3ヶ 月ごとの 点検 Quarte‖ y inspecJon*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数60を超 える場 合 にあつては60とする *l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the
Trang 1Rcvised On Novcmber ist, 2008
2003年 版消防設備用 保守点検 日誌 (2000年 SOLAS条 約 第 Ⅱ‐ 2章 E部 第 14規 則)
MAINttENANCE LOG
FOR
FIRE PRO丁EC丁10N SYSttEMS
AND FIRE― FIGH丁 ING SYSTEMS AND APPLiANCES
(CHAPTER Ⅱ-2,MG14 SOLAS 2000ANIEblDNIENT)
Trang 2Rcviscd on Novcmbcr ist, 2008
Panama Merchant Marine Circular No.122
2 Guidance for rnaintenance and inspection
(1)InSpection itcms shall bc added and/or deleted as necessary
(2)Refer to the maker's instruction book of cach installations or flre safety operationalbooklct、vhen maintenance is made
(3)IPraCtiCe monthly inspection according to this checklist and inake entries oftheir conditionand maintenance has been carried outin Remarks
3 Writing of ntttntenance Log
O Good condition
O Portable foam extillguishcrs rcf11lcd by ship's hands
O Firc hose at Bridge port wing wasrenewed
O Emergency flre ptllnp was overhauled by ship's hands
…
NS UNITED DIARINE Co.,Ltd
Trang 3Reviscd on Novcmbcr lst,2008
,肖り警没併龍要ロヨ疑 Particulars of Fire protection systems and fire fighting systems
l.消 火 ポンプ Fire pumps
名フト/Nalne of ire pump 数旨 No.
非常用消火 ポ ンプ/Emettency ire pump
3.消火 ホ ー ス 及 び ノズル Fire Hoses and nozJes
位 置/Locttion 消 火 ホ ー ス/Firc hoscs ノ ヌざル/Nozzles
サイ ズ/Size 数 量 /No. ノ ズ ル/Nozzles 数量 /No.
Trang 4Rcviscd on Novcmbcr lst, 2008
6.持 ち運 び式泡7肖火器 9L portable foaln e nguishers
Da“ofRef11led Chcmical
‐
NS UNITED IARINE Co.,Ltd
Trang 6Rcviscd on Novcmbcr lst, 2008
機 関 区域 の 消 火 装 置 Fire extinguishing arrangements in machinery spaces 9.固 定式消火装置 Fixed ire extinguishing system
10.固 定式局所消火装置 Fixed Loc」 tre e nguishing sys"m
11.固 定式/移動 式 消火器 Fixed/Movable ire extinguishers
Trang 72年 以上 の間隔 の 点検 Over two years seⅣ ice
No 項 目 item 点検間隔Period
点 検 日Date of
002■xed system contents shali be verifled and air sha‖ be b!own through the
piping of extinguishing gas system by maker
3
持ち運 び式泡放 射器 消 火剤 交換
Fcam‖quid for portable foam applicator unit sha‖ be replaced
原液有 効期 限 Ex,re date Of form( )
*(1)
4
持ち運び式粉末消火器消火剤交換
Portable dry chenlical輌 re extinguishers― powder renewal
All(100%)C02 cylinders from the nxed ire― extinguishing systems sha!l be
hydrostatica‖y tested by maker
Trang 8All portable lre extinguishers are checked proper location and condition
according to the ship's lre contro!plan
Ali seif=contained breathing apparatus should be checked external condition
and present pressure(include spare bottie)
All accessible components of flxed lre― ■ghting systems are visua‖ y inspected
for proper condition
*3 The first periodical control of fixed foam fire― extinguishing system and foam concentrates stored on board sha‖
be performed after a period of 3 years(from the Original insta‖ ation date),after that,every year A record of the age
of the concentrates and of subsequent controi shouid be kept on board readi!y ava‖ able for inspectiOn
Periodical controls or analysis wili be perFOrrned by an independent or manufacture's iaboratory,which is accepted by theRecognized Organization issuing the partinent safety certificate
Trang 10月ごとの 点検 Month inspeC On
貢 任 看P.I.C
Radio communication equipments are to be operated
双 方 向無線機 Two way VHF radio telephone:
Trang 113ヶ 月ごとの 点検 Quarte‖ y inspecJon
*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)
*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for
recharging shou!d be carried out on board
6ヶ 月ごとの点検 Semi― annud inspecJon
Lockers providing storage for ttre― ■ghting equipment contain proper inventory and
equipment is in proper condition
C/0
5
*1詰め替え用 消 火剤 数量確 認
*l Ref‖ s for portable ire extinguishers are to be checked
O泡消 火器 消 火剤for AB foam ire ex nguishers
○粉末消火器消火剤for dry chemical ire exunguishers
数量/quanlty
C/0 C/0
6
固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩
みがないこと
A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for
tightness on ixed ttre― extinguishing insta‖ations.
