1. Trang chủ
  2. » Kỹ Năng Mềm

Exit project evaluation rubric

2 551 0

Đang tải... (xem toàn văn)

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Định dạng
Số trang 2
Dung lượng 37,29 KB

Các công cụ chuyển đổi và chỉnh sửa cho tài liệu này

Nội dung

This time needs to be scheduled with the Senior Advisor well in advance to avoid conflicts.. Failure to submit the project before the target date will result in additional documented hou

Trang 1

Paper % _ Rank _ Project % _ Rank _

Exit Project Evaluation Rubric

Họ tên SV _ Tên Project Họ tên GV _

Tất cả Project phải được gởi cho Giáo viên trong thời gian kết thúc dự án Thời gian này cần được đưa ra bởi GV để tránh mâu thuẫn All projects must be submitted to Senior Advisors by the assigned deadline This time needs to be scheduled with the Senior Advisor well in advance to avoid conflicts Failure to submit the project before the target date will result in additional documented hours on the Exit Project

Planning and Time Management: This score indicates the amount of time spent planning the project and the effectiveness of time

management skills throughout the completion of the project (meeting assigned deadlines, turning in paperwork, etc.).

PLANNING &

TIME

MANAGEMEN

T

No evidence of planning

Procrastination lead to incomplete project

Little planning or forethought Project hastily completed for deadline

Basic planning and time management needs necessary for project completion met

Planning and time management exhibited enhance the overall project

Exhibits a professional level

of planning and time management

Comments:

Points Possible: 5

Score

Time and Effort: This score indicates the amount of time and effort the student expended completing the project.

TIME AND

EFFORT

No evidence of effort

Little or no “authentic”

time spent on project

Minimal effort Met minimum time requirements and didn’t complete project

Meets basic time and effort required to complete project

Time and effort expended on project enhances the overall project

Exhibits a professional level

of time and effort expended on project

Comments:

Points Possible: 5

Score

Evidence of Learning and Risk Factor: This score indicates the level of knowledge gained by the student evident through the project,

and the extent to which the student was “stretched” or took risks through the project experience.

EVIDENCE OF

LEARNING

AND RISK

FACTOR

No evidence of genuine learning

Student never stretched their knowledge/capabilities

Little demonstration of genuine learning;

limited risks taken

Project demonstrates genuine learning/risks were taken for expand-ing knowledge and skills

Project and project experience clearly

“stretched” student knowledge and skills

Student took several risks to achieve a superior level of knowledge and skills through the project process

Comments:

Points Possible: 5

Score

Updated: April 20, 2011

Trang 2

Project Ranking Key

less

Degree of Difficulty: This score indicates the variety and complexity of the components to completing the project.

DEGREE OF

DIFFICULTY

Project incomplete

Not age-appropriate difficulty

Little degree of difficulty evident One dimensional project

Project comprised of more than one component of appropriate difficulty

Project comprised

of multiple components or components exhibit great difficulty

Project complexity approaches professional quality

Comments:

Points Possible: 5

Score

Portfolio Preparation: This score indicates the quality of the portfolio.

PORTFOLIO

PREPARATION

Missing portfolio Incomplete portfolio

Some required sections missing

Portfolio has major formatting and/or many spelling errors

Portfolio complete with several minor errors

Portfolio complete with very few minor errors Contents concise and accessible

Portfolio clear, concise, accessible, with unique content

No formatting or spelling errors

Comments:

Points Possible: 5

Score

Quality of Final Project: This score indicates the actual quality of the physical product or quality of the project experience, with

“professional” quality being a score of 5.

QUALITY OF

FINAL

PROJECT

No physical project or documentation of project experience

Little concern for project quality or incomplete project

Project completed but demonstrates low quality

Project demonstrates appropriate quality

High quality project illustrates student work ethic

Professional quality product or project experience

Comments:

Points Possible: 5

Score

Comments:

Ngày đăng: 10/08/2016, 15:47

TỪ KHÓA LIÊN QUAN

w