1, HCMC GHI CHÚ INVESTOR : CHỦ ĐẦU TƯ : CƠNG TY TƯ VẤN ĐẦU TƯ & XÂY DỰNG QUỐC TẾ INTERNATIONAL CONTRUCTION & INVESTMENT CONSULTANCY CONPANY ESTELLA JOINT VENTURE CO., LTD PROJECT MANAGER
Trang 23PB4 1400/800x650/800/700 3PB5 1400/800x650/800/700
1400 800
1400 800
3G2
3G1
3G1
3G3
3G3
3G3
3G1
3B1
3B1
3B11
3B1 3B7
3B4 3B4
3B1 3B1
3B1
3B1A
3B17
3B18
7300
7380
120
100
7220
7050
7100
7280
120 100
6617
600
1380
285 300
FL +13.35
800
B
C
D
E
F
GHI CHÚ / NOTES:
SÀN DÀY 200MM, CAO TRÌNH ĐỈNH SÀN (3FL) - 50, HOẠT TẢI: 4.0 kN/M2 SLAB THICK 200MM, TOP SLAB LEVEL (3FL) - 50, LIVE LOAD: 4.0 kN/M2
DẦM ỨNG LỰC TRƯỚC POST - TENSION BEAM
SÀN DÀY 200MM, CAO TRÌNH ĐỈNH SÀN (3FL) - 100, HOẠT TẢI: 2.0 kN/M2 SLAB THICK 200MM, TOP SLAB LEVEL (3FL) - 100, LIVE LOAD: 2.0 kN/M2
SÀN DÀY 200MM, CAO TRÌNH ĐỈNH SÀN (3FL) - 100, HOẠT TẢI: 4.0 kN/M2 SLAB THICK 200MM, TOP SLAB LEVEL (3FL) - 100, LIVE LOAD: 4.0 kN/M2
SLAB THICK 200MM, TOP SLAB LEVEL (3FL) - 100, LIVE LOAD: 7.5 kN/M2 SÀN DÀY 200MM, CAO TRÌNH ĐỈNH SÀN (3FL) - 100, HOẠT TẢI: 7.5 kN/M2
SLAB THICK 200MM, TOP SLAB LEVEL (3FL) - 650, LIVE LOAD: 3.0 kN/M2 SÀN DÀY 200MM, CAO TRÌNH ĐỈNH SÀN (3FL) - 650, HOẠT TẢI: 3.0 kN/M2
THỐNG KÊ DẦM BEAM SCHEDULE
KÝ HIỆU NAME
KÍCH THƯỚC SIZE BxH (MM)
CAO TRÌNH ĐỈNH / TOP OF LEVEL
GHI CHÚ NOTES
B C D E F G H J K
FL -50
300
MẶT CẮT 2-2
PT Beam
650 150
MẶT CẮT 2C-2C
300 700~1830
150
( PODIUM )
PROJECT :
ESTELLA HEIGHTS PHASE 2
MAIN CONTRACTOR :
DRAWING NAME :
CONSULTANT :
Fax: (84 -8 ) 37446600 Tel: (84 -8 ) 37446611 - 37446622 32-34 Street 13, An Phu Ward, Dist 2, HCMC
CÔNG TRÌNH : NHÀ THẦU THI CÔNG :
TƯ VẤN GIÁM SÁT :
65 Le Loi, Dist 1, HCMC
GHI CHÚ
INVESTOR : CHỦ ĐẦU TƯ :
CƠNG TY TƯ VẤN ĐẦU TƯ & XÂY DỰNG
QUỐC TẾ
INTERNATIONAL CONTRUCTION & INVESTMENT CONSULTANCY CONPANY
ESTELLA JOINT VENTURE CO., LTD
PROJECT MANAGER :
CHECKED BY : KIỂM : QUẢN LÝ DỰ ÁN :
Số hiệu No.
