Trang 1Construction methods and management
Chapter 6 PILING
WORK
Trang 3©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Trang 4PILE TYPES
Chapter 6 Piling work
Trang 5©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Trang 6THE INSTALLING PROCESS FOR
Chapter 6 Piling work
Trang 7©2010 của Đỗ Thị Xuân Lan , GVC Ths.
The installing process for
displacement piles
7
Trang 8Displacement piles
-advantages
• Material forming piles can be inspected for quality
• Not susceptible to squeezing or necking
• The pile’s carrying capacity can be
monitored during installing process
• The construction operation is not affected
by groundwater
• Projection above groundlevel
• Can be driven to long lengths
Trang 9©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Displacement piles
-disadvantages
• May break during driving
• May suffer unseen damage which may reduce carrying capacity
9
Trang 10Equipment for installing
Trang 11©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Equipment for installing
piles
11
source: Riley và Cotgrave, 2004, tr 136
drop hammer/
diesel hammer/
hydraulic hammer
driving
vibro-jacking
Trang 12Pile driving equipment:
drop hammer
Trang 13©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Pile driving equipment:
• Small investment, simplicity of
operation, ability to vary energy per blow
• Slow rate of driving piles, danger of
damaging piles or adjacent buildings,
unable to use directly for underwater
driving
13
Trang 14Pile driving equipment:
diesel hammer
Trang 15©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Pile driving equipment:
Trang 16Pile driving equipment:
Trang 17©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Pile driving equipment:
hydraulic hammer
17
source: 0712(7ton)/Hydraulic_Pile_Hammer(7ton1.2M)01.jpg
Trang 18http://www.powerquip.co.kr/job/SGH-Pile driving equipment:
Hydraulics hammer
• Operate on the differential pressure of hydraulic fluid
• The drivers develop up to 140 tons of
pressing or extracting force, make
minimal noise and cause very little
vibration
• Suited in areas where there is restricted overhead space
Trang 19©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Pile driving equipment:
vibro-driving
19
Trang 20Pile driving equipment:
vibro-driving
• Effective in driving piles into
water-saturated noncohesive soils
• The vibration are transmitted to the pile and from the pile to the adjacent soil → reduces the skin friction between the
soil and the pile → The combined dead weight of the pile and the driver drive
the pile rapidly
Trang 21©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Pile driving equipment:
jacking
21
Trang 22The installing process for
in-situ hollow piles
Trang 23©2010 của Đỗ Thị Xuân Lan , GVC Ths.
THE INSTALLING PROCESS FOR NON-DISPLACEMENT PILES
Chapter 6 Piling work
23
Trang 24Nondisplacement piles
-advantages
• Lenghth can be varied
• Soil removed during boring can be
analysed for comparison with site
investigation data
• Drilling tools can break up obtructions
which can not be penetrated by any form of displacement pile
• Material forming pile is not governed by
handling or driving stresses
• Can be installed in very long lengths
• Can be installed without appreciable noise
Trang 25©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Nondisplacement piles
-disadvantages
• Concrete in shaft susceptible to
squeezing or necking in soft soils
• Special techniques needed for
concreting in water-bearing soils
• Concrete cannot be really inspected
after installation
• Drilling a number of piles in group may cause loss of ground and settlement of adjacent structures
25
Trang 26Bored piles
• Diameter of bored pile ranges from
600mm (less than 600mm: micro bored piles)
• A continous flight, hollow shaft auger is rotated into the soil
• Bentonite is commonly used to resist the excavation
• Concreted is poured underwater with
Trang 27©2010 của Đỗ Thị Xuân Lan , GVC Ths.
1.Set out, bore the initial hole,
place the casing
2 Pump betonite which is
commonly used to resist the
excavation into the borehole
3 Proceed with boring using an
augering bit to required depth.
4 Pump out and recycle
contaminated bentonite and
pump fresh betonite into the
borehole, install steel cage and
pour concrete
5.Pour concrete to 1m higher
than the required depth
6 Complete operation after
extracting casing
Bored piles
27
source: http://www.frankipile.co.id/pic/bored-pile.jpg
Trang 28Bored piles: augers
Cohesive soils
Trang 29©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Diaphragm wall
29
Trang 30diaphragm wall construction
Trang 31©2010 của Đỗ Thị Xuân Lan , GVC Ths 31
Typical excavation
sequence of diaphragm
walls
Trang 32diaphragm wall construction
Trang 33©2010 của Đỗ Thị Xuân Lan , GVC Ths.
diaphragm wall construction
Trang 34diaphragm wall construction
Trang 35©2010 của Đỗ Thị Xuân Lan , GVC Ths.
diaphragm wall construction
35
source: http://www.itm-ltd.com/projects/images/Dscn0099b.jpg
Guide FGgui
Guide walls built in
advance for the trench
excavation
Trang 36CONSTRUCTION SEQUENCE
Chapter 6 Piling work
Trang 37©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Precast reinforced concrete piles
Trang 38Precast reinforced concrete piles
Trang 39©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Precast reinforced concrete piles
Trang 40Precast reinforced concrete piles
Trang 41©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Trang 42Precast reinforced concrete hollow piles
Trang 43©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Precast reinforced concrete hollow piles
Trang 44Precast reinforced concrete hollow piles
Trang 45©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Precast reinforced concrete hollow piles
45
4 Weld
the joint
Trang 46Precast reinforced concrete hollow piles
5 Continue
hammering
Trang 47©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Trang 48Concrete sheet piling
Trang 49©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Concrete sheet piling
49
2 Install
guiding
frame
Trang 50Concrete sheet piling
3 Hoist
up the
pile
Trang 51©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Concrete sheet piling
Trang 52Concrete sheet piling
Trang 53©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Concrete sheet piling
Trang 54Concrete sheet piling
Trang 55©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Concrete sheet piling
Trang 56Concrete sheet piling
Trang 57©2010 của Đỗ Thị Xuân Lan , GVC Ths.
CONSTRUCTION SEQUENCE
ILLUSTRATION OF STEEL SHEET
PILES
57
Trang 58Steel sheet piling
Trang 59©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Steel sheet piling
Trang 60Steel sheet piling
Trang 61©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Steel sheet piling
Trang 62Steel sheet piling
Trang 63©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Steel sheet piling
63
4
Vibrating
the piles
Trang 64Steel sheet piling
Trang 65©2010 của Đỗ Thị Xuân Lan , GVC Ths.
Steel sheet piling
Trang 66Steel sheet piling
7 Steel
sheet
piles
installed