Trang 14月ごとの 点検 Month inspeC On
貢 任 看P.I.C
Radio communication equipments are to be operated
双 方 向無線機 Two way VHF radio telephone:
Trang 153ヶ 月ごとの 点検 Quarte‖ y inspecJon
*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)
*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for
recharging shou!d be carried out on board
6ヶ 月ごとの点検 Semi― annud inspecJon
Lockers providing storage for ttre― ■ghting equipment contain proper inventory and
equipment is in proper condition
C/0
5
*1詰め替え用 消 火剤 数量確 認
*l Ref‖ s for portable ire extinguishers are to be checked
O泡消 火器 消 火剤for AB foam ire ex nguishers
○粉末消火器消火剤for dry chemical ire exunguishers
数量/quanlty
C/0 C/0
6
固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩
みがないこと
A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for
tightness on ixed ttre― extinguishing insta‖ations.
Trang 18月ごとの 点検 Month inspeC On
貢 任 看P.I.C
Radio communication equipments are to be operated
双 方 向無線機 Two way VHF radio telephone:
Trang 193ヶ 月ごとの 点検 Quarte‖ y inspecJon
*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)
*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for
recharging shou!d be carried out on board
6ヶ 月ごとの点検 Semi― annud inspecJon
Lockers providing storage for ttre― ■ghting equipment contain proper inventory and
equipment is in proper condition
C/0
5
*1詰め替え用 消 火剤 数量確 認
*l Ref‖ s for portable ire extinguishers are to be checked
O泡消 火器 消 火剤for AB foam ire ex nguishers
○粉末消火器消火剤for dry chemical ire exunguishers
数量/quanlty
C/0 C/0
6
固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩
みがないこと
A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for
tightness on ixed ttre― extinguishing insta‖ations.
Trang 22月ごとの 点検 Month inspeC On
貢 任 看P.I.C
Radio communication equipments are to be operated
双 方 向無線機 Two way VHF radio telephone:
Trang 233ヶ 月ごとの 点検 Quarte‖ y inspecJon
*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)
*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for
recharging shou!d be carried out on board
6ヶ 月ごとの点検 Semi― annud inspecJon
Lockers providing storage for ttre― ■ghting equipment contain proper inventory and
equipment is in proper condition
C/0
5
*1詰め替え用 消 火剤 数量確 認
*l Ref‖ s for portable ire extinguishers are to be checked
O泡消 火器 消 火剤for AB foam ire ex nguishers
○粉末消火器消火剤for dry chemical ire exunguishers
数量/quanlty
C/0 C/0
6
固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩
みがないこと
A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for
tightness on ixed ttre― extinguishing insta‖ations.
Trang 26月ごとの 点検 Month inspeC On
貢 任 看P.I.C
Radio communication equipments are to be operated
双 方 向無線機 Two way VHF radio telephone:
Trang 273ヶ 月ごとの 点検 Quarte‖ y inspecJon
*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)
*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for
recharging shou!d be carried out on board
6ヶ 月ごとの点検 Semi― annud inspecJon
Lockers providing storage for ttre― ■ghting equipment contain proper inventory and
equipment is in proper condition
C/0
5
*1詰め替え用 消 火剤 数量確 認
*l Ref‖ s for portable ire extinguishers are to be checked
O泡消 火器 消 火剤for AB foam ire ex nguishers
○粉末消火器消火剤for dry chemical ire exunguishers
数量/quanlty
C/0 C/0
6
固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩
みがないこと
A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for
tightness on ixed ttre― extinguishing insta‖ations.
Trang 30月ごとの 点検 Month inspeC On
貢 任 看P.I.C
Radio communication equipments are to be operated
双 方 向無線機 Two way VHF radio telephone:
Trang 313ヶ 月ごとの 点検 Quarte‖ y inspecJon
*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)
*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for
recharging shou!d be carried out on board
6ヶ 月ごとの点検 Semi― annud inspecJon
Lockers providing storage for ttre― ■ghting equipment contain proper inventory and
equipment is in proper condition
C/0
5
*1詰め替え用 消 火剤 数量確 認
*l Ref‖ s for portable ire extinguishers are to be checked
O泡消 火器 消 火剤for AB foam ire ex nguishers
○粉末消火器消火剤for dry chemical ire exunguishers
数量/quanlty
C/0 C/0
6
固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩
みがないこと
A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for
tightness on ixed ttre― extinguishing insta‖ations.
Trang 34月ごとの 点検 Month inspeC On
貢 任 看P.I.C
Radio communication equipments are to be operated
双 方 向無線機 Two way VHF radio telephone:
Trang 353ヶ 月ごとの 点検 Quarte‖ y inspecJon
*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)
*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for
recharging shou!d be carried out on board
6ヶ 月ごとの点検 Semi― annud inspecJon
Lockers providing storage for ttre― ■ghting equipment contain proper inventory and
equipment is in proper condition
C/0
5
*1詰め替え用 消 火剤 数量確 認
*l Ref‖ s for portable ire extinguishers are to be checked
O泡消 火器 消 火剤for AB foam ire ex nguishers
○粉末消火器消火剤for dry chemical ire exunguishers
数量/quanlty
C/0 C/0
6
固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩
みがないこと
A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for
tightness on ixed ttre― extinguishing insta‖ations.