Đánh dấu Mark
Nội dung hiệu chỉnh Revision Note
Ngày Date
An Phu Ward, District 2, HCMC ADDRESS :
ĐIẠ ĐIỂM XÂY DỰNG:
APPROVED BY :
CHECKED BY : KIỂM :
PHÊ DUYỆT :
TRẦN TIẾN QUỐC BÌNH
LÊ MINH DÂN
PACKAGE:
HẠNG MỤC
BASEMENT STRUCTURAL WORKS
108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN
DRAWN BY : TRIỂN KHAI :
PHAN PHÚ NGỌC DUY
KEY PLAN
Trang 3GIÀN GIÁO HOA KHẾ GIẰNG NGANG CHỐNG HOA KHẾ, DÀI 1200mm
HORIZONTAL LEDGER, LENGTH 1200mm
GIẰNG NGANG CHỐNG HOA KHẾ, DÀI 900mm HORIZONTAL LEDGER, LENGTH 900mm
CÂY CHỐNG ĐỨNG HOA KHẾ VERTICAL POST
GIẰNG CHÉO CHỐNG HOA KHẾ DIAGONAL BRACING
LỐI ĐI
900 900
900
700
1200
900
600
900
900
900
900
900
700 900
C
D
E
F
( PODIUM )
PROJECT :
ESTELLA HEIGHTS PHASE 2
MAIN CONTRACTOR :
DRAWING NAME :
HOÀN THÀNH
CONSULTANT :
Fax: (84 -8 ) 37446600
HIỆU CHỈNH
Tel: (84 -8 ) 37446611 - 37446622 32-34 Street 13, An Phu Ward, Dist 2, HCMC
ISSUE DATE DRAWING NO REVISION CÔNG TRÌNH :
NHÀ THẦU THI CÔNG :
TƯ VẤN GIÁM SÁT :
65 Le Loi, Dist 1, HCMC
INVESTOR : CHỦ ĐẦU TƯ :
CƠNG TY TƯ VẤN ĐẦU TƯ & XÂY DỰNG
QUỐC TẾ
INTERNATIONAL CONTRUCTION & INVESTMENT CONSULTANCY CONPANY
ESTELLA JOINT VENTURE CO., LTD
PROJECT MANAGER :
CHECKED BY : KIỂM : QUẢN LÝ DỰ ÁN :
Số hiệu No.
Đánh dấu Mark
Nội dung hiệu chỉnh Revision Note
Ngày Date
An Phu Ward, District 2, HCMC ADDRESS :
ĐIẠ ĐIỂM XÂY DỰNG:
APPROVED BY :
CHECKED BY : KIỂM :
PHÊ DUYỆT :
TRẦN TIẾN QUỐC BÌNH
LÊ MINH DÂN
PACKAGE:
HẠNG MỤC
BASEMENT STRUCTURAL WORKS
108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN
DRAWN BY : TRIỂN KHAI :
PHAN PHÚ NGỌC DUY
Trang 4THÉP HỘP 50x100x1.8
GHI CHÚ:
THÉP HỘP 50x50x1.8
C
D
E
F
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500 1500 1500 1500 1500
1500 1500 1500 1500 1500 1500 1500
1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500 1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500
1500 1500 1500 1500 1500 1500
1500 1500 1500
1500 1500 1500
1500 1500 1500 1500 1500 1500
1500 1500 1500
1500 1500 1500
1500 1500 1500 1500 1500 1500
1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500
1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500
1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500
1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500
1500 1500 1500
1500 1500
1500 1500 1500
1500 1500 1500
1500 1500
1500 1500
1500 1500 1500 1500
1500 1500 1500 1500 1500 1500 1500 1500
1500 1500 1500 1500 1500 1500 1500 1500 1500
1500 1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500 1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500 1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500 1500 1500 1500
1500 1500 1500
1500 1500 1500 1500 1500 1500 1500
1500 1500 1500
1500 1500 1500 1500 1500 1500 1500
1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500 1500 1500 1500
1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500 1500 1500 1500 1500
1500 1500 1500 1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500
1500 1500
1500 1500 1500
1500 1500 1500
1500 1500 1500 1500 1500
1500 1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500
1500 1500 1500
1500 1500
1500 1500
1500 1500 1500
1500 1500 1500
1500 1500 1500
1500 1500 1500
1500 1500
1500 1500
1500 1500 1500
1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500 1500
1500 1500 1500 1500 1500
1500 1500 1500
1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
6000 6000 6000
6000 6000
6000 6000
6000 6000 6000
1500 1500 1500
1500 1500 1500
1500 1500 1500
1500 1500 1500
1500 1500
1500 1500
1500 1500 1500
1500 1500 1500
1500 1500
1500 1500
1500 1500 1500
1500 1500 1500
1500 1500 1500 1500
1500 1500 1500 1500
3000 3000 3000
3000 3000 3000
1500 1500 1500 1500 1500 1500 1500
1500 1500 1500
1500 1500 1500
1500 1500 1500
1500 1500 1500
PROJECT :
ESTELLA HEIGHTS PHASE 2
MAIN CONTRACTOR :
DRAWING NAME :
CONSULTANT :
Fax: (84 -8 ) 37446600 Tel: (84 -8 ) 37446611 - 37446622 32-34 Street 13, An Phu Ward, Dist 2, HCMC
CÔNG TRÌNH : NHÀ THẦU THI CÔNG :
TƯ VẤN GIÁM SÁT :
65 Le Loi, Dist 1, HCMC
GHI CHÚ
INVESTOR : CHỦ ĐẦU TƯ :
CƠNG TY TƯ VẤN ĐẦU TƯ & XÂY DỰNG
QUỐC TẾ
INTERNATIONAL CONTRUCTION & INVESTMENT CONSULTANCY CONPANY
ESTELLA JOINT VENTURE CO., LTD
PROJECT MANAGER :
CHECKED BY : KIỂM : QUẢN LÝ DỰ ÁN :
Số hiệu No.
