3ヶ 月ごとの 点検 Quarte‖ y inspecJon*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数60を超 える場 合 にあつては60とする *l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the

Trang 1

Rcvised On Novcmber ist, 2008

2003年 版消防設備用 保守点検 日誌 (2000年 SOLAS条 約 第 Ⅱ‐ 2章 E部 第 14規 則)

MAINttENANCE LOG

FOR

FIRE PRO丁EC丁10N SYSttEMS

AND FIRE― FIGH丁 ING SYSTEMS AND APPLiANCES

(CHAPTER Ⅱ-2,MG14 SOLAS 2000ANIEblDNIENT)

Trang 2

Rcviscd on Novcmbcr ist, 2008

Panama Merchant Marine Circular No.122

2 Guidance for rnaintenance and inspection

(1)InSpection itcms shall bc added and/or deleted as necessary

(2)Refer to the maker's instruction book of cach installations or flre safety operationalbooklct、vhen maintenance is made

(3)IPraCtiCe monthly inspection according to this checklist and inake entries oftheir conditionand maintenance has been carried outin Remarks

3 Writing of ntttntenance Log

O Good condition

O Portable foam extillguishcrs rcf11lcd by ship's hands

O Firc hose at Bridge port wing wasrenewed

O Emergency flre ptllnp was overhauled by ship's hands

NS UNITED DIARINE Co.,Ltd

Trang 3

Reviscd on Novcmbcr lst,2008

,肖り警没併龍要ロヨ疑 Particulars of Fire protection systems and fire fighting systems

l.消 火 ポンプ Fire pumps

名フト/Nalne of ire pump 数旨 No.

非常用消火 ポ ンプ/Emettency ire pump

3.消火 ホ ー ス 及 び ノズル Fire Hoses and nozJes

位 置/Locttion 消 火 ホ ー ス/Firc hoscs ノ ヌざル/Nozzles

サイ ズ/Size 数 量 /No. ノ ズ ル/Nozzles 数量 /No.

Trang 4

Rcviscd on Novcmbcr lst, 2008

6.持 ち運 び式泡7肖火器 9L portable foaln e nguishers

Da“ofRef11led Chcmical

NS UNITED IARINE Co.,Ltd

Trang 6

Rcviscd on Novcmbcr lst, 2008

機 関 区域 の 消 火 装 置 Fire extinguishing arrangements in machinery spaces 9.固 定式消火装置 Fixed ire extinguishing system

10.固 定式局所消火装置 Fixed Loc」 tre e nguishing sys"m

11.固 定式/移動 式 消火器 Fixed/Movable ire extinguishers

Trang 7

2年 以上 の間隔 の 点検 Over two years seⅣ ice

No 項 目 item 点検間隔Period

点 検 日Date of

002■xed system contents shali be verifled and air sha‖ be b!own through the

piping of extinguishing gas system by maker

3

持ち運 び式泡放 射器 消 火剤 交換

Fcam‖quid for portable foam applicator unit sha‖ be replaced

原液有 効期 限 Ex,re date Of form( )

*(1)

4

持ち運び式粉末消火器消火剤交換

Portable dry chenlical輌 re extinguishers― powder renewal

All(100%)C02 cylinders from the nxed ire― extinguishing systems sha!l be

hydrostatica‖y tested by maker

Trang 8

All portable lre extinguishers are checked proper location and condition

according to the ship's lre contro!plan

Ali seif=contained breathing apparatus should be checked external condition

and present pressure(include spare bottie)

All accessible components of flxed lre― ■ghting systems are visua‖ y inspected

for proper condition

*3 The first periodical control of fixed foam fire― extinguishing system and foam concentrates stored on board sha‖

be performed after a period of 3 years(from the Original insta‖ ation date),after that,every year A record of the age

of the concentrates and of subsequent controi shouid be kept on board readi!y ava‖ able for inspectiOn

Periodical controls or analysis wili be perFOrrned by an independent or manufacture's iaboratory,which is accepted by theRecognized Organization issuing the partinent safety certificate

Trang 10

月ごとの 点検 Month inspeC On

貢 任 看P.I.C

Radio communication equipments are to be operated

双 方 向無線機 Two way VHF radio telephone:

Trang 11

3ヶ 月ごとの 点検 Quarte‖ y inspecJon

*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)

*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for

recharging shou!d be carried out on board

6ヶ 月ごとの点検 Semi― annud inspecJon

Lockers providing storage for ttre― ■ghting equipment contain proper inventory and

equipment is in proper condition

C/0

5

*1詰め替え用 消 火剤 数量確 認

*l Ref‖ s for portable ire extinguishers are to be checked

O泡消 火器 消 火剤for AB foam ire ex nguishers

○粉末消火器消火剤for dry chemical ire exunguishers

数量/quanlty

C/0 C/0

6

固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩

みがないこと

A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for

tightness on ixed ttre― extinguishing insta‖ations.

