IEC 61439
ASTA CERTIFICATION
POWERWELL VERIFY BY ASTA
Trang 3POWERWELL
Road 10 – Song than IP 1, Di An – Binh Duong - Vietnam Phone: 06503731731 Fax: 0650373130
Web: powerwell.com.vn
IEC 61641 ASTA CERTIFICATION
ARCING FAULT CONTAINMENT TESTED
POWERWELL VERIFY BY ASTA
Trang 4POWERWELL
Road 10 – Song than IP 1, Di An – Binh Duong - Vietnam Phone: 06503731731 Fax: 0650373130
Web: powerwell.com.vn
a) Special Test
MCCB)
assembly, extending 1m beyond each side of the unit under test and to a height of 2.5 m above the base of the assembly
b) Test Objective
Switchboard
arcing fault
c) Assessment of The Test Result
damages should be confined to that unit, so that busbar and all other functional units remain fit for further service, and the risk of personal injury was minimize
Tested to IEC 61641:1996 (ASTA Certified)