Đánh dấu Mark
Nội dung hiệu chỉnh Revision Note
Ngày Date
An Phu Ward, District 2, HCMC ADDRESS :
ĐIẠ ĐIỂM XÂY DỰNG:
APPROVED BY :
CHECKED BY : KIỂM :
PHÊ DUYỆT :
TRẦN TIẾN QUỐC BÌNH
LÊ MINH DÂN
PACKAGE:
HẠNG MỤC
BASEMENT STRUCTURAL WORKS
108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN
DRAWN BY : TRIỂN KHAI :
PHAN PHÚ NGỌC DUY
( PODIUM )
Trang 5GIÀN GIÁO HOA KHẾ GIẰNG NGANG CHỐNG HOA KHẾ, DÀI 1200mm
HORIZONTAL LEDGER, LENGTH 1200mm
GIẰNG NGANG CHỐNG HOA KHẾ, DÀI 900mm HORIZONTAL LEDGER, LENGTH 900mm
CÂY CHỐNG ĐỨNG HOA KHẾ VERTICAL POST
GIẰNG CHÉO CHỐNG HOA KHẾ DIAGONAL BRACING
LỐI ĐI
1200
1100
1200
780
400
300
300
300
300
300
300
400
300
300
300
300
750
750
300
300
300
300
300
800
300
380
1000
300
880
400
300
230
300
300
315
1100
300
400
1000
300
400
C
D
E
F
PROJECT :
ESTELLA HEIGHTS PHASE 2
MAIN CONTRACTOR :
DRAWING NAME :
HOÀN THÀNH
CONSULTANT :
Fax: (84 -8 ) 37446600
HIỆU CHỈNH
Tel: (84 -8 ) 37446611 - 37446622 32-34 Street 13, An Phu Ward, Dist 2, HCMC
ISSUE DATE DRAWING NO REVISION CÔNG TRÌNH :
NHÀ THẦU THI CÔNG :
TƯ VẤN GIÁM SÁT :
65 Le Loi, Dist 1, HCMC
INVESTOR : CHỦ ĐẦU TƯ :
CƠNG TY TƯ VẤN ĐẦU TƯ & XÂY DỰNG
QUỐC TẾ
INTERNATIONAL CONTRUCTION & INVESTMENT CONSULTANCY CONPANY
ESTELLA JOINT VENTURE CO., LTD
PROJECT MANAGER :
CHECKED BY : KIỂM : QUẢN LÝ DỰ ÁN :
Số hiệu No.
Đánh dấu Mark
Nội dung hiệu chỉnh Revision Note
Ngày Date
An Phu Ward, District 2, HCMC ADDRESS :
ĐIẠ ĐIỂM XÂY DỰNG:
APPROVED BY :
CHECKED BY : KIỂM :
PHÊ DUYỆT :
TRẦN TIẾN QUỐC BÌNH
LÊ MINH DÂN
PACKAGE:
HẠNG MỤC
BASEMENT STRUCTURAL WORKS
108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN
DRAWN BY : TRIỂN KHAI :
PHAN PHÚ NGỌC DUY
( PODIUM )
Trang 6THÉP HỘP 50x100x1.8
GHI CHÚ:
THÉP HỘP 50x50x1.8
6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000
C
D
E
F
PROJECT :
ESTELLA HEIGHTS PHASE 2
MAIN CONTRACTOR :
DRAWING NAME :
CONSULTANT :
Fax: (84 -8 ) 37446600 Tel: (84 -8 ) 37446611 - 37446622 32-34 Street 13, An Phu Ward, Dist 2, HCMC
CÔNG TRÌNH : NHÀ THẦU THI CÔNG :
TƯ VẤN GIÁM SÁT :
65 Le Loi, Dist 1, HCMC
GHI CHÚ
INVESTOR : CHỦ ĐẦU TƯ :
CƠNG TY TƯ VẤN ĐẦU TƯ & XÂY DỰNG
QUỐC TẾ
INTERNATIONAL CONTRUCTION & INVESTMENT CONSULTANCY CONPANY
ESTELLA JOINT VENTURE CO., LTD
PROJECT MANAGER :
CHECKED BY : KIỂM : QUẢN LÝ DỰ ÁN :
Số hiệu No.
