THESIS PROPOSAL Master of Business Administration
Trang 1THESIS PROPOSAL
Master of Business Administration
Advisor: Dr Shu-Cheng Lee Co-advisor: Dr Nguyễn Thanh Liêm Student: Nguyễn Văn Tâm
ID: 11752329
September, 2012
Trang 2 I graduated from Danang
University of Technology
I am working at Hydropower
Project Management Board 3 –EVN
Position: Manager of Material and
Equipment Department
I have one son only, he is 8 year
old
About me
Trang 3Outline of this talk
Thesis Title: Applying project management performance assessment (PMPA) model to analyse the effects of influential factors on project management performance in HPMB3
Trang 4 Overview of project:
A prerequisite and impulsive element of
the development of a corporate, a
country
Efforts to create desired products and
services with limited time and resources
Research Background
VietNam Law : “An investment project is a set of proposals relating to spend capital on creating, expanding or improving certain facilities in order to achieve the growth in quantity or maintain, improve, enhance quality of products or services within certain time”.
Trang 5 Basic attributes of project:
Determined purpose and result
Its own growth cycle and limited life time
Project product is unique, unprecedented
Operation environment is colliding, unstable and risky
Complicated correlations between functional management and project management
Research Background
Trang 6 Overview of project management:
The application of knowledges, skills,
tools, techniques into project performance
in order to meet demand from a project
The process of overall planing,
coordinating time, resources and
monitoring achieving project’s goals
Research Background
Unrepeated process, absolutely different to manage daily work at a production company or a factory
Trang 7 Over view of project management (cont):
The distinction between project performance (PP) and project management performance (PMP)
The project management performance enhancement is a key factor guaranteeing the success of a project
Performance is an intangible thing and hard identification,
so that choosing exact tools for assessing project performance to enhance PMP of corporation is a challenge
Research Background
Trang 9 Hydro Power Management Board No.3 (HPMB3)
Vietnam Electricity (EVN) is a state corporation
+ Investors of many major electricity project
+ 66% of total power capacity of Vietnam electricity system with 38% power capacity from hydropower
HPMB3 is a member of EVN, assigned to manage construction
of hydropower projects in the central region of Vietnam
The project managements in HPMB3 mention to monitoring and assessing results of PP but do not mention to PMP
Research Background
Trang 10 PMPA model, which was proposed by Bryde et al and examined by Tahir.M.Q et al, has positive impact on PMP and used as a framework to assess PMP of a corporation
The application of PMPA models to assess operational efficiency of project management have done by developed countries but not antecedent in Vietnam
The study of applying PMPA model to analyse the effect of influential factors on project management performance of project management boards in Vietnam is neccessary This research is also becoming an urgent demand in HPMB3
Research motive
Trang 11 The purpose of this research studies applying PMPA model to analyse the effect of influential factors on PMP, whereby we propose solutions enhancing project management performance in HPMB3
Research purpose
Understand project management knowledge
of the world and Vietnam.
Identify the effects of influential factors on
PMP in HPMB3
Propose solutions improving PMP in
HPMB3
Trang 12Research Procedure
Define the research problem
Review literature
of PMP and models
Choose a research model
Propose hypothesis
Design and delivery questionnaires
Collect and analyze data
Interpreter
and report
findings
Introduction
Trang 13 Project management
Project management performance
Performance assessment
Influential factors
Hydropower project management
Performance assessment model
Literature Review
Keywords:
Trang 14Literature Review
Prior researches towards project have been conducted
by Atkinson.R (1999); Barad.M, Raz.T (2000), etc
Prior researches towards project management have been conducted by Loo.R (1996); DeWitt.A (1998); Bryde.J.D (2003), etc
For finding influential factors to effect the success of a project in a chain of works of project management progress, many researches have been conducted as: Munns.A.K, Bjeirmi.B.F (1996); Westerveld.E (2003); Bryde.J.D (2003), etc
Prior researches towards PM and PMP:
Trang 15Literature Review
The European Foundation for Quality Management (EFQM) excellence Model, which can be used to assess
an organization’s progress towards excellence
PMPA model proposed by Bryde et al, which is customize shape of EFQM model for assessment of project management performance of an organisation
The study of Tahir.M.Q et al about significance of PMPA Model
The study’s findings indicated that PMPA model can be used as a framework to assess PMP.
