Slide 19c2 Conceptual Design, FEED and Detailed Design Definition I think the exact definition of the outcome of each design stage may vary, depending on company and industry, but here'
Trang 1Gi ng viên: Ths.Ks L ng v n C nh
TEL: 091.380.3800 EMAIL: luongvancanh@hcm.vnn.vn
Trang 4ph i đ n bù thi t h i do l i c a mình gây ra.
- Ch đ ng ti p c n đ h i nh p thông l và t p quán
Qu c t , khu v c v QLCLCTXD.
Trang 55
Trang 6GIAO THÔNG
6
Trang 7C P II
C P III
C P IV
7
Trang 8C quan QLNN v CLCTXD ch u trách nhi m v tình hình ch t l ng công trình xây d ng thu c ph m vi đ c phân c p QL.
Trang 9C U
C A
C§ T
V N B N QPPL
V N B N QPKT
Trang 10B XÂY D NG (C C G NN V CLCTXD)
UBND C Á C T NH (S XD, )
BÁO CÁO B V TÌNH HÌNH CH T L NG CÔNG
Trang 11QLCL thi công
QLCL B o hành
QLCL B o
trì
Giám sát thi công c a Ch đ u t ho c c a Nhà th u
giám sát thi công xây d ng
th c hi n Giám sát tác gi thi t k , tham gia nghi m thu công
trình theo yêu c u c a Ch đ u t
Trang 13N i dung Báo cáo kh o sát xây d ng
1 N i dung báo cáo k t qu kh o sát xây d ng g m:
a) N i dung ch y u c a nhi m v kh o sát xây d ng;
b) c đi m, quy mô, tính ch t c a công trình;
c) V trí và đi u ki n t nhiên c a khu v c kh o sát xây d ng;
d) Tiêu chu n v kh o sát xây d ng đ c áp d ng;
Trang 14 Trong quá trình thi t k , nhà th u thi t k phát hi n tài li u
kh o sát không đáp ng yêu c u thi t k ;
Trong quá trình thi công, nhà th u thi công xây d ng phát
hi n các y u t khác th ng nh h ng tr c ti p đ n gi i pháp thi t k và bi n pháp thi công.
B sung nhi m v kh o sát xây d ng (đi u 9)
Trang 15 N i dung giám sát công tác KSXD c a nhà th u KSXD:
+ Theo dõi, ki m tra vi c th c hi n theo ph ng án k thu t KSXD đã
đ c ch đ u t phê duy t;
+ Ghi chép k t qu theo dõi, ki m tra vào nh t ký KSXD.
N i dung giám sát công tác KSXD c a ch đ u t :
+ Ki m tra đi u ki n n ng l c xây d ng c a các nhà th u KSXD
+ Theo dõi, ki m tra v trí kh o sát, kh i l ng kh o sát và vi c th c hi n quy trình kh o sát theo ph ng án k thu t đã đ c phê duy t.
+ Theo dõi và yêu c u nhà th u KSXD th c hi n b o v môi tr ng và các công trình xây d ng trong khu v c kh o sát
Giám sát công tác kh o sát xây d ng (đi u 11)
Trang 16d) Báo cáo k t qu kh o sát xây d ng.
2 N i dung nghi m thu:
sát xây d ng và tiêu chu n kh o sát xây d ng đ c áp d ng;
xây d ng;
đ ng kh o sát xây d ng đã ký k t (theo n i dung c a PL).
Nghi m thu công tác kh o sát xây d ng (đi u 11)
Trang 17a) Nhi m v thi t k , thi t k c s trong d án đ u t xây
d ng công trình đ c phê duy t;
b) Báo cáo k t qu kh o sát xây d ng b c thi t k c s , các
s li u b sung v kh o sát xây d ng và các đi u ki n khác
t i đ a đi m xây d ng ph c v b c thi t k k thu t;
c) Các quy chu n, tiêu chu n xây d ng đ c áp d ng;
d) Các yêu c u khác c a ch đ u t
H s thi t k k thu t ph i phù h p v i thi t k c s
và d án đ u t xây d ng đ c duy t
Trang 183 T i các b c thi t k , NVTK có th đ c b sung phù h p v i đi u ki n
th c t đ đ m b o hi u qu cho d án đ u t xây d ng công trình.
Tr ng h p vi c b sung NVTK làm thay đ i thi t k c s ho c v t t ng
m c đ u t đ c duy t thì ch đ u t ph i báo cáo ng i quy t đ nh đ u t quy t đ nh.
