Student: PHAN HUY TRƯỜNG
FOR EXAMINERS ONLY
Grade (in number):
Trang 2Semester: II Academic year: 2021-2022
Lecturer: Assoc Prof Dr
Ho Chi Minh City, October 2021
Trang 3module.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignment
Trang 4STATUTORY DECLARATION
Except for where reference is discussed in the text of the end- module assignment, this assignment does not include materials and technical support published or extracted from any other assignments which I have submitted or qualified for another degree or certificate.
No other people’s contribution has been used or stolen without any acknowledgement in this assignment.
I am aware of the fact that violations of copyright can lead to injunctive relief and claims for damages of the author as well as a penalty by the law enforcement agency.
Hồ Chí Minh, 21th Junuary, 2022
Phan Huy Trường
Trang 5module.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignment
Trang 6III Statement of work
III.1 “PP, PE and HDPE granule recycling machine”
III.2 Plastic Scrap Crusher
IV Agree timescales for the management and implementation of a project (project scheduling)
IV.1 Definition of work breakdown structure(WBS):
IV.2 Application of WBS in project:
V Plan an appropriate strategy for the implementation of a project
5.1 Strategy for implementation of Co-BRARS
5.2 Strategies for risk management of Co-BRARS project
VI Match appropriate resources to a project ( OBS, time-phased budeget)
6.1 Definition of organizational breakdown structure 6.2 Organizational breakdown structure in Co-BRARS project
VII Cost all resources required for implementing a project (cost estimation and budgeting)
VII.1 Fixed cost VII.2 Variable cost
VIII Reference
Trang 7module.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignment
Trang 8FINAL ASSIGNMENT:
I Introduction:
I.1 The Coca-Cola Company:
The Coca-Cola Company is an American multinational beverage corporation incorporated under Delaware's General Corporation Law and headquartered in Atlanta, Georgia The Coca-Cola Company has interests in the manufacturing, retailing, and marketing of non-alcoholic beverage concentrates and syrups, and alcoholic beverages The company produces Coca-Cola, the sugary drink for which it is best known for, invented in 1886 by pharmacist John Stith Pemberton At the time, the product was made with coca leaves, which added an amount of cocaine to the drink, and with kola nuts, which added caffeine, so that the coca and the kola together provided a stimulative effect This stimulative effect is the reason the drink was sold to the public as a healthy "tonic", and the coca and the kola are also the source of the name of the product and of the company.
The company has operated a franchised distribution system since 1889 The company largely produces syrup concentrate, which is then sold to various bottlers throughout the world who hold exclusive territories
Founder: Asa Griggs Candler
Founded: January 29, 1892, Atlanta, Georgia, USA
CEO: James Quincey (May 1, 2017–)
Headquarters: Atlanta, Georgia, USA
The company's stock is listed on the NYSE (NYSE: KO)
Trang 9module.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignment
Trang 10- We all know that plastic is extremely difficult to break down.
When burned, plastic waste will produce dioxins, furans, which pollute the air, cause poisoning, affect endocrine glands, reduce immunity, cause cancer, etc.
When burying, plastic waste will make the soil unable to retain water and nutrients and prevent oxygen from passing through the soil, adversely affecting the growth of plants Furthermore, it can contaminate water sources, causing the death of beneficial microorganisms that live underground.
Plastic waste causes "white pollution" at tourist destinations, affecting people's rest and relaxation space
va-hau-qua-doi-voi-moi-truong-c9858-43858.aspx
https://tytxaxuanthoithuong.medinet.gov.vn/ve-sinh-moi-truong/rac-thai-nhua-tac-hai For example, in Ho Chi Minh City, Vietnam, out of 250,000 tons of plastic waste, 48,000 tons are landfilled, more than 200,000 tons are recycled or discharged directly into the environment.
nam.html
https://anphatholdings.com/hoat-dong-moi-truong/thuc-trang-rac-thai-nhua-o-viet According to cafebiz, a reputable news site, Cocahttps://anphatholdings.com/hoat-dong-moi-truong/thuc-trang-rac-thai-nhua-o-viet Cola is accused of having the highest total amount of plastic waste in beverage brands, even more than the total plastic waste of Nestle, PepsiCo and Mondelez combined.(06.11.2019)
gioi-nhieu-hon-tong-rac-nhua-cua-nestle-pepsico-va-mondelez-cong-lai-
https://cafebiz.vn/coca-cola-la-thu-pham-gay-o-nhiem-rac-thai-nhua-nhieu-nhat-the-20191106103351329.chn
Trang 11module.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignment
Trang 12 Although coca has solutions to limit the amount of plastic waste as well as waste, these solutions are not really effective or bring absolute benefits to the environment.