Prior researches model towards PMP:
Trang 162003 Int J Quality
Reliab Manage Bryde JD Project management concepts, methods and
application
2003 Int J Quality
Reliab Manage Westerveld.E The Project Excellence Model1: linking
success criteria and critical success factors
2003 International
Journal of Project Management Barbara N
U, Hans G.G,
Monique
The three roles of a project portfolio management office: Their impact on portfolio management execution & success.
2012 diito
Trang 17Pa¨ivi
Lehtonen
Role of single-project management in
achieving portfolio management efficiency
Daniel J Empowering project portfolio managers:
How management involvement impacts project portfolio performance
2010 ditto
Trang 18Literature Review
Reference researches
Authors Research Year Journal
Angela.C A practical use of key success factors to
improve the effectiveness
of project management
1999 International
Journal of Project Management
Atkinson.R Project management: cost, time and quality,
two best guesses and a phenomenon, its time to accept other success criteria
1999 ditto
Trang 19Research Methods
PMPA Model:
Trang 20PR: Partnerships and Resources.
PLC: Life Cycle Process
KPIs: Key Performance Indicators
H3
H1 H2
H6 H5 H4
Trang 21Research Methods
Variables
Trang 22Research Methods
Hypothesis:
H1: The PM Leadership has positive effect over the PMP
H2: The PM Staff has positive effect over the PMP
H3: The PM Policy and Strategy have positive effect over the PMP
H4: The PM Partnership and Recourses have positive effect over the PMP
H5: The PM Life Cycle Process has positive effect over the PMP
H6: The PM Key Performance Indicators have positive effect over the PMP
Trang 23Survey Object: HPPMB3 staffs
and project partner
Questionnaires: 5 point Likert
Scale is used
Trang 24Research Methods
Survey method (cont):
Questionnaires consisting of 1 dependent variables (PMP) and 6 independent variables (L, S, PS, PR, PLC, KPIs)
Questionnaire was developed depending influential factors on PMP and there are some supplement element
150 questionnaires will be delivery to questionereds throught 2 ways:
- Sending questionnaires directly to HPPMB3 staff and project partner
- Sending questionnaires to their e-mails and request to answering questions by telephone (if any)
Trang 25Research Methods
Response rate of questionnaires:
After data collection, I will code data in
Excel 2003 and SPSS16.0 For calculating
results, Multiple Regression analysis and
Pearson Correlation are used
If collected data is not enough 150 samples as I expect, I will check to explain suitably Incase neccesary, I will try to send questionnaires more to collect data, do not design data
by random by myself
Trang 26Research Methods
Description of the statistical analysis method:
Descriptive Statistic: Collect and calculating data following percent quantitive of 5 point of questionnaires
Factor Analysis: Collect small variables into vector (L, S,
Trang 27Research Methods
The Equation of Regression:
The Equation of Regression can be described: Y~f(X,Y)
Where: X is independent factor; Y is dependent factor
The multiple Linear Regression equation testing are following:
Y = α + β1(x1)+β2(x2)+β3(x3)+β4(x4)+β5(x5)+β6(x6)+ε
PMP = α + β1(L)+β2(S)+β3(PS)+β4(PR)+β5(PLC)+β6(KPI)+ε
Trang 28Other than that, PMPA model may be used as a framework for assessing project management performance (PMP) for project management board in Vietnam.