Trang 38月ごとの 点検 Month inspeC On
貢 任 看P.I.C
Radio communication equipments are to be operated
双 方 向無線機 Two way VHF radio telephone:
Trang 393ヶ 月ごとの 点検 Quarte‖ y inspecJon
*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)
*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for
recharging shou!d be carried out on board
6ヶ 月ごとの点検 Semi― annud inspecJon
Lockers providing storage for ttre― ■ghting equipment contain proper inventory and
equipment is in proper condition
C/0
5
*1詰め替え用 消 火剤 数量確 認
*l Ref‖ s for portable ire extinguishers are to be checked
O泡消 火器 消 火剤for AB foam ire ex nguishers
○粉末消火器消火剤for dry chemical ire exunguishers
数量/quanlty
C/0 C/0
6
固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩
みがないこと
A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for
tightness on ixed ttre― extinguishing insta‖ations.
Trang 42月ごとの 点検 Month inspeC On
貢 任 看P.I.C
Radio communication equipments are to be operated
双 方 向無線機 Two way VHF radio telephone:
Trang 433ヶ 月ごとの 点検 Quarte‖ y inspecJon
*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)
*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for
recharging shou!d be carried out on board
6ヶ 月ごとの点検 Semi― annud inspecJon
Lockers providing storage for ttre― ■ghting equipment contain proper inventory and
equipment is in proper condition
C/0
5
*1詰め替え用 消 火剤 数量確 認
*l Ref‖ s for portable ire extinguishers are to be checked
O泡消 火器 消 火剤for AB foam ire ex nguishers
○粉末消火器消火剤for dry chemical ire exunguishers
数量/quanlty
C/0 C/0
6
固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩
みがないこと
A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for
tightness on ixed ttre― extinguishing insta‖ations.
Trang 46月ごとの 点検 Month inspeC On
貢 任 看P.I.C
Radio communication equipments are to be operated
双 方 向無線機 Two way VHF radio telephone:
Trang 473ヶ 月ごとの 点検 Quarte‖ y inspecJon
*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)
*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for
recharging shou!d be carried out on board
6ヶ 月ごとの点検 Semi― annud inspecJon
Lockers providing storage for ttre― ■ghting equipment contain proper inventory and
equipment is in proper condition
C/0
5
*1詰め替え用 消 火剤 数量確 認
*l Ref‖ s for portable ire extinguishers are to be checked
O泡消 火器 消 火剤for AB foam ire ex nguishers
○粉末消火器消火剤for dry chemical ire exunguishers
数量/quanlty
C/0 C/0
6
固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩
みがないこと
A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for
tightness on ixed ttre― extinguishing insta‖ations.
Trang 50月ごとの 点検 Month inspeC On
貢 任 看P.I.C
Radio communication equipments are to be operated
双 方 向無線機 Two way VHF radio telephone:
Trang 513ヶ 月ごとの 点検 Quarte‖ y inspecJon
*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)
*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for
recharging shou!d be carried out on board
6ヶ 月ごとの点検 Semi― annud inspecJon
Lockers providing storage for ttre― ■ghting equipment contain proper inventory and
equipment is in proper condition
C/0
5
*1詰め替え用 消 火剤 数量確 認
*l Ref‖ s for portable ire extinguishers are to be checked
O泡消 火器 消 火剤for AB foam ire ex nguishers
○粉末消火器消火剤for dry chemical ire exunguishers
数量/quanlty
C/0 C/0
6
固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩
みがないこと
A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for
tightness on ixed ttre― extinguishing insta‖ations.
Trang 54月ごとの 点検 Month inspeC On
貢 任 看P.I.C
Radio communication equipments are to be operated
双 方 向無線機 Two way VHF radio telephone:
Trang 553ヶ 月ごとの 点検 Quarte‖ y inspecJon
*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)
*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for
recharging shou!d be carried out on board
6ヶ 月ごとの点検 Semi― annud inspecJon
Lockers providing storage for ttre― ■ghting equipment contain proper inventory and
equipment is in proper condition
C/0
5
*1詰め替え用 消 火剤 数量確 認
*l Ref‖ s for portable ire extinguishers are to be checked
O泡消 火器 消 火剤for AB foam ire ex nguishers
○粉末消火器消火剤for dry chemical ire exunguishers
数量/quanlty
C/0 C/0
6
固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩
みがないこと
A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for
tightness on ixed ttre― extinguishing insta‖ations.
Trang 58月ごとの 点検 Month inspeC On
貢 任 看P.I.C
Radio communication equipments are to be operated
双 方 向無線機 Two way VHF radio telephone: