HPD, HSA, HSB
Trang 2- HPD = Primary Liquid System (~ 340°
- HSA = Secondary Liquid System A (~ 265°
- HSB = Secondary Liquid System B (~ 285°
- HSC = Secondary Liquid System C (~ 200°
- HFD = HTM Filling Line
Trang 3Heat Transfer Medium (HTM)
DIPHENYL OXIDE (73.5%)and BIPHENYL (26.5%)
than the mixture; Diphenyl oxide = 26 27°C / Biphenyl = 68 70°C Eutectic mixture = 12°
- Typical HTM synonyms:
Solutia:
Trang 4- HTM is filled from 2
- Dewatering for at least 3 days at 150 - 160°
heating problems
Trang 5filling valves to poly (consumers such as HTM evaporators) are closed
Trang 6- Open nitrogen blanketing of expension vessel 61D2
expansion vessel 61D2
until 61LSL2
- Put nitrogen blanketing control valve 61PIC211 in operation
Trang 7filling line
Trang 8Example of primary HTM distribution system
Trang 9Example of secondary HTM distribution system
Trang 10~ 340°
~ 305°
~ 290 °
before
Trang 11Uhde Inventa-Fischer