GIỚI THIỆU VỀ CÔNG TRÌNH...1 CHƯƠNG II: BIỆN PHÁP ĐẢM BẢO AN TOÀN LAO ĐỘNG, VỆ SINH MÔI TRƯỜNG VÀ PHÒNG CHÓNG CHÁY NỔ...2 PHẦN I: BIỆN PHÁP ĐẢM BẢO AN TOÀN LAO ĐỘNG...2 I.. THIẾT LẬP HỆ
Trang 1MỤC LỤC
CHƯƠNG I GIỚI THIỆU VỀ CÔNG TRÌNH 1
CHƯƠNG II: BIỆN PHÁP ĐẢM BẢO AN TOÀN LAO ĐỘNG, VỆ SINH MÔI TRƯỜNG VÀ PHÒNG CHÓNG CHÁY NỔ 2
PHẦN I: BIỆN PHÁP ĐẢM BẢO AN TOÀN LAO ĐỘNG 2
I THIẾT LẬP HỆ THỐNG GIÁM SÁT CHUYÊN TRÁCH VỀ CÔNG TÁC AN TOÀN LAO ĐỘNG ………
2 II XÂY DỰNG CÁC NỘI QUY ATLĐ TRÊN CÔNG TRƯỜNG 2
III BIỆN PHÁP THI CÔNG AN TOÀN 3
III.1 MỘT SỐ NGUYÊN TẮC CƠ BẢN KHI THI CÔNG 3
III.2 BIỆN PHÁP THI CÔNG AN TOÀN CỦA MỘT SỐ CÔNG VIỆC CHÍNH 4
III.2.1 BIỆN PHÁP AN TOÀN KHI HÀN ĐIỆN, HÀN CẮT HƠI 4
III.2.2 BIỆN PHÁP AN TOÀN ĐIỆN 4
III.2.3 AN TOÀN LAO ĐỘNG TRONG CÔNG TÁC LẮP ĐẶT ĐƯỜNG ỐNG 5
III.2.4 AN TOÀN LAO ĐỘNG TRONG CÔNG VIỆC TRÊN CAO 5
III.3 TRANG THIẾT BỊ PHỤC VỤ CÔNG TÁC AN TOÀN LAO ĐỘNG 6
III.3.1 TRANG THIẾT BỊ BẢO HỘ LAO ĐỘNG 6
III.3.1.1 PHƯƠNG TIỆN BẢO VỆ ĐẦU 6
III.3.1.2 PHƯƠNG TIỆN BẢO VỆ MẮT 6
III.3.1.3 PHƯƠNG TIỆN BẢO VỆ CƠ QUAN HÔ HẤP 7
III.3.1.4 PHƯƠNG TIỆN BẢO VỆ TAY 7
III.3.1.5 PHƯƠNG TIỆN BẢO VỆ CHÂN 7
III.4 CẤP PHÁT PHƯƠNG TIỆN BẢO VỆ CHO CÔNG NHẬN 7
IV ĐẢM BẢO AN TOÀN GIAO THÔNG 7
PHẦN II: BIỆN PHÁP ĐẢM BẢO AN NINH CÔNG TRƯỜNG 9
PHẦN III: BIỆN PHÁP ĐẢM BẢO VỆ SINH MÔI TRƯỜNG 10
PHẦN IV: BIỆN PHÁP PHÒNG CHỐNG CHÁY NỔ 11
I CÔNG TÁC PHÒNG CHỐNG CHÁY NỔ 11
II BIỆN PHÁP CHỮA CHÁY 11
II.1 DẬP LỬA 11
II.2 DỌN DẸP 12
II.3 CÔNG TÁC BÁO CÁO, ĐIỀU TRA NGUYÊN NHÂN VÀ TRÁCH NHIỆM SỰ CỐ 12 III QUY ĐỊNH CHUNG TRÊN CÔNG TRƯỜNG: 16