Trang 14

月ごとの 点検 Month inspeC On

貢 任 看P.I.C

Radio communication equipments are to be operated

双 方 向無線機 Two way VHF radio telephone:

Trang 15

3ヶ 月ごとの 点検 Quarte‖ y inspecJon

*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)

*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for

recharging shou!d be carried out on board

6ヶ 月ごとの点検 Semi― annud inspecJon

Lockers providing storage for ttre― ■ghting equipment contain proper inventory and

equipment is in proper condition

C/0

5

*1詰め替え用 消 火剤 数量確 認

*l Ref‖ s for portable ire extinguishers are to be checked

O泡消 火器 消 火剤for AB foam ire ex nguishers

○粉末消火器消火剤for dry chemical ire exunguishers

数量/quanlty

C/0 C/0

6

固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩

みがないこと

A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for

tightness on ixed ttre― extinguishing insta‖ations.

Trang 18

月ごとの 点検 Month inspeC On

貢 任 看P.I.C

Radio communication equipments are to be operated

双 方 向無線機 Two way VHF radio telephone:

Trang 19

3ヶ 月ごとの 点検 Quarte‖ y inspecJon

*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)

*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for

recharging shou!d be carried out on board

6ヶ 月ごとの点検 Semi― annud inspecJon

Lockers providing storage for ttre― ■ghting equipment contain proper inventory and

equipment is in proper condition

C/0

5

*1詰め替え用 消 火剤 数量確 認

*l Ref‖ s for portable ire extinguishers are to be checked

O泡消 火器 消 火剤for AB foam ire ex nguishers

○粉末消火器消火剤for dry chemical ire exunguishers

数量/quanlty

C/0 C/0

6

固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩

みがないこと

A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for

tightness on ixed ttre― extinguishing insta‖ations.

Trang 22

月ごとの 点検 Month inspeC On

貢 任 看P.I.C

Radio communication equipments are to be operated

双 方 向無線機 Two way VHF radio telephone:

Trang 23

3ヶ 月ごとの 点検 Quarte‖ y inspecJon

*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)

*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for

recharging shou!d be carried out on board

6ヶ 月ごとの点検 Semi― annud inspecJon

Lockers providing storage for ttre― ■ghting equipment contain proper inventory and

equipment is in proper condition

C/0

5

*1詰め替え用 消 火剤 数量確 認

*l Ref‖ s for portable ire extinguishers are to be checked

O泡消 火器 消 火剤for AB foam ire ex nguishers

○粉末消火器消火剤for dry chemical ire exunguishers

数量/quanlty

C/0 C/0

6

固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩

みがないこと

A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for

tightness on ixed ttre― extinguishing insta‖ations.

Trang 26

月ごとの 点検 Month inspeC On

貢 任 看P.I.C

Radio communication equipments are to be operated

双 方 向無線機 Two way VHF radio telephone:

Trang 27

3ヶ 月ごとの 点検 Quarte‖ y inspecJon

*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)

*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for

recharging shou!d be carried out on board

6ヶ 月ごとの点検 Semi― annud inspecJon

Lockers providing storage for ttre― ■ghting equipment contain proper inventory and

equipment is in proper condition

C/0

5

*1詰め替え用 消 火剤 数量確 認

*l Ref‖ s for portable ire extinguishers are to be checked

O泡消 火器 消 火剤for AB foam ire ex nguishers

○粉末消火器消火剤for dry chemical ire exunguishers

数量/quanlty

C/0 C/0

6

固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩

みがないこと

A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for

tightness on ixed ttre― extinguishing insta‖ations.

Trang 30

月ごとの 点検 Month inspeC On

貢 任 看P.I.C

Radio communication equipments are to be operated

双 方 向無線機 Two way VHF radio telephone:

Trang 31

3ヶ 月ごとの 点検 Quarte‖ y inspecJon

*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)

*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for

recharging shou!d be carried out on board

6ヶ 月ごとの点検 Semi― annud inspecJon

Lockers providing storage for ttre― ■ghting equipment contain proper inventory and

equipment is in proper condition

C/0

5

*1詰め替え用 消 火剤 数量確 認

*l Ref‖ s for portable ire extinguishers are to be checked

O泡消 火器 消 火剤for AB foam ire ex nguishers

○粉末消火器消火剤for dry chemical ire exunguishers

数量/quanlty

C/0 C/0

6

固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩

みがないこと

A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for

tightness on ixed ttre― extinguishing insta‖ations.

Trang 34

月ごとの 点検 Month inspeC On

貢 任 看P.I.C

Radio communication equipments are to be operated

双 方 向無線機 Two way VHF radio telephone:

Trang 35

3ヶ 月ごとの 点検 Quarte‖ y inspecJon

*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)

*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for

recharging shou!d be carried out on board

6ヶ 月ごとの点検 Semi― annud inspecJon

Lockers providing storage for ttre― ■ghting equipment contain proper inventory and

equipment is in proper condition

C/0

5

*1詰め替え用 消 火剤 数量確 認

*l Ref‖ s for portable ire extinguishers are to be checked

O泡消 火器 消 火剤for AB foam ire ex nguishers

○粉末消火器消火剤for dry chemical ire exunguishers

数量/quanlty

C/0 C/0

6

固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩

みがないこと

A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for

tightness on ixed ttre― extinguishing insta‖ations.