Trang 19Các b c thi t k xây d ng công trình
1 Thi t k xây d ng công trình bao g m các b c: thi t k c
s , thi t k k thu t, thi t k b n v thi công và các b c thi t k khác theo thông l qu c t (khái quát, c s , v t li u, tri n khai,
k thu t, thi công, chi ti t) do ng i quy t đ nh đ u t quy t đ nh khi phê duy t d án Thi t k FEED là thi t k đ c tri n khai giai đo n sau khi d án đ u t xây d ng công trình đ c phê duy t đ làm c s tri n khai thi t k chi ti t đ i v i các công trình
do t v n n c ngoài th c hi n theo thông l qu c t
2. D án đ u t xây d ng công trình có th g m m t ho c nhi u
lo i công trình v i m t ho c nhi u c p công trình khác nhau Tùy theo quy mô, tính ch t c a công trình c th , vi c thi t k xây
d ng công trình đ c th c hi n m t b c, hai b c ho c ba b c
c2
Trang 20Slide 19
c2 Conceptual Design, FEED and Detailed Design Definition
I think the exact definition of the outcome of each design stage may vary, depending on company and industry, but here's a rough definition :
1 Conceptual Design (CD)
Preliminary study performed to define:
Purpose of plant/project Location of plant Overall cost of plant (+/- 30%)
Design deliverables will typically include a design basis with main process parameters defined (=overall plant production requirements etc.), some overall block flow diagrams, a preliminary space study to define overall space requirements and finally an overall cost estimate
The conceptual design is exactly what it says - a concept You have a concept and flesh it out a little - maybe do some preliminary sizing calculations This allows a rough cost estimate to be done (say, +- 30@50%), and the concept can then be compared with other concepts At this stage, you may just have a process flowsheet
An accepted definition of design is: the act of conceiving and planning the structure and parameter values of a system, device, process or evenworks of art Normally, defining the scope (aka definition) of the project is a subject that the relevant authorities of a company must initiate.Basic and detail design are separated by the important step of taking a decision (mainly by the board of directors, BOD) on whether to
continue, expand, momentarily shelve, or altogether abandon a project
The CD will be presented for the BOD who may decide to proceed with a Basic design
The BOD may wish to consult with marketing and financial experts before reaching a decision When discussing a multi-million dollar
(preliminary) project they might have to consider the impact it will have on future company long-range policy and ask for a (present and future) market analysis for the products and raw materials They may then decide to give it a temporary approval and ask for more basic work
to be done as in a pilot plant Or they may finally approve it That's the moment FEED or detail engineering design starts
2 Basic design (BD) or (FEED)
Development of a well defined design package to in order to prove the feasibility and the cost estimate from the CD Cost estimate may typically be refined to +/- 10%, and will be used as the final Go Ahead from the BOD
Furthermore this is the start up package for Detailed Design (DD) In many cases this package may also be used as a tender package for a Design/Construction Contract
Typical deliverables will include:
Trang 21Other overall layouts which may impact process design (e.g Hazardous area classification drawings, Fire zone layouts which may dictate shut down valve requirements etc.)
All of these drawings should preferably be finalised to status AFD (Approved For Design) which means that they are completed in all aspects except for what will be decided in the Detailed Design phase (vents/drains, vendor data etc.)When I say preferably, this is because depending
on project/company strategy, it may well be decided to issue the BD package with a level of completion lower than AFD
Basic design is about 50% process engineering, with about 50% of the process engineering effort being done there Detail design involves much more work from the other disciplines
My summary is: Basic design goes up to process design: Flows, operating conditions, size of equipments, budget costematings, etc Detailled Dsgn covers all details of piping and all works
Basic engineering ,sometimes refered to as FEED, primarily provides preliminary estimates of the facility in other to give the EPCI (Detail engineering,procurement,construction and installation)contractor a basis for bidding As a matter of fact, the basic engineering phase can entailevaluating the EPCI contractors So there can be quite a few loose ends in the design at the end of the Basic which has to be knotted up at theDetailed engineering
Basic engineering = basic study to allow everyone involved to agree on the exact scope of work to be done to solve the problem involved in theproject and put a groos figure on how much it will cost , before going ahead with the detail engineering
Usually, a FEED is required to establish the identity of the total capital costs required in a project – especially if it is to be “project financed” (the financed portion is paid by project generated revenue) Therefore, a FEED is simply an up-front, basic design that suffices only to identify the required resources within an accepted level of accuracy In international project-financed projects, the lending institutions are the ones whoset the level of accuracy required to evaluate a proposed loan Inherently, then, a FEED is not sufficient to specifiy, purchase, install, startup,