Our mission: (Need statement)
Provide high-quality product
Get customer’s satisfaction “from product to society”.
Build a plastic and glass bottle recycling system Solutions that Coke applied:
Convert plastic products to glass.
Paying the consumer if the plastic bottle is returned
Print "Please recycle me" on the product
Most recently, on January 11, 2022, Coke cooperated with the ocean cleanup organization to collect waste by interception 003 system.
tai-viet-nam-post1289042.html
https://zingnews.vn/coca-cola-hop-tac-the-ocean-cleanup-giam-rac-thai-nhua- hop-tac-giai-quyet-o-nhiem-nhua-tai-Vietnam-2022
https://www.cocacolavietnam.com/news/Coca-Cola-va-The-Ocean-Cleanup- Our project : Coca cola bottle recycling and reuse system(Co-BRARS) in
HoChiMinh city
II Analysis the process of project selection (the agreed criteria, approaches to project screening)
Factors contributing to the project selection process:
Must be friendly with nature: …
Trang 13module.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignment
Trang 14( https://maynhuavietdai.com/quy-trinh-tai-che-nhua-thanh-cong-nhat-the-gioi )
III Statement of work(SOW):
Because Indonesia is in the top of countries with the largest amount of plastic waste in the world and is also implementing a plastic waste recycling project that will go into operation in 2022 We can rely on that to also implement this project.
a) Stakeholders:Coca-Cola Vietnam, the Ocean Cleanup and GEF
Investment cost support
Project technical support
Guaranteed uptime.
b) Consultant engineer: The Ocean Cleanup
Provide system design
Check machine operation
Modification to suit environmental conditions c) Project manager: Coca-ColaVietnam
Human resource management
Cost and time management
Operation period starts from September 2022
The collection and recycling of plastic waste must comply with the regulations of the Environmental Protection Agency in Vietnam e) Deliverable:
Contract signed with the Ocean Cleanup and GEF( receive donation)
System and facilities transportation
Installing system
Finishing system
Training and testing the operation of Co-BRARS before handing it
Recycled Bottles
Grinding
Chemical process Washing
Trang 15module.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignmentmodule.operation.project.management.code.final.assignment
Trang 16f) Milestone:
Step 1: Meeting about Co-BRARS project and list project specification in detail
Machine type
Small scale system testing
Installation location of system
Installation time, Start date and longevity of machine
Total cost of installation Step 2: Negotiating with investors and fund organization
Pricing and cost calculation
Contract & payment (construction cost payment schedule/timeline)
Issurance( maintainance and warrantly)
A number of workers/managers/contractors/supervisors/ and so on.
Finish contract
Step 3: Collection and transportion
The Ocean Cleanup is responsible for collection of mixed plastic bottle
GEF supports funds for project operation
Preparation for all related to juridical documents, including tax, worker salary, accounting, costs incurred, risks, and so on.
How to save money in transportation procedure Step 4: Operation procedure and installation
Clearing custom
Materials for system
Installation of Co-BRARS unit, crusher, sterilization/fumigation machine and casting machine.
Step 5: Final part of contract
Training and testing the procedure of system
User manual for management of coca
Handing over the system g) Some machine specifications:
1.1 “PP, PE and HDPE granule recycling machine”
Working principle: After sorting, the plastic waste will be put through the crusher, then the plastic will be chopped into small pieces and put into the feeding hopper of the machine.
Here, the plastic scrap passing through the screw system is heated
in an increasing direction, causing the plastic scrap to melt The molten plastic to the end of the tip will pass through 1 or more layers of metal mesh filter and then be pressed through the mold into a long thread Finally, the plastic fiber is cooled suddenly through a cooling