TIEU LUAN MOI download : skknchat123@gmail.com... POWER CONVERTER DESIGN AND ATS AUTO GENERATOR CONTROL AUTOMATIC TRANSFER SWITCH • Phạm Hữu Thanh TEACHER: TS.Nguyễn Trí Cường TIEU LUAN
Trang 1TIEU LUAN MOI download : skknchat123@gmail.com
Trang 2POWER CONVERTER DESIGN AND ATS AUTO GENERATOR CONTROL
(AUTOMATIC TRANSFER SWITCH )
• Phạm Hữu Thanh
TEACHER: TS.Nguyễn Trí Cường
TIEU LUAN MOI download : skknchat123@gmail.com
Trang 3CONCLUSIONS AND FUTUREWORK
TIEU LUAN MOI download : skknchat123@gmail.com
Trang 5TIEU LUAN MOI download : skknchat123@gmail.com
Trang 6When there is a power outage on the grid, special loads will require an
alternate backup power source.
What is an ATS system?
An automatic power transfer device, also known as ATS (Automatic
Transfer Switch) is used to automatically transfer the load from the main
power source to the backup source when the main source fails and vice
versa when the main power is restored or switched intentionally.
TIEU LUAN MOI download : skknchat123@gmail.com
Trang 7ATS structure with main grid – 2
backup generators
This construction allows two generators to work
alternately or in parallel, resulting in higher power
generation efficiency and longer traction motor life.
TIEU LUAN MOI download : skknchat123@gmail.com
Trang 8II INTRODUCE
The following requirements must be followed during operation: :
Only startup one to three times each power outage.
After the engine has successfully operated for 5 to
7 seconds, the starter must be turned off.
Before putting oil into the combustion chamber of an
engine, it must be dried.
It is vital to avoid repeated beginning when the
mains voltage fluctuates or the grid voltage flickers
Diesel generator
When stopping, you'll need some time to cool off.
Trang 9TIEU LUAN MOI download : skknchat123@gmail.com
Trang 10TIEU LUAN MOI download : skknchat123@gmail.com
Trang 11III ALGORITHM DESIGN
Trang 12TIEU LUAN MOI download : skknchat123@gmail.com
Trang 13Time diagram in case of power on after 5 hours Time diagram in case of power on after 5 hours
Time diagram in case the generators do not power up
TIEU LUAN MOI download : skknchat123@gmail.com
Trang 14IV RESULT
Trang 15TIEU LUAN MOI download : skknchat123@gmail.com
Trang 17TIEU LUAN MOI download : skknchat123@gmail.com
Trang 18[5] H Zheng, Y Cheng, B Gou, D Frank, A Bern, and W E Muston,
”Impact of automatic switches on power distribution system reliability,”Electr Power Syst Res., vol 83, no 1, pp 51-57, 2012
[6] P M Curtis, ”Automatic Transfer Switch Technology,Application, and Maintenance,” in Maintaining Mission CriticalSystems in a 24/7 Environment, IEEE, 2007, pp 89-111
[7] B Tian et al., ”400 V/1000 kVA Hybrid Automatic Transfer Switch,” IEEE Trans Ind Electron., vol 60, no 12, pp 5422–5435, 2013
[8] FX3G SERIES PROGRAMMABLE CONTROLLERS HARDWARE MANUAL
[9] Everlasting company, ”Operation and Maintenance Manual forDiesel
Generator Sets ”[10] R A Simmons and F S Salem, “High voltage automatic transfer switch: going beyond normal distribution solutions”, 9Ih Inter Conf On Harmonics and Quality of Power, Vol 3,2000, pp 882-886
[11] R E Cousy, “Transfer switch ratings ‘without fuses or circuit breakers”, IEEE Trans on Power Delivery, San., 1990, pp.202-
203 [12] R E Cosse, J E Bowen and W H Nichols, “Is selectivity achieved in critical low-voltage UPS and standby generator power circuits?”, IEEE
Trans On Industry Applications, Vol 37, Jul., 2001, pp 1140-1 151[13] K T Erickson, ”Programmable logic controllers”, IEEE PotentialsVoLlS, Feb., 1996, pp 14-17,
[14] E A Parr, “Programmable controllers: an engineer’s guide”,Newnes,
TIEU LUAN MOI download : skknchat123@gmail 1997 .com
THANK YOU !
Trang 19III ALGORITHM DESIGN
Trang 20TIEU LUAN MOI download : skknchat123@gmail.com
Trang 21III ALGORITHM DESIGN
Trang 22TIEU LUAN MOI download : skknchat123@gmail.com
Trang 23Power outages have the greatest impact on all economic sectors from agriculture to industry to daily life.
Trang 24TIEU LUAN MOI download : skknchat123@gmail.com