or operate a major process The FEED is merely an outline with very basic engineering done It is used to obtain the funds required to carry outthe necessary basic engineering that will yield the final, detailed design that can subsequently be specified, purchased, installed, started up,
Trang 22Slide 19 (Continued)
and operated
Additionally, without detailed engineering done, a lot of project necessities were left unattended and major mistakes and omissions were made Therefore, there may exist other interpretations or needs for a FEED through various parts of the world There is no engineering God or Court that fixes how all engineers should interpret or employ engineering tools Everyone is left to use his/her ingenuity and common sense in applying the natural laws and resources found world-wide
The basis design is the same as FEED (front-end engineering design) as far as I'm concerned You take the concept and do firmer calculations This will be stuff like developing a mass & heat balance, putting together a proper P&ID (Piping & Instrumentation diagram), and doing things like equipment sizing (pumps, vessels, heat exchangers, columns etc.) At this stage you produce equipment specifications
When you have the basid design done (process specifications, P&IDs, heat and mass balance, utility requirements etc.) this package (FEED package) then goes out to the other disciplines (such as piping, civil/structural, electrical, instruments) The main work of the process engineer
in the design is now done However, the disciplines will need to consult you to make sure in their 'detailed' design they actually capture the intent of what you wanted They will keep coming back and asking questions like what should we do with this, or does it matter if we change this, or put this here The detailed stage involves the discipline engineers looking at piping layouts, electrical distribution boxes and what not Basically everything that is required to actually go and build a plant That is the detailed engineering stage
The process engineer in his/her basic design job determines the optimum diameter, the pipeline material of construction, corrosion problems, flow controls, flow regimes, operating conditions, alarms, pipe schedule, thermal insulation, instrumentation, traps, etc
What are the parameters that guide him, economic, safety or environmental considerations, or what? He/she may need the help of a
mechanical engineer to assess the costs of the as-finished work So, the mechanical engineer's work doesn't just cover the detail design stage.Having gathered the necessary information and made the relevant process flow sheets and techno-economic calculations, as the case may be, somebody has to decide on whether this preliminary job is sufficient to proceed or that it may require a further study
Only upon this authority's decision the detail design engineering follows or not
3 Detailed Design
All further design is developed until it reaches AFC status (Approved for Construction)
For process design (assuming the BD outcome was status AFD) remaining work will be limited to verifying that the actual piping layout, the equipment purchased etc is in line with the present process design and incorporate any updates required Typically procurement of main equipment takes place during the detailed design stage and this requires interaction from the process engineer as well as other disciplines.Detail engineering -on the other hand- may need the help of the process engineer, for example, in cases where a HAZOP review may be carried out So, the process engineer is not only in charge of the basic design after all, her/his reponsibilities are spread over both stages, the basic and the detail design Both stages may be coordinated by a project manager himself/herself answering to the job-commissioning
authority
Trang 23Thi t k xây d ng công trình g m thi t k c s , thi t k k thu t, thi t k
b n v thi công và các b c thi t k khác theo thông l qu c t
Thi t k c s đ c l p trong giai đo n l p d án đ u t xây d ng công trình; các b c thi t k ti p theo đ c l p trong giai đo n tri n khai th c
hi n d án đ u t xây d ng công trình.
Tu theo quy mô, tính ch t, công trình xây d ng có th đ c thi t k m t
b c, hai b c ho c ba b c nh sau:
1 Thi t k m t b c là thi t k b n v thi công;
2 Thi t k hai b c bao g m b c thi t k c s và thi t k b n v thi
công;
3 Thi t k ba b c bao g m b c thi t k c s , thi t k k thu t và thi t
k b n v thi công.
Trang 245.D toán xây
d ng công trình
Trang 251 H s thi t k đ c l p cho t ng công trình bao g m:
1 Thuy t minh thi t k ,
2 Các b n v thi t k ,
3 Các tài li u kh o sát xây d ng liên quan,
4 Quy trình b o trì công trình,
2 H s thi t k xây d ng công trình ph i đ c l u tr theo quy
đ nh c a pháp lu t v l u tr
Trang 262 Thi t k b n v thi công ph i đ c ch đ u t ho c đ i di n đ c u quy n c a ch đ u t xác nh n b ng ch ký và đóng d u đã phê duy t theo
m u Ph l c 5 vào t ng t b n v tr c khi đ a ra thi công Ch đ u t có
th thuê t v n giám sát thi công xây d ng ki m tra thi t k b n v thi công
và ký xác nh n trong b n v tr c khi phê duy t.
