PROCUREMENT PLANNING TOOLS AND TECHNIQUES • Make-or-buy analysis please see PMBOK • Expert judgment • Contract type selection: – Fixed price lump sum contracts – Cost reimbursable contr
Trang 5PROCUREMENT PLANNING
TOOLS AND TECHNIQUES
• Make-or-buy analysis (please see PMBOK)
• Expert judgment
• Contract type selection:
– Fixed price (lump sum) contracts
– Cost reimbursable contracts
– Unit price contarcts
Trang 6• Statements of work (SOW): describes the
procurement item in sufficient detail to allow
Trang 8SOLICITATION PLANNING
TOOLS AND TECHNIQUES
• Standard forms: may include standard contracts, standard descriptions of procurement items,
standardized versions of all or part of the needed bid documents
• Expert judgment:
Trang 9• Evaluation criteria: be used to rate or score
proposals Evaluation criteria are often included aspart of the procurements documents
• Statement of work updates
Trang 12SOLICITATION
OUTPUTS
• Proposals: seller-prepared documents that
describe the seller’s ability and willingness to provide requirements of the relevant
procurement documents
Trang 14– Rating the prospective sellers on each criterion
– Multiplying the weight by the rating
Trang 15SOURCE SELECTION
OUTPUTS
• Contract: A contarct is a mutually binding
agreement which obligates the sellers to provide the specified product and obligates the buyers to pay for it
Trang 16• Seller invoices: The
sellers must submit
invoices from timeto
Output of Source
Selection
Trang 17CONTARCT ADMISTRATION
TOOLS AND TECHNIQUES
• Contract change control system: to define the process by which the contract may be modified:
– Paper work,
– Tracking system,
– Dispute resolution procedures,
– Approval levels necessary for authrizing changes
• Performence reprting:
• Payment system:
Trang 20CONTARCT CLOSE-OUT
TOOLS AND TECHNIQUES
• Procurement audits: to be a structured review of the procurement process from procurement
planning through contarct admistration
Trang 21• Formal acceptance or closure:
– The person or organization responsiblefor contarct administration shouls provide the seller with formal written notice that the contract has been completed – Requirements or formal accptance and closure are
Trang 22A TYPICAL CONTRACT IN PM:
ENGINEERING, PROCUREMENT AND
CONSTRUCTION AGREEMENT
FOR
Trang 251 Definitions.
Trang 292 Phasing
3 Commencing the Work.
4 Contract Documents, Intent, Amending Use
5 Developer's Responsibilities
6 City's Responsibilities
7 Compensation and Payments
8 Title and Risk of Loss
9 Substantial Completion
Trang 3011 Changes
12 Warranties and Guarantees
13 Tests and Inspections
14 Indemnities
15 Insurance
16 Bonds
Trang 3127 Independent Contractor, Other
28 Representations and Warranties
29 Miscellaneous Provisions
30 Apprenticeable Crafts
Trang 3231 Hours of Work
32 Record
33 Non Collusion Affidavit
34 Notices