1. Trang chủ
  2. » Giáo Dục - Đào Tạo

(TIỂU LUẬN) POWER CONVERTER DESIGN AND ATS AUTO GENERATOR CONTROL (AUTOMATIC TRANSFER SWITCH )

14 4 0

Đang tải... (xem toàn văn)

Tài liệu hạn chế xem trước, để xem đầy đủ mời bạn chọn Tải xuống

THÔNG TIN TÀI LIỆU

Thông tin cơ bản

Tiêu đề Power converter design and ATS auto generator control (Automatic Transfer Switch)
Tác giả Phạm Hữu Thanh
Người hướng dẫn TS. Nguyễn Trí Cường
Thể loại Tiểu luận
Định dạng
Số trang 14
Dung lượng 4,57 MB

Các công cụ chuyển đổi và chỉnh sửa cho tài liệu này

Nội dung

POWER CONVERTER DESIGN AND ATS AUTO GENERATOR CONTROL AUTOMATIC TRANSFER SWITCH • Phạm Hữu Thanh TEACHER: TS.Nguyễn Trí Cường... I INTRODUCE4 During operation, some common problems may

Trang 2

POWER CONVERTER DESIGN AND ATS AUTO GENERATOR CONTROL

(AUTOMATIC TRANSFER SWITCH )

• Phạm Hữu Thanh

TEACHER: TS.Nguyễn Trí Cường

Trang 3

CONTENT 3

1

2

3

4

INTRODUCE

ALGORITHM DESIGN

RESULT

CONCLUSIONS AND FUTUREWORK

Trang 4

I INTRODUCE

4

During operation, some common problems may occur such as:

power failure, phase loss, voltage drop, overvoltage, phase difference, phase imbalance, noise on the line,

Trang 5

When there is a power outage on the grid, special loads will require an

alternate backup power source.

What is an ATS system?

An automatic power transfer device, also known as ATS (Automatic

Transfer Switch) is used to automatically transfer the load from the main

power source to the backup source when the main source fails and vice

versa when the main power is restored or switched intentionally.

Trang 6

ATS structure with main grid – 2

backup generators

This construction allows two generators to work

alternately or in parallel, resulting in higher power

generation efficiency and longer traction motor life.

II INTRODUCE

The following requirements must be followed during operation: :

Trang 7

Only startup one to three times each power outage.

After the engine has successfully operated for 5

to 7 seconds, the starter must be turned off.

Before putting oil into the combustion chamber of

an engine, it must be dried.

It is vital to avoid repeated beginning when the

mains voltage fluctuates or the grid voltage flickers

Diesel generator When stopping, you'll need some time to cool off.

Trang 8

ALGORITHM DESIGN

Manual

mode

8

Auto mode

Trang 9

Time diagram in case of power on after 5 hours Time diagram in case of power on after 5 hours

Time diagram in case the generators do not power up

Trang 10

IV RESULT

Trang 11

CONCLUSION

 The results of the performed test ensure the ATS-design’s functioning and compliance with requirements and constraints

 Our design is appropriate for the subject of Project II and at a cheaper cost

FUTURE WORK

 In future work, we will broaden our approach by incorporating additional features such as display and monitoring on the webserver or the HMI.

Trang 12

THANK YOU ! Reference

Review of Economics and Statistics, pp.1-78, 2018

1471-1478, 2010

[3] N Mohan, Electric Power Systems: A First Course Wiley, 2012 [4] D L Ransom, ”Choosing the Correct Transfer Switch,” IEEE Trans Ind Appl., vol 49, no 6, pp 2820-2824, 2013

[5] H Zheng, Y Cheng, B Gou, D Frank, A Bern, and W E Muston,

”Impact of automatic switches on power distribution system reliability,” Electr Power Syst Res., vol 83, no 1, pp 51-57, 2012

[6] P M Curtis, ”Automatic Transfer Switch Technology, Application, and Maintenance,” in Maintaining Mission Critical Systems in a 24/7 Environment, IEEE, 2007, pp 89-111

[7] B Tian et al., ”400 V/1000 kVA Hybrid Automatic Transfer Switch,” IEEE Trans Ind Electron., vol 60, no 12, pp 5422–5435, 2013

[8] FX3G SERIES PROGRAMMABLE CONTROLLERS HARDWARE MANUAL

[9] Everlasting company, ”Operation and Maintenance Manual for Diesel

Generator Sets ” [10] R A Simmons and F S Salem, “High voltage automatic transfer switch: going beyond normal distribution solutions”, 9Ih Inter Conf On Harmonics and Quality of Power, Vol 3,2000, pp 882-886

[11] R E Cousy, “Transfer switch ratings ‘without fuses or circuit breakers”, IEEE Trans on Power Delivery, San., 1990,

pp.202-203 [12] R E Cosse, J E Bowen and W H Nichols, “Is selectivity achieved in critical low-voltage UPS and standby generator power circuits?”, IEEE

Trans On Industry Applications, Vol 37, Jul., 2001, pp 1140-1 151 [13] K T Erickson, ”Programmable logic controllers”, IEEE Potentials VoLlS, Feb., 1996, pp 14-17,

[14] E A Parr, “Programmable controllers: an engineer’s guide”, Newnes,

1997

Trang 13

III ALGORITHM DESIGN

Trang 14

Power outages have the greatest impact on all economic sectors from agriculture to industry to daily life.

Ngày đăng: 13/12/2022, 06:44

TỪ KHÓA LIÊN QUAN

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w