Trang 2CHƯƠNG III QUY TRÌNH QUẢN LÝ CHẤT LƯỢNG CỦA NHÀ THẦU 21
I CƠ SỞ LẬP BIỆN PHÁP 21
I.1 TIÊU CHUẨN THI CÔNG VÀ NGHIỆM THU HỆ THỐNG ĐIỆN, ĐIỆN NHẸ 21
I.2 TIÊU CHUẨN NGHIỆM THU HỆ THỐNG CẤP THOÁT NƯỚC 22
I.3 TIÊU CHUẨN THI CÔNG VÀ NGHIỆM THU HỆ THỐNG ĐHKK 22
II QUY TRÌNH QUẢN LÝ CHẤT LƯỢNG CỦA NHÀ THẦU 23
II.1 CÁC CÔNG TÁC CHUẨN BỊ 23
II.2 MỘT SỐ QUY ĐỊNH CHUNG 23
II.3 QUY TRÌNH QUẢN LÝ CHẤT LƯỢNG 24
II.3.1 TRÌNH MẪU VẬT TƯ 24
II.3.2 LẬP BẢN VẼ THI CÔNG 24
II.3.3 CHUẨN BỊ VẬT TƯ 24
II.3.4 QUY TRÌNH NGHIỆM THU CÔNG VIỆC XÂY DỰNG 26
II.3.5 CHUẨN BỊ MẶT BẰNG 26
CHƯƠNG IV: BIỆN PHÁP THI CÔNG CHI TIẾT 27
PHẦN I: BIỆN PHÁP THI CÔNG HỆ THỐNG ĐIỆN 27
I BIỆN PHÁP THI CÔNG LẮP ĐẶT MÁY BIẾN ÁP 27
I.1 CÔNG TÁC CHUẨN BỊ 27
I.2 CÔNG TÁC LẮP ĐẶT 28
I.3 CÔNG TÁC KIỂM TRA CHẠY THỬ, THỬ NGHIỆM VÀ ĐÓNG ĐIỆN 31
I.4 CÔNG TÁC NGHIỆM THU 32
II BIỆN PHÁP LẮP ĐẶT MÁY PHÁT ĐIỆN 32
II.1 CÔNG TÁC CHUẨN BỊ 32
II.2 CÔNG TÁC LẮP ĐẶT 33
II.3 CÔNG TÁC KIỂM TRA CHẠY THỬ: 36
II.4 CÔNG TÁC NGHIỆM THU 36
III BIỆN PHÁP THI CÔNG LẮP ĐẶT THIẾT BỊ TỦ ĐIỆN 36
III.1 CÔNG TÁC CHUẨN BỊ 36
III.2 CÔNG TÁC LẮP ĐẶT 37
III.3 KIỂM TRA CHẠY THỬ VÀ THỬ NGHIỆM ĐÓNG ĐIỆN 40
III.4 CÔNG TÁC NGHIỆM THU 41
IV BIỆN PHÁP THI CÔNG LẮP ĐẶT ỐNG ĐIỆN 41
IV.1 CÔNG TÁC CHUẨN BỊ 41
IV.2 CÔNG TÁC LẮP ĐẶT 42
Trang 3IV.2.1 XÁC ĐỊNH VỤ TRÍ 42
IV.2.2 LẮP ĐẶT ỐNG, ĐẾ ÂM 42
IV.2.3 LẮP ĐẶT ỐNG ĐI ÂM TƯỜNG 43
IV.2.4 LẮP ĐẶT ỐNG ĐI NỔI TRÊN TRẦN 45
IV.2.5 LẮP ĐẶT ỐNG ĐI ÂM SÀN 45
IV.2.7 BẢO VỆ ỐNG LUỒN, ĐẾ ÂM, HỘP NỐI 46
IV.3 CÔNG TÁC KIỂM TRA CÂN CHỈNH 46
IV.4 CÔNG TÁC NGHIỆM THU 46
V BIỆN PHÁP THI CÔNG LẮP ĐẶT THANG MÁNG CÁP 46
V.1 CÔNG TÁC CHUẨN BỊ 46