Đánh dấu Mark
Nội dung hiệu chỉnh Revision Note
Ngày Date
An Phu Ward, District 2, HCMC ADDRESS :
ĐIẠ ĐIỂM XÂY DỰNG:
APPROVED BY :
CHECKED BY : KIỂM :
PHÊ DUYỆT :
TRẦN TIẾN QUỐC BÌNH
LÊ MINH DÂN
PACKAGE:
HẠNG MỤC
BASEMENT STRUCTURAL WORKS
108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN
DRAWN BY : TRIỂN KHAI :
PHAN PHÚ NGỌC DUY
( PODIUM )
Trang 7CÂY CHỐNG ĐỨNG VERTICAL POST
GIẰNG NGANG HORIZONTAL LEDGER
1
1
HOA KHE ARRANGERMENT PLAN
THÉP HỘP/ STEEL BOX 50x100x1.8a1200
STEEL BOX ARRANGEMENT PLAN
THÉP HỘP/ STEEL BOX 50x50x1.8
VÁN ÉP DÀY 18mm
POLY WOOD THICK 18mm
600
VÁN ÉP DÀY 18mm a1200
1
1
GIẰNG CHÉO
DIAGONAL BRACING
SECTION 1-1
1200
GIẰNG CHÉO DIAGONAL BRACING
VERTICAL POST 1500 CÂY CHỐNG ĐỨNG 1500 KÍCH U/ U HEAD
CHÂN ĐẾ Þ38L600
Þ38L600 THÉP HỘP/ STEEL BOX 50x50x1.8 a300
THÉP HỘP/ STEEL BOX 2x50x100x1.8a1200
FL +8.85
FL +13.35
VERTICAL POST 2000 CÂY CHỐNG ĐỨNG 2000
VÁN ÉP DÀY 18mm POLY WOOD THICK 18mm
650~1200
CÂY CHỐNG ĐỨNG VERTICAL POST
GIẰNG CHÉO GIẰNG NGANG DIAGONAL BRACING HORIZONTAL LEDGER
2
2
HOA KHE ARRANGERMENT PLAN
THÉP HỘP/ STEEL BOX 50x100x1.8a900
STEEL BOX ARRANGEMENT PLAN
THÉP HỘP/ STEEL BOX 50x50x1.8
2
2
SECTION 2-2
1200
THÉP HỘP/ STEEL BOX 2x50x100x1.8
TY THÉP/ TIE ROD Þ17a700 THÉP Ø22~25
THÉP HỘP/ STEEL BOX 50x50x1.8 a200
GIẰNG CHÉO DIAGONAL BRACING
VERTICAL POST 1000 CÂY CHỐNG ĐỨNG 1000 KÍCH U/ U HEAD
CHÂN ĐẾ Þ38L600
Þ38L600
VERTICAL POST 2000 CÂY CHỐNG ĐỨNG 2000
FL +8.85
FL +13.35
VÁN ÉP DÀY 18mm POLY WOOD THICK 18mm
1400
CÂY CHỐNG ĐỨNG VERTICAL POST
GIẰNG CHÉO GIẰNG NGANG DIAGONAL BRACING HORIZONTAL LEDGER
3
3
HOA KHE ARRANGERMENT PLAN
THÉP HỘP/ STEEL BOX 50x100x1.8a900
STEEL BOX ARRANGEMENT PLAN
THÉP HỘP/ STEEL BOX 50x50x1.8
3
3
SECTION 3-3
1200
BEAM 3
THÉP HỘP/ STEEL BOX 2x50x100x1.8
TY THÉP/ TIE ROD Þ17a700 THÉP Ø22~25
THÉP HỘP/ STEEL BOX 50x50x1.8 a200
GIẰNG CHÉO DIAGONAL BRACING
VERTICAL POST 1000 CÂY CHỐNG ĐỨNG 1000 KÍCH U/ U HEAD
CHÂN ĐẾ Þ38L600
Þ38L600
VERTICAL POST 2000 CÂY CHỐNG ĐỨNG 2000
FL +8.85
FL +13.35
PROJECT :
ESTELLA HEIGHTS PHASE 2
MAIN CONTRACTOR :
DRAWING NAME :
HOÀN THÀNH
CONSULTANT :
NOTE :
Fax: (84 -8 ) 37446600
HIỆU CHỈNH
Tel: (84 -8 ) 37446611 - 37446622 32-34 Street 13, An Phu Ward, Dist 2, HCMC
ISSUE DATE DRAWING NO REVISION CÔNG TRÌNH :
NHÀ THẦU THI CÔNG :
TƯ VẤN GIÁM SÁT :
65 Le Loi, Dist 1, HCMC
GHI CHÚ
INVESTOR : CHỦ ĐẦU TƯ :
CƠNG TY TƯ VẤN ĐẦU TƯ & XÂY DỰNG
QUỐC TẾ
INTERNATIONAL CONTRUCTION & INVESTMENT CONSULTANCY CONPANY
ESTELLA JOINT VENTURE CO., LTD
PROJECT MANAGER :
CHECKED BY : KIỂM : QUẢN LÝ DỰ ÁN :
Số hiệu No.
