Semper Tek’s Team has successfully delivered several Design-Build projects for USACE & other Federal Clients over the last 5 years.. Expect High Quality project that meet the program n

Trang 1

DESIGN-BUILD PROGRAM

Design-Build DBB

CBOC Rendering, Ft Knox, KY, USACE Louisville District DBB

DESIGN BUILD

$

High Quality

The Semper Tek Team works together from start to finish, in open communication with the Owner, to deliver otherwise unachievable results The best logical solutions are conceived when all stakeholders are in collaboration, resulting in mini-mized cost, schedules streamlined and efficiencies realized with the quality results It’s the best return on investment!

Semper Tek’s Team has successfully delivered several

Design-Build projects for USACE & other Federal

Clients over the last 5 years

The Design-Build project scopes ranged in complexity

and value for single project between $150K to $8M

PROJECT RISK FACTORS

T I M E

Q U A L I T Y

C O S T

Reduce 15% or more off the project time-line by incorporating

the construction team early on in the design process Less documentation is needed and the Construction Phase can begin much earlier

Control Cost towards SOW &

Cost Reductioncan be achieved

by the continuous analysis of cost op-tions that parallels the Design Packages

Cost can be controlled early enough in order to meet the project budget.

Expect High Quality project that meet the program needs

by benefiting the Construction Team with

a much earlier start to planning logistics, product procurement and

QA/QC coordination

Longer Project

Time-lines to

accommo-date 3 sequential phases:

Design, Bid, Construction

Adds Risk to breakdown in

communication.

Low-Cost Setbacks

such as less experienced

and low quality bidders

can affect the project

Eliminates cost verification

during Design Phase.

Quality Reduction

due to Low Bid approach if

selected contractor is not

accustomed to perform

project type

Trang 2

Design-Build Program

Semper Tek’s Design-Build Program provides owners with a

single point of contact responsible for both the design and

construction phases of a project We have the responsibility

and contractual risk for every aspect of a project build from:

program verification, cost assessments, pre-construction

activities including architecture, interiors, engineering,

subcontracting, construction and post-construction

A Service-Disabled Veteran Owned Small Business

Design Build Team

Santiago Iturralde Bachelor of Architecture - SPSU (Now KSU)

20 years of experience in A/E Industry

15 years in Design-Build D-B Project Experience Range: 2M to 30M Jason Brinkmoeller

Civil Eng - Virginia Military Institute

12 years of C.M experience

10 years in Design-Build D-B Project Experience Range: 150K to 10M Bill Daugherty

Electrical Eng - GA Institute of Technology

14 years of C.M experience

8 years in Design-Build D-B Project Experience Range: 200K to 7M Scott Matheny

C.M Degree - Eastern Kentucky University

25 years of C.M experience

15 years in Design-Build D-B Project Experience Range: 200K to 18M Eric Boursaw

B.S Construction Management - AAS

22 years of C.M experience

15 years in Design-Build D-B Project Experience Range: 4M to 54M

Design-Build Relevant Experience

3-D Modeling Coordination

Semper Tek’s Team has the in-house capabilities

to produce 3D BIM Models in order to illustrate the programing needs, coordinate the major systems & building components during the design phase.

Mr Brinkmoeller holds a Certified Healthcare Constructor (CHC) Certificationby the American Society of Healthcare Engineers (ASHE)

Mr Brinkmoeller is one of only eight people in the state of Kentucky, and the only employee of a SDVOSB Firm to hold this prestigious certification

Jason’s certification is valid until October 2020.

This specialized knowledge will be applied to all Design-Build projects with Healthcare SOW.

VA CBOC

D/B Renovation of Bldg 614 & Demolition of Bldg 745

Wright-Patterson AFB, Ohio USACE

W912QR-09-D-0043, Task Order 0014 Completed in April 2014 for $2,193,789.59

D/B HVAC for Oncology and Hematology Departments

Robley Rex VAMC, Louisville, Kentucky Department of Veterans Affairs VA249-14-C-0031

Completed in July 2015 for $1,185,026.36

D/B Electrical Repair for High Perf Computer at WPAFB

Wright-Patterson AFB, Ohio USACE Louisville District, SDVOSB MATOC W912QR-13-D-0027

Completed in May 2016 for $611,426.69

D/B VA Community Based Outpatient Clinic (CBOC)

Fort Knox, KY USACE Louisville District W912QR18-C0025 Anticipated in Spring 2020 for $8,755,435.68

Phone: 859.252.8339

Team Leader - Architecture

Civil - Structural

Electrical - Mechanical

Cost & Risk Management

Constructability - Logistics

Ngày đăng: 01/11/2022, 17:05

TỪ KHÓA LIÊN QUAN

TÀI LIỆU CÙNG NGƯỜI DÙNG

TÀI LIỆU LIÊN QUAN

w