V.2 CÔNG TÁC LẮP ĐẶT 47
V.3 CÔNG TÁC KIỂM TRA, CÂN CHỈNH 51
V.4 CÔNG TÁC NGHIỆM THU 51
VI BIỆN PHÁP THI CÔNG KÉO RẢI DÂY 52
VI.1 CÔNG TÁC CHUẨN BỊ 52
VI.2 CÔNG TÁC LẮP ĐẶT 52
VI.3 CÔNG TÁC KIỂM TRA, CÂN CHỈNH, THỬ NGHIỆM, ĐÓNG ĐIỆN, KIỂM RA CÁP ĐIỆN 54
VI.4 CÔNG TÁC NGHIỆM THU 55
VII BIỆN PHÁP THI CÔNG LẮP ĐẶT THIẾT BỊ ĐÈN, QUẠT, CÔNG TẮC, Ổ CẮM 55
VII.1 CÔNG TÁC CHUẨN BỊ 55
VII.2 CÔNG TÁC LẮP ĐẶT 56
VII.3 CÔNG TÁC KIỂM TRA CÂN CHỈNH, THỬ NGHIỆM VÀ ĐÓNG ĐIỆN 61
VII.4 CÔNG TÁC NGHIỆM THU 62
VIII BIỆN PHÁP THI CÔNG HỆ THỐNG TIẾP ĐỊA 62
VII.1 CÔNG TÁC CHUẨN BỊ: 62
VIII.2 CÔNG TÁC LẮP ĐẶT 63
VIII.3 KIỂM TRA HOÀN THIỆN HỆ THỐNG TIẾP ĐỊA 66
VIII.4 CÔNG TÁC NGHIỆM THU 66
IX BIỆN PHÁP THI CÔNG HỆ THỐNG CHỐNG SÉT 66
IX.1 KHẢO SÁT 66
IX.2 CÁC BƯỚC THỰC HIỆN 66
XI.3 CÔNG TÁC NGHIỆM THU 67
PHẦN II: BIỆN PHÁP THI CÔNG HỆ THỐNG ĐIỆN NHẸ 68
Trang 4I CÔNG TÁC CHUẨN BỊ 68
I.1 TẬP KẾT, KIỂM DUYỆT VẬT TƯ THIẾT BỊ: 68
I.2 BIỆN PHÁP AN TOÀN: 68
I.3 BẢN VẼ SHOP DRAWING ĐƯỢC PHÊ DUYỆT 68
I.4 CHUẨN BỊ VẬT TƯ THIẾT BỊ 68
I.5 KIỂM TRA THIẾT BỊ ĐO VÀ DỤNG CỤ THI CÔNG ĐẢM BẢO HOẠT ĐỘNG TỐT VÀ ANN TOÀN 68
II CÔNG TÁC LẮP ĐẶT 69
II.1 LẮP ĐẶT ỐNG PVC LUỒN DÂY ÂM TƯỜNG 69
II.2 LẮP ĐẶT HỆ THỐNG MÁNG CÁP 70
III.3 LẮP ĐẶT KÉO RẢI, LUỒN CÁP: 71
III.4 LẮP ĐẶT Ổ CẮM VÀ THIẾT BỊ 72
III.4.1 KIỂM TRA DÂY VÀ LẮP Ổ CẮM MẠNG, ĐIỆN THOẠI 72
III.4.2 KIỂM TRA DÂY NGUỒN, DÂY TÍN HIỆU VÀ LẮP ĐẶT THIẾT BỊ HỆ CTTV/ CAMERA QUAN SÁT 73
III.4.3 KIỂM TRA DÂY NGUỒN, DÂY TÍN HIỆU VÀ LẮP ĐẶT THIẾT BỊ HỆ PA/ ÂM THANH THÔNG BÁO 74
III.5 CÔNG TÁC VẬN HÀNH THỬ VÀ BÀN GIAO HỆ THỐNG 76
III.6 CÔNG TÁC NGHIỆM THU 76
