to projects, allocating scarce resources to several projects, goldratt’s critical chain.
Trang 1Sixth Edition
Chapter 6 Allocating Resources to
the Project
Trang 7 crash time
cost
normal
cost crash
slope
Trang 8Project
Table 61
Trang 9a Project, AOA Network Part 1
Figure 61 (Partial)
Trang 10a Project, AOA Network Part 2
Figure 61 (Partial)
Trang 11Figure 62
Trang 12AOA Network with Node Labels
Figure 63
Trang 13Spreadsheet Model
Figure 64
Trang 14Spreadsheet Model
Figure 64
Trang 15Completed Solver Dialog Box
Figure 65
Trang 16Solution to Crash Project 5 Days
Figure 66
Trang 21• Will see using short documentary DVD
example
Trang 22Project Plan and Gantt Chart for Production of a Short Documentary Film
Figure 67
Trang 23Adjusted for Client Availability
Figure 68
Trang 24Production
Table 63
Trang 25• Most project management software assumes that any resource assigned to an activity
Trang 27Scriptwriter Showing All Activities
Figure 69
Trang 28Report for Scriptwriter
Figure 610
Trang 29Resource Leveled Report for Scriptwriter Showing All Activities
Figure 611
Trang 30for Scriptwriter
Figure 612
Trang 31for Scriptwriter Leveled
Table 64
Trang 32Final Gantt Chart Schedule, Scriptwriters and Producer Leveled
Figure 613
Trang 37• Pseudoactivities are those which have duration but require no resources
Trang 38Pseudoactivities
Figure 615
Trang 43Figure 616
Trang 45• The budget is frequently unrealistic and therefore
often exceeded
• It seems like my project is always in competition
for resources with other projects
Trang 47Figure 617
Trang 50Based on Simulation
Table 65
Trang 54Figure 620
Trang 55A and B
Figure 621
Trang 61Figure 623