Expected Results and Contributions:
Trang 29Concluding Remark
Progress and Following Schedule :
Time to Complete Activities
Year Months
2012 Aug + Study Tour to STU/Thesis Proposal Meeting
+ Write a draft chapter 1 Introduction and chapter 2 Literature review
Sep Chapter 1 & 2 completed Oct Chapter 3 Research model completed Nov Chapter 4 Research Results completed Dec Chapter 5 Conclusion completed
2013 Jan Full thesis completed and submitted
Application for thesis oral defense Feb Oral defense
Mar + Thesis revision
+ Thesis finalization
Trang 31Reference list (cont)
8 Daniel J (2010).Empowering project portfolio managers: How management involvement impacts project portfolio management performance International Journal of Project Management,28,818–831.
9 Barbara N U, Hans G.G, Monique A (2012).The three roles of a project portfolio management office: Their impact on portfolio management execution and success International Journal of Project Management ,30, 608–620.
10 Angela C (1999).A practical use of key success factors to improve the effectiveness
of project management International Journal of Project Management Vol 17, No 3,
13 Veridiana.R P, Marly.M (2009) Evaluating project manager performance: a case study.Product: Management & Development Vol 7 nº 1.
14 Barad M, Raz T Contribution of quality management tools and practices to project
Trang 32Questionnaires consisted of using 5 points Likert scale: (1)= strongly disagree; (2) = disagree; (3) = neutral; (4) = agree; (5) = strongly agree].
Trang 33Years experience in project management environment
Please circle one number per the questionnaire which you agree or disagree with the following statements.
A Project management performance (PMP)
1 Leadership play a very critical role in project management 1 2 3 4 5
2 Planning, Managing, reward and recognition play important role in project management 1 2 3 4 5
3 Better the Policy and Strategy, will be better for the project management 1 2 3 4 5
4 Stronger partnership with the stakeholder, leads to good project management 1 2 3 4 5
5 Clear and comprehension description of the process is important in project management 1 2 3 4 5
6 Good key performance indicators usually result of better project management 1 2 3 4 5
B PM Leadership (L)
1 A project is a motive for all business change within an organization 1 2 3 4 5
2 Project focused meetings are held in our organization 1 2 3 4 5
3 Project ideas/information is freely shared by all 1 2 3 4 5
4 A common project language is shared by all 1 2 3 4 5
Trang 34Appendix
Questionnaires form (cont):
C Project management Staff (S)
1 Organization-wide training in project management 1 2 3 4 5
2 Formal processes/procedures are used, helping us to better manage our projects 1 2 3 4 5
3 Formal processes/procedures are used, but add little value 1 2 3 4 5
4 Formal processes/procedures are not used 1 2 3 4 5
5 Is there a formal process for selecting people to work in project teams? 1 2 3 4 5
6 There is formal process linking training to career development 1 2 3 4 5
7 My performance evaluation is built into the project management process 1 2 3 4 5
of individual projects
D Project management policy and strategy (PS)
1 The benefits of project management are being promoted 1 2 3 4 5
2 A company-wide project management system with centralized control is being set up 1 2 3 4 5
3 Redefining of jobs 1 2 3 4 5
4 Organization-wide project management methods 1 2 3 4 5
5 Quality management system accreditation 1 2 3 4 5
6 Policy of recognition for developing skill s in project related work 1 2 3 4 5
7 Employee empowerment policy 1 2 3 4 5
8 Change in company ownership 1 2 3 4 5
9 Business process reengineering 1 2 3 4 5
Trang 35Appendix
Questionnaires form (cont):
E PM partnership recourses
1 Partnerships with customers exist 1 2 3 4 5
2 Partnerships with suppliers exist 1 2 3 4 5
3 Internal stakeholder 1 2 3 4 5
4 External stakeholder 1 2 3 4 5
5 Project sponsor
F PM life cycle process (PLC)
1 Conception/initiation of a project idea 1 2 3 4 5
2 Project selection/prioritization 1 2 3 4 5
3 Project start-up 1 2 3 4 5
4 Defining of benefits, goals, objectives 1 2 3 4 5
5 Control and suppervisor a project process 1 2 3 4 5
Trang 36Thank you!
3