PHẦN III: BIỆN PHÁP THI CÔNG HỆ THỐNG CẤP THOÁT NƯỚC 77
I CÔNG TÁC CHUẨN BỊ 77
I.1 CHUẨN BỊ MẶT BẰNG THI CÔNG 77
II.2 CHUẨN BỊ MÁY MÓC THIẾT BỊ VẬT TƯ THI CÔNG 77
II CÔNG TÁC LẮP ĐẶT 77
II 1 LẮP ĐẶT HỆ THỐNG ỐNG CẤP NƯỚC 77
II.1.1 TRÌNH TỰ THI CÔNG HỆ THỐNG CẤP THOÁY NƯỚC TRỤC ĐỨNG NGOÀI WC 77
II.1.2 TRÌNH TỰ THI CÔNG HỆ THỐNG CẤP NƯỚC TRONG WC 80
II.1.3 CÁC BIỆN PHÁP KỸ THUẬT ĐẤU NỐI ĐƯỜNG ỐNG 81
II.1.4 NGHIỆM THU THỬ ÁP LỰC 89
II.1.5 BIỆN PHÁP THI CÔNG HOÀN TRẢ BỀ MẶT TƯỜNG VÀ CĂN CHỈNH HỌNG CẤP NƯỚC CỦA CÁC THIẾT BỊ 92
II.2 LẮP ĐẶT HỆ THỐNG THOÁT NƯỚC 92
II.2.1 LẮP ĐẶT ĐƯỜNG ỐNG THOÁT NƯỚC BẰNG PHƯƠNG PHÁP DÁN KEO 92
II.2.2 TRÌNH TỰ THI CÔNG HỆ THỐNG ĐƯỜNG ỐNG THOÁT NƯỚC 93
Trang 5II.2.3 CÁC BIỆN PHÁP KỸ THUẬT ĐẤU NỐI ĐƯỜNG ỐNG 95
II.2.4 BIỆN PHÁP TRÁM, CHỐNG THẤM LỖ ĐƯỜNG ỐNG THOÁT NƯỚC 99
II.2.5 BIỆN PHÁP KIỂM TRA LẮP ĐẶT VÀ THỬ KÍN ĐƯỜNG ỐNG THOÁT NƯỚC.99 II.3 BIỆN PHÁP THI CÔNG LẮP ĐẶT THIẾT BỊ VỆ SINH 100
II.4 LẮP ĐẶT BƠM 109
II.4.1 BIỆN PHÁP LẮP ĐẶT BƠM CẤP NƯỚC 109
II.4.2 BIỆN PHÁP LẮP ĐẶT BƠM CHÌM 111
II.5 LẮP ĐẶT HỆ THỐNG XLNT 112
II.5.1 BIỆN PHÁP LẮP ĐẶT MÁY THỔI KHÍ 112
II.5.2 BIỆN PHÁP LẮP ĐẶT BƠM NƯỚC THẢI, BƠM BÙN CHÌM 113
II.5.3 BIỆN PHÁP LẮP ĐẶT BƠM ĐỊNH LƯỢNG HÓA CHẤT 114
II.5.4 BIỆN PHÁP LẮP ĐẶT THIẾT BỊ ĐO MỰC NƯỚC 114
II.5.5 BIỆN PHÁP LẮP ĐẶT BỒN HÓA CHẤT 115
II.5.6 BIỆN PHÁP LẮP ĐẶT CÁC MOTOR KHUẤY 116
II.5.7 KIỂM TRA VÀ CHẠY THỬ 116
II.5.7.1 KIỂM TRA VÀ CHẠY THỬ PHẦN CƠ 116
II.5.7.2 TEST HỆ THỐNG PHẦN ĐIỀU KHIỂN 117
II.6 NGHIỆM THU, CHẠY THỬ, BÀN GIAO 118
II.6.1 CHẠY THỬ ĐƯỜNG ỐNG CẤP THOÁT NƯỚC 118
II.6.2 KIỂM TRA THIẾT BỊ VỆ SINH 118
II.6.3 CHẠY THỬ HỆ THỐNG XLNT 119
PHẦN IV: BIỆN PHÁP THI CÔNG HỆ THỐNG ĐIỀU HÒA, THÔNG GIÓ 120
I CÁC CÔNG TÁC CHUẨN BỊ 120
II CHI TIẾT LẮP ĐẶT 121
II.1 BIỆN PHÁP LẮP ĐẶT HỆ THỐNG ĐIỀU HÒA 121
II.1.1 BIỆN PHÁP LẮP ĐẶT THIẾT BỊ HỆ THỐNG LẠNH 121
II.1.1.1 QUY TRÌNH LẮP ĐẶT VÀ GIÁM SÁT LẮP ĐẶT MÁY LẠNH 121
II.1.1.2 LẮP ĐẶT GIÀN NÓNG (OUTDOOR UNIT) 122
II.1.1.3 LẮP ĐẶT GIÀN LẠNH (INDOOR UNIT) 123
II.1.1.4 LẮP ĐẶT FCU 123
II.1.2 GIA CÔNG LẮP ĐẶT ỐNG DẪN MÔI CHẤT LẠNH 126
II.1.2.1 QUY TRÌNH LẮP ĐẶT VÀ GIÁM SÁT 126
II.1.2.2 LẮP ĐẶT ỐNG ĐỒNG 127
II.1.2.3 LẮP ĐẶT BỘ CHIA GAS 129
Trang 6II.1.2.4 PHƯƠNG PHÁP HÀN ỐNG 130
II.1.2.5 BIỆN PHÁP THỔI NITƠ TRONG LÚC HÀN 131
II.1.2.6 THỬ KÍN ĐƯỜNG ỐNG 132
II.1.2.7 LOE ỐNG VÀ NỐI GIÀN LẠNH 132
II.1.2.8 BỌC CÁCH NHIỆT ỐNG ĐỒNG 133
II.1.3 LẮP ĐẶT ỐNG THOÁT NƯỚC NGƯNG 134
II.1.3.1 QUY TRÌNH LẮP ĐẶT VÀ GIÁM SÁT 134
II.1.3.2 LẮP ĐẶT ỐNG VÀ CÁCH NHIỆT 135
II.1.3.3 KẾT NỐI VỚI GIÀN LẠNH 135
II.2 LẮP ĐẶT HỆ THỐNG THÔNG GIÓ 137
II.2.1 LẮP ĐẶT HỆ THỐNG ỐNG GIÓ 137
II.2.1.1 QUY TRÌNH LẮP ĐẶT VÀ GIÁM SÁT 137
II.2.1.2 CHẾ TẠO ỐNG GIÓ TẠI XƯỞNG 138
II.2.1.3 BỌC CÁCH NHIỆT ỐNG GIÓ LẠNH 138
II.2.1.4 LẮP ĐẶT ỐNG GIÓ, MIỆNG GIÓ, VAN GIÓ 139
II.2.1.5 THỬ KÍN ĐƯỜNG ỐNG GIÓ 147
II.2.2 BIỆN PHÁP THI CÔNG LẮP ĐẶT QUẠT 148
II.3 LẮP ĐẶT HỆ THỐNG ĐIỆN (MÁNG ĐIỆN, ỐNG LUỒN CÁP, TỦ ĐIỆN, DÂY NGUỒN, DÂY ĐIỀU KHIỂN) 152
II.3.1 QUY TRÌNH LẮP ĐẶT VÀ GIÁM SÁT 152
II.3.2 QUY ĐỊNH CHUNG 153
II.3.3 QUY TRÌNH LẮP ĐẶT 153
III KIỂM TRA THỬ NGHIỆM 155
III.1 CHẾ TẠO VÀ LẮP ĐẶT: 155
III.2 TỦ ĐIỆN VÀ CÁC CÔNG TƠ ĐIỆN 156
KẾT LUẬN 157