Đánh dấu Mark
Nội dung hiệu chỉnh Revision Note
Ngày Date
An Phu Ward, District 2, HCMC ADDRESS :
ĐIẠ ĐIỂM XÂY DỰNG:
APPROVED BY :
CHECKED BY : KIỂM :
PHÊ DUYỆT :
TRẦN TIẾN QUỐC BÌNH
LÊ MINH DÂN
PACKAGE:
HẠNG MỤC
BASEMENT STRUCTURAL WORKS
108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN
DRAWN BY : TRIỂN KHAI :
PHAN PHÚ NGỌC DUY
Trang 10HOA KHE ARRANGERMENT PLAN
600~1200
STEEL BOX ARRANGEMENT PLAN
VERTICAL POST 2000 CÂY CHỐNG ĐỨNG 2000 KÍCH U/ U HEAD
CHÂN ĐẾ/ JACKBASE Þ38L600
Þ38L600
THÉP HỘP/ STEEL BOX 50x50x1.8a300 VÁN ÉP PHỦ PHIM DÀY 18mm
POLYWOOD THICK.18mm
THÉP HỘP/ STEEL BOX 50x100x1.8a1200
THÉP HỘP/ STEEL BOX 50x100x1.8a1200
THÉP HỘP/ STEEL BOX 50x50x1.8a300
VERTICAL POST 1000 CÂY CHỐNG ĐỨNG 1000
GIẰNG CHÉO
GIẰNG NGANG
DIAGONAL BRACING
HORIZONTAL LEDGER
VERTICAL POST
CÂY CHỐNG ĐỨNG
FL +8.850
FL +3.350
VERTICAL POST 1500 CÂY CHỐNG ĐỨNG 1500
PROJECT :
ESTELLA HEIGHTS PHASE 2
MAIN CONTRACTOR :
DRAWING NAME :
CONSULTANT :
Fax: (84 -8 ) 37446600 Tel: (84 -8 ) 37446611 - 37446622 32-34 Street 13, An Phu Ward, Dist 2, HCMC
CÔNG TRÌNH : NHÀ THẦU THI CÔNG :
TƯ VẤN GIÁM SÁT :
65 Le Loi, Dist 1, HCMC
GHI CHÚ
INVESTOR : CHỦ ĐẦU TƯ :
CƠNG TY TƯ VẤN ĐẦU TƯ & XÂY DỰNG
QUỐC TẾ
INTERNATIONAL CONTRUCTION & INVESTMENT CONSULTANCY CONPANY
ESTELLA JOINT VENTURE CO., LTD
PROJECT MANAGER :
CHECKED BY : KIỂM : QUẢN LÝ DỰ ÁN :
Số hiệu No.
Đánh dấu Mark
Nội dung hiệu chỉnh Revision Note
Ngày Date
An Phu Ward, District 2, HCMC ADDRESS :
ĐIẠ ĐIỂM XÂY DỰNG:
APPROVED BY :
CHECKED BY : KIỂM :
PHÊ DUYỆT :
TRẦN TIẾN QUỐC BÌNH
LÊ MINH DÂN
PACKAGE:
HẠNG MỤC
BASEMENT STRUCTURAL WORKS
108 Cao Thang St.,Ward 4, Dist 3, HCMC, VN
DRAWN BY : TRIỂN KHAI :
PHAN PHÚ NGỌC DUY