Grid-connected PV installationBest practice guidelines 1AuSES PV Installation Best Practice Workshop... Why best practice?include non-technical aspects industry new versions of AS/NZS 2A

Trang 1

Grid-connected PV installation

Best practice guidelines

1AuSES PV Installation Best Practice Workshop

Trang 2

Why best practice?

include non-technical aspects

industry

new versions of AS/NZS

2AuSES PV Installation Best Practice Workshop

Trang 3

Before installation

quote, don’t use satellite imagery

◦ Solar Pathfinder, SunEye, mobile phone apps,

visual estimate

layout

◦ Minimize effect of shading

AuSES PV Installation Best Practice Workshop 3

Trang 4

Before installation

it

◦ Grid connection, planning, RECs

AuSES PV Installation Best Practice Workshop 4

Trang 7

Health and Safety

AuSES PV Installation Best Practice Workshop 7

Trang 8

Health and Safety

AuSES PV Installation Best Practice Workshop 8

Trang 9

PV modules

AuSES PV Installation Best Practice Workshop 9

Trang 10

PV modules

AuSES PV Installation Best Practice Workshop 10

Trang 11

PV modules

AuSES PV Installation Best Practice Workshop 11

Trang 12

PV modules

AuSES PV Installation Best Practice Workshop 12

Trang 13

A note on fuses

when multiple stings are connected in

parallel

requirements for overcurrent protection

mandatory trip times for protection

AuSES PV Installation Best Practice Workshop 13

Trang 14

A note on fuses

135% of the maximum series fuse rating for 2 hours

does not trip under normal operation, but trips within 2 hours of an overcurrent

situation Look at fuse/MCB

manufacturer’s datasheets.

AuSES PV Installation Best Practice Workshop 14

Trang 15

A note on fuses

AuSES PV Installation Best Practice Workshop 15

Trang 16

Polarized DC circuit breakers

direction of current

the PV array goes in the terminals marked + and –

Check wiring with manufacturer

AuSES PV Installation Best Practice Workshop 16

Trang 17

DC cabling

AuSES PV Installation Best Practice Workshop 17

Trang 18

DC cabling

AuSES PV Installation Best Practice Workshop 18

Trang 19

DC cabling

AuSES PV Installation Best Practice Workshop 19

Trang 20

DC cabling

AuSES PV Installation Best Practice Workshop 20

Trang 21

DC cabling

AuSES PV Installation Best Practice Workshop 21

Trang 22

Inverters - good

AuSES PV Installation Best Practice Workshop 22

Trang 23

Inverters - good

AuSES PV Installation Best Practice Workshop 23

Trang 24

Inverters - better

AuSES PV Installation Best Practice Workshop 24

Trang 25

Inverters - best

AuSES PV Installation Best Practice Workshop 25

Trang 26

Inverters - best

AuSES PV Installation Best Practice Workshop 26

Trang 27

Labelling and documentation

AuSES PV Installation Best Practice Workshop 27

Trang 28

Labelling and documentation

AuSES PV Installation Best Practice Workshop 28

Trang 29

Labelling and documentation

customer after installation is complete:

◦ Overall working of system

◦ Data sheets and handbooks (PV modules,

inverters, mounting rails)

◦ List of equipment supplied, with serial

numbers

◦ Wiring diagrams and string layout

AuSES PV Installation Best Practice Workshop 29

Trang 30

Labelling and documentation

◦ Commissioning sheet and installation checklist

◦ Expected annual yield

◦ Warranty certificates and manufacturer’s

contact details

◦ Maintenance procedures, shutdown

procedure, alarms installed and action

required

AuSES PV Installation Best Practice Workshop 30