2.0 文文 SCOPE 2.1 NQJ/NQX/V1 SMT文文 OP 文文文文文文文文文文 All SMT operators and engineering technicians at NQJ/NQX/V1; 2.2 文文文文文 SMT 文文文文文文文文文文文文文文文文文 This manual is applicable to equipment operat
Trang 1Revision History
Rev.
Status Revision Date Revised By Description
1 2007/7/9 文文 文文文文
2 2016/3/6 文文文
1 文文文文: 文文文文文文文文文文 Form No文901-K0040-02
2 文文文文: 文文文文文文文文文文文文文 Form No文902-N19-29
3 “6.2文文文文文文文文文”文“6.3 文文文文文文文文文”文文文文文文文文
3 2019/3/4 文文文 文文文文文文文文文文文文文文文文For V1 factory build-up requirement, add English
translation
Add Vietnamese translation
Trang 2目目 CONTENTS
1.0 文文
PURPOSE 3
2.0 文文
SCOPE 3
3.0 文文
DEFINITIONS 3
4.0 文文
RESPONSIBILITIES 3
5.0 文文文文
FLOWCHART 3
6.0 文文文文
ACTIVITIES DESCRIPTION 4
7.0 文文文文
REFERENCES 7
8.0 文文
ATTACHMENTS 7
Trang 31.0 文文
PURPOSE
文文 SMT OPERATOR 文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文
To ensure that the SMT operators are able to operate the equipment correctly and to avoid equipment damage and industrial safety accidents due to improper operation and also to effectively make the best
of equipment throughput for the accomplishment of the production goal
2.0 文文
SCOPE
2.1 NQJ/NQX/V1 SMT文文 OP 文文文文文文文文文文
All SMT operators and engineering technicians at NQJ/NQX/V1;
2.2 文文文文文 SMT 文文文文文文文文文文文文文文文文文
This manual is applicable to equipment operation of board loaders during SMT production and manufacturing
3.0 文文
DEFINITIONS
文
None
4.0 文文
RESPONSIBILITIES
4.1 文文文文文文文文文文文文文文文文
Production Unit: Is responsible for operating and daily maintenance of equipment
4.2 文文文文文文文文文文文文文文文文文文文文文文文文文
Engineering Unit: Is responsible for troubleshooting, daily care, and educational training for
operators
5.0 文文文文
FLOWCHART
文
None
Trang 46.0 文文文文
ACTIVITIES DESCRIPTION
6.1 文文文文文
Preparation Prior to Start-up
6.1.1 文文文文文文文 4-6Kg/CM 文文文文 文
Check if the air pressure is 4-6 Kg/CM
6.1.2 文文文文文文文文 文
Select the emergency stop button
6.2 文文文文文文文文文
Cheng Tai Board Loader Operating Steps
6.2.1 文文文文
Startup Steps
6.2.1.1 文文文文文文文文文文文文文
Turn on main power and the machine will start automatically
6.2.1.2 文文文文文文文文文文文文文文文文文文文
Under the manual mode, place in the material frame and pay attention to the orientation of the material frame;
6.2.1.3 文“文文文文”文文文文文文文文文文文文
Press “Lower Basket in” so that the material frame is sent into the board loader;
Trang 5the first board pushing position.
6.2.2 文文文文
Shut-down Steps
6.2.2.1 文文“文文”文文文文文文文文文
Press “Stop” to stop the machine;
6.2.2.2 文文文文文文文文文文文文文
Press the power switch to shut down main power
文文文文
Trang 66.3 文文文文文文文文文
Sheng Ta Board Loader Operating Steps
6.3.1 文文文文
Start-up Steps
6.3.1.1 文文文文文文
Turn on main power;
6.3.1.2 文文文文文文文文文文文
Press the power button for the operator interface;
6.3.1.3 文文文文文文文文文文文文文文文文文文文
Under the manual mode, place in the material frame and pay attention to the orientation of the material frame;
6.3.1.4 文文“文文”文文文文文文文文文文文文
Press “Move in” so that the material frame is sent into the board loader;
6.3.1.5 文文文文文文文文文文文文文文文文文文文文文
Shift to the Auto mode; the material frame will automatically elevate to the first board pushing position
Trang 76.3.2 文文文文
Shut-down Steps
6.3.2.1 文文文文文文文文文文文
Press the power button for the operator interface
6.3.2.2 文文文文文
Shut down main power
6.4 文文文文
PRECAUTIONS
6.4.1 文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文文
If the equipment experiences abnormality, the operator shall notify the technician, the engineer,
Trang 8or the direct supervisor immediately to handle the issue.
6.4.2 文文文文文文文901-K0040-01 文文文文文文文文文文文文文文文文文
The production unit performs daily maintenance according to the 901-K0040-01 (BOARD LOADER CLASS 1 MAINTENANCE RECORD SHEET.)
6.4.3 文文文文文文文902-N19-29 文文文文文文文文文文文文文文文文文文文文
The engineering unit performs monthly maintenance according to the 902-N19-29 (board loader class 2 preventive maintenance inspection form)
7.0 文文文文
REFERENCES
文
N/A
8.0 文文
ATTACHMENTS
8.1 901-K0040-01 文文文文文文文文文文
901-K0040-01 (board loader class 1 maintenance record sheet)
8.2 902-N19-29 文文文文文文文文文文文文文
902-N19-29 (board loader class 2 preventive maintenance inspection form)