Lecture Introduction to operations management - Chapter 13: Scheduling operations. In this chapter we will discuss: Batch scheduling, gantt charting, finite capacity scheduling, theory of constraints, priority dispatching rules, planning and control systems.
Trang 1Contemporary Concepts and Cases
Chapter ThirteenScheduling Operations
Copyright © 2011 by The McGrawHill Companies, Inc. All rights reserved McGrawHill/Irwin
Trang 6Batch Processing Move-queue-work-wait-move
Work is done according to work orders
wait movequeue
move
move wait
queue move
move
move
Trang 8– Release work orders to shop & issue
dispatch lists for individual machinesMonitoring
– Maintain progress reports on each job
until it is complete
Trang 10Job Data for Scheduling Example
Job
Work center/
Machine Hours
Due Date
Trang 12Where is the bottleneck?
Trang 13Gantt Chart for Example
Trang 14Conclusions about Batch Scheduling
Trang 15Finite Capacity Scheduling (1)
Finite capacity scheduling loads jobs onto work stations being careful not to exceed
Trang 16Finite Capacity Scheduling (2)
Trang 18Theory of Constraints (TOC)
A constraint is anything that is slowing down production—a bottleneck
– A machine or workstation
– The market
– Procurement system
The bottleneck determines the capacity of the system
Implication: The operations manager should
focus on the bottleneck to increase capacity
and throughput (and make more money)
Trang 20Theory of Constraints (TOC)
Ways of reducing the bottleneck or constraint:
Increase capacity
Divert work that doesn’t need to go through the bottleneck
Catch rejects before they get to the bottleneck
Increase output at the bottleneck
– Larger batches
– Reduced setup times
Trang 22Priority Dispatching Rules
Trang 25End of Chapter Thirteen