Logistics and execution... Treatment result prediction Fluid selection Operational stimulation program Operational constraints Scheduling and logistics Site preparation Job executio
Trang 1Logistics and execution
Trang 2Treatment result prediction
Fluid selection
Operational stimulation program
Operational constraints
Scheduling and logistics
Site preparation
Job execution
Evaluation cycle
Proppant selection
Trang 4Chemical storage Tool shed
Proppant storage
Surface facilities, vent line, etc
High Pressure Area
to marked with e.g red tape
Wellhead
Preferential wind direction
HP Pumps and manifold
Blending
Lay‐out of equipment
Trang 5Lay‐out of equipment
Trang 6Lay‐out of equipment
Trang 7Site prepara2on‐offshore
Trang 13Frac execu2on
Trang 15Severity of earthquakes
Trang 17Station geometry
Trang 18Vibration measurements at the nearby Church
from 16.06.2014 to 23.06.2014
All vibrations far below the limit (DIN 4150)
Trang 20Groundwater Ground
Air
Radioactivity Mercury Noise
Conclusion
Trang 22Metalle, Nebenbestandteile
Aluminium, Bor, Bromid, Antimon, Selen, Arsen, Blei, Cadmium, Chrom, Kupfer, Nickel, Zink, Bromid, Molybdän, Titan, Zinn, Barium, Beryllium, Uran, Thallium, Vanadium, Kobalt (Bestimmung mittels ICP‐
Trang 23¥ Datalogger for continuous monitoring
¥ Independent lab conducted sampling and
analysis
Trang 33Treatment result prediction
Fluid selection
Operational stimulation program
Operational constraints
Scheduling and logistics
Site preparation
Job execution
Evaluation cycle
Proppant selection
Trang 36‐ Gas wells ‐
Trang 37Post‐fracture bean‐up procedure