3 Ch đ u t có th thuê t v n th m tra thi t k k thu t, thi t k b n v thi công (k c trong tr ng h p thi t k ba b c) m t ph n ho c toàn b các n i dung th m đ nh nêu t i kho n 1 i u 18 Ngh đ nh 12/2009/N -CP
đ làm c s cho vi c th m đ nh, phê duy t K t qu th m tra đ c th hi n
b ng v n b n và không thay th cho vi c th m đ nh c a ch đ u t
Trang 28Ng i quy t đ nh đ u t t ch u trách nhi m v vi c th m đ nh thi t k c
s Trong n i dung phê duy t ph i xác đ nh rõ các gi i pháp thi t k c s
c n tuân th và cho phép ch đ u t đ c thay đ i trong các b c thi t k
ti p theo
- S phù h p c a thi t k k thu t v i thi t k c s ;
- S h p lý c a các gi i pháp k t c u công trình;
v i công trình có yêu c u công ngh ;
Trang 29a) i t ng nghi m thu (tên công trình, b ph n công trình đ c thi t
k ; b c thi t k );
b) Thành ph n tr c ti p nghi m thu (ch đ u t , nhà th u thi t k );
c) Th i gian và đ a đi m nghi m thu;
Trang 30 C n c nghi m thu h s thi t k xây d ng công trình:
a) H p đ ng giao nh n th u thi t k xây d ng công trình;
b) Nhi m v thi t k , thi t k các b c tr c đó đã đ c phê duy t;
c) Quy chu n, tiêu chu n xây d ng đ c áp d ng;
d) H s thi t k xây d ng công trình g m thuy t minh, b n v thi t k và
d toán, t ng d toán, quy trình b o trì, tài li u kh o sát.
N i dung nghi m thu:
a) ánh giá ch t l ng thi t k ;
b) Ki m tra hình th c và s l ng h s thi t k xây d ng công trình.
C n c nghi m thu h s thi t k
Trang 31 Thi t k xây d ng công trình đã đ c phê duy t ch đ c thay đ i
trong tr ng h p sau đây:
+ Khi d án đ u t xây d ng công trình đ c đi u ch nh và có yêu c u
ph i thay đ i thi t k ;
+ Trong quá trình thi công n u phát hi n th y nh ng y u t b t h p lý
n u không thay đ i thi t k s nh h ng đ n ch t l ng công trình,
ti n đ thi công xây d ng, bi n pháp thi công và hi u qu đ u t c a
d án.
Tr ng h p thay đ i thi t k k thu t nh ng không làm thay đ i thi t
k c s ho c thay đ i thi t k b n v thi công mà không làm thay đ i thi t k b c tr c thì ch đ u t đ c quy t đ nh phê duy t thay đ i thi t k Nhà th u giám sát thi công xây d ng đ c ký đi u ch nh vào thi t k b n v thi công nh ng n i dung đã đ c ch đ u t ch p thu n và ph i ch u trách nhi m v quy t đ nh đi u ch nh c a mình.
Thay đ i thi t k xây d ng công trình (đi u 17)
Trang 32 Trong quá trình thi công xây d ng, nhà th u l p thi t k k thu t đ i v i
tr ng h p thi t k ba b c và nhà th u l p thi t k b n v thi công đ i
v i tr ng h p thi t k m t b c ho c hai b c ph i th c hi n giám sát tác gi Nhà th u thi t k c n th a thu n v i ch đ u t v các tr ng
h p ch m d t vi c giám sát tác gi trong h p đ ng thi t k xây d ng công trình.
Nhà th u thi t k xây d ng công trình c ng i đ n ng l c đ th c hi n giám sát tác gi trong quá trình thi công xây d ng theo ch đ giám sát không th ng xuyên ho c giám sát th ng xuyên n u ch đ u t có yêu
c u riêng.
Trang 33a) Gi i thích và làm rõ các tài li u thi t k công trình khi có yêu c u c a ch
đ u t , nhà th u thi công xây d ng, nhà th u giám sát thi công xây d ng; b) Ph i h p v i ch đ u t khi đ c yêu c u đ gi i quy t các v ng m c, phát sinh v thi t k trong quá trình thi công, đi u ch nh thi t k phù h p v i
th c t thi công xây d ng công trình và v i yêu c u c a ch đ u t khi c n thi t;
c) Phát hi n, thông báo k p th i cho ch đ u t ho c c quan qu n lý nhà
n c có th m quy n v vi c thi công sai v i thi t k đ c duy t và ki n ngh
Trang 34Qu n lý ch t l ng thi công xây d ng
Nhà th u thi công xây d ng ph i có h th ng qu n lý
ph m do mình làm ra (đi u 19, 20).
và t ch c nghi m thu công trình (đi u 31).
hi n giám sát tác gi (đi u 22).
Trang 38 L p và ki m tra bi n pháp thi công.
L p và ghi nh t ký thi công xây d ng công trình.
L p và ki m tra bi n pháp đ m b o an toàn lao
đ ng, an toàn môi tr ng.
Nghi m thu n i b , l p h s , phi u yêu c u ch
đ u t nghi m thu.
Trang 39Qu n lý ch t l ng thi công xây d ng c a nhà th u (đi u 19)
Trang 40- K ho ch t ch c thí nghi m và ki m đ nh ch t l ng; quan tr c, đo đ c các thông s k thu t c a công trình theo yêu c u thi t k