Trang 38

月ごとの 点検 Month inspeC On

貢 任 看P.I.C

Radio communication equipments are to be operated

双 方 向無線機 Two way VHF radio telephone:

Trang 39

3ヶ 月ごとの 点検 Quarte‖ y inspecJon

*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)

*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for

recharging shou!d be carried out on board

6ヶ 月ごとの点検 Semi― annud inspecJon

Lockers providing storage for ttre― ■ghting equipment contain proper inventory and

equipment is in proper condition

C/0

5

*1詰め替え用 消 火剤 数量確 認

*l Ref‖ s for portable ire extinguishers are to be checked

O泡消 火器 消 火剤for AB foam ire ex nguishers

○粉末消火器消火剤for dry chemical ire exunguishers

数量/quanlty

C/0 C/0

6

固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩

みがないこと

A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for

tightness on ixed ttre― extinguishing insta‖ations.

Trang 42

月ごとの 点検 Month inspeC On

貢 任 看P.I.C

Radio communication equipments are to be operated

双 方 向無線機 Two way VHF radio telephone:

Trang 43

3ヶ 月ごとの 点検 Quarte‖ y inspecJon

*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)

*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for

recharging shou!d be carried out on board

6ヶ 月ごとの点検 Semi― annud inspecJon

Lockers providing storage for ttre― ■ghting equipment contain proper inventory and

equipment is in proper condition

C/0

5

*1詰め替え用 消 火剤 数量確 認

*l Ref‖ s for portable ire extinguishers are to be checked

O泡消 火器 消 火剤for AB foam ire ex nguishers

○粉末消火器消火剤for dry chemical ire exunguishers

数量/quanlty

C/0 C/0

6

固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩

みがないこと

A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for

tightness on ixed ttre― extinguishing insta‖ations.

Trang 46

月ごとの 点検 Month inspeC On

貢 任 看P.I.C

Radio communication equipments are to be operated

双 方 向無線機 Two way VHF radio telephone:

Trang 47

3ヶ 月ごとの 点検 Quarte‖ y inspecJon

*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)

*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for

recharging shou!d be carried out on board

6ヶ 月ごとの点検 Semi― annud inspecJon

Lockers providing storage for ttre― ■ghting equipment contain proper inventory and

equipment is in proper condition

C/0

5

*1詰め替え用 消 火剤 数量確 認

*l Ref‖ s for portable ire extinguishers are to be checked

O泡消 火器 消 火剤for AB foam ire ex nguishers

○粉末消火器消火剤for dry chemical ire exunguishers

数量/quanlty

C/0 C/0

6

固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩

みがないこと

A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for

tightness on ixed ttre― extinguishing insta‖ations.

Trang 50

月ごとの 点検 Month inspeC On

貢 任 看P.I.C

Radio communication equipments are to be operated

双 方 向無線機 Two way VHF radio telephone:

Trang 51

3ヶ 月ごとの 点検 Quarte‖ y inspecJon

*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)

*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for

recharging shou!d be carried out on board

6ヶ 月ごとの点検 Semi― annud inspecJon

Lockers providing storage for ttre― ■ghting equipment contain proper inventory and

equipment is in proper condition

C/0

5

*1詰め替え用 消 火剤 数量確 認

*l Ref‖ s for portable ire extinguishers are to be checked

O泡消 火器 消 火剤for AB foam ire ex nguishers

○粉末消火器消火剤for dry chemical ire exunguishers

数量/quanlty

C/0 C/0

6

固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩

みがないこと

A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for

tightness on ixed ttre― extinguishing insta‖ations.

Trang 54

月ごとの 点検 Month inspeC On

貢 任 看P.I.C

Radio communication equipments are to be operated

双 方 向無線機 Two way VHF radio telephone:

Trang 55

3ヶ 月ごとの 点検 Quarte‖ y inspecJon

*1合計 数 が10を超 える場 合 10に10を加 えた数 に05を乗 じて得 た数 を加 えた数(60を超 える場 合 にあつては60とする)

*l Spare charges sha‖ be provided for 100%of the lrst 10 extinguishers and 50%of the remaining ttre extinguisherscapab!e of being recharged on board Not more than 60 total spare charges are required lnstrucltions for

recharging shou!d be carried out on board

6ヶ 月ごとの点検 Semi― annud inspecJon

Lockers providing storage for ttre― ■ghting equipment contain proper inventory and

equipment is in proper condition

C/0

5

*1詰め替え用 消 火剤 数量確 認

*l Ref‖ s for portable ire extinguishers are to be checked

O泡消 火器 消 火剤for AB foam ire ex nguishers

○粉末消火器消火剤for dry chemical ire exunguishers

数量/quanlty

C/0 C/0

6

固定式消火装置のケーブル操作装置の止め金具と全ての C02容 器の連結部に緩

みがないこと

A‖ C()2 bottle connections for cable operating system clips sha‖ be checked for

tightness on ixed ttre― extinguishing insta‖ations.

Trang 58

月ごとの 点検 Month inspeC On

貢 任 看P.I.C

Radio communication equipments are to be operated

双 方 向無線機 Two way VHF radio telephone:

Ngày đăng: 09/05